Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC | L1 | Accepted-AOC First Lowest | |
| 2 | L2₹11.8 L+₹9.76 (<0.01%)Rejected-AOC NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | L2 | Rejected-AOC Second Lowest | |
| 3 | L3₹12.4 L+₹54,713.82 (4.64%)Rejected-Finance | L3 | Rejected-Finance Third lowest | |
| 4 | L4₹15.8 L+₹4.0 L (33.9%)Rejected-Finance | L4 | Rejected-Finance Fourth lowest |
Tender Value
₹14.4 L
EMD Value
₹35,989
Closing Date
28 Nov 2022, 5:00 pmClosed
Executive Engineer
Executive Engineer IIP Division No II Chalakkudy
Correcting longitudinal slope and rectification works for Parakkadavu Main canal between Ch. 30/200km and 33/200km to ensure water availability at tail end of Parakkadavu Main Canal
2022_Irrig_529735_1
E/IRR/PII/TR/1411/2022_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
120 days
Parakkadavu
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹35,989
Yes
4 Apr 2023
17 Nov 2022
2 Dec 2022
17 Nov 2022
28 Nov 2022
17 Nov 2022
Amount
Appendix
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1/2:3 (cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
DAISY JOSE
STALIN V V
GANGADHARAN V K
Bidder Name
DAISY JOSE
GANGADHARAN V K
STALIN V V
BENNY K T
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_765841.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .