Loading…
Loading…
Tender Value
₹16.5 L
EMD Value
₹16,455
Closing Date
4 May 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
DY.CITY ENGINEER (SOUTH ZONE)
Work to make MS sections as per requirement in the existing water network line in Isanpur ward of South Zone.
296759
tender notice no.01 2026-27 tn no.21
Open
Civil Works
Ahmedabad
5 documents required · 5 mandatory
₹900
Municipal commissioner, Ahmedabad
₹16,455
15 Apr 2026
15 Apr 2026
15 Apr 2026
4 May 2026
15 Apr 2026
3)Tender Opening Date:-To Be Intimated After Technical Bid eveluation
Assistant Manager (South zone), Ahmedabad Municipal Corporation
South zone Office Building, Rambaug, Maninagar, Ahmedabad
Deputy Municipal Commisioner
AHMEDABAD MUNICIPAL CORPORATION
"South Zone Office", Opp. Fire Station, Rambaug, Maninagar, Ahmedabad - 380
Municipal Commissioner invites Percentage Rate sealed tenders from interested
contractors for :- œrûtK Ítullt Rmlvwh Jtuzobtk ngt< vtKelt luxJfole jtRllbtk sYhegt< bwsc yub.yum
mufNl fhJtlt ftb ctc<.
1 Name of work œrûtK Ítullt Rmlvwh Jtuzobtk ngt< vtKelt luxJfole jtRllbtk
sYhegt< bwsc yub.yum mufNl fhJtlt ftb ctc<.
2 Time Limit 12 Months(Excluding monsoon)
3 Tender Validaty Period 120 Days from the date of submission of the tender
4 Eligibility Criteria Register “E1” class in PWD in Govt. R&B/CPWD/AMC or
equivalent registration with any other state Govt. or institutions.
5 Estimated Cost put to tender Rs.
6 Earnest Money Deposit Rs.16455/- (Demand Draft or Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad /) To be submitted as
prescribed in 9.0 below. Demand Draft or Bank Guarantee shall be
from Nationalized Bank / Sheduled Bank and valid for
days.(As per AMC finance dept.circular No-5 Dt.5/5/07 & F.D.
Circular No. 29 Dt.7/08/2010) & attched ANNEXURE - 1 finance
dept.circular No-22 Dt.11/8/11& circular No-8 Dt.04/05/12 , circular
No-03 Dt.13-05-14 & Finance circular No-56 Dt.19-09-16 &
Circular No.18 Dt:23/5/2017 & Circular No.18 Dt:29/5/2018 &
Circular No.12 Dt:22/7/2019 & Circular No.26 Dt:25/11/2019 &
Circular No.21 Dt:19/6/2020. & Circular No.40 Dt:6/11/2020 &
Circular No.41 Dt:- 08/2/2022.
7 Security Deposit 5 % Of the Tender amount in Form Bank Guarantee / Demand
Daft / Pay Order / Banker’s Cheque.
8 Tender fees Rs.900.00 Demand Draft in favour of Municipal Commissioner,
(Non refundable) Ahmedabad)
9 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along
Tender Fees with Tender as described in the invitation of tender and submitted
to Assistant Manager(South zone) , South zone office, Rambaug,
Maninagar Ahmedabad
Tenders issue date As Per NIT
Last date of receiving As per NIT
Date of Opening As per NIT
Price bid e-form as well as Price bid should be submitted online
only and unloaded to n-procure web site mentioned on NIT and
only Technical bid should be submitted physically in sealed
Mode of sending the envelope systems By RPAD/Speed post/ Hand Delivery in sealed
13 Tender covers in Duplicate ( One Original & One Duplicate) duly sign &
Documents seal by contractor as per schedule given on NIT.Tenders received
without EMD and without uploading price bid to n procure web site
shall be considered as Non-Responsive and shall be rejected
All general condition of contract of Form B1 condition of contract
14 Terms, Condition, &
shall be applicable and latest AMC circulars and policy should be
Defect & Liability Period The contractor shall be responsible to make good and remedy at
his own expense any defect which may develop or may be noticed
before the period mentioned hereunder from the certified date of
completion, The within 15 days of receipt of the notice. In the case
of failure on the part of the contractor, the Engineer-in-charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer-in-charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards the
expenses, if any, Incurred by him in rectification, removal or re-
execution. The Defects Liability period shall be as under(a) for all
works costing upto Rs. 50,000 ( amount put to tender), the period
shall be 3 months from the certified date of completion. (b) for all
works costing more than Rs. 50,000 and upto Rs. 1 crore (amount
put tender), the period shall be 6 months from the certified date of
completion or one monsoon, whichever is later. (c) for major
projects costing more than Rs. 1 crore, the period shall be
months from the certified date of completion which should include
one monsoon. (d) For building works, the period specified in (a),
(b) or (c) above OR elapse of monsoon period following the
certified date of completion, whichever is later. For the purpose of
deciding the monsoon period, the 30th September may be treated
as the last date.
16 Liquidity Damages 0.1% per day delay of remaining work after the
completion date but not more than 10% of cost of
remaining works.
17 E.P.F Act ykkdu As per Account department circular no-37
18 GST ykkdu Rates Quoted by the contractor to be inclusive of all
applicable taxes (Excluding GST). Prevailing GST will be
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any
or all the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Addl City Engineer
Finance dept. circular No-41 Dt.8-2-22
yt&e <btb Ft<tlt Jzt yr^fthe©eytu/yuftWLx©e <&t rcjfjtfo©elu sKtJJtbtk ytJu Au fu, rm¾gwhexe zevtuÍex <ubs
yluoMxble zevtuÍex MJefthJt ctc<u htßg mhfth©e îtht bksqh &guj cukftule gtœebtk ltKtk rJCtdlt S.yth. lk. EMD/10/2021/7729/DMO
Dt. 28/6/2021 bwsc mw^thtu fhe lJe gtœe cnth vtzJtbtk ytJuj Au.
htsg mhfth©elt ltKtk Ft<tlt S.yth. lk. EMD/10/2021/7729/DMO Dt. 28/6/2021 îtht rm¾gwhexe zevtuÍex
<ubs yluoMxble zevtuÍex btxu bkswh &guj cukftule gtœe ykdu zu.Bgwrl.frb§h ©e (ltKtk) le b¤uj bkswheltk XhtJ ¢btkf 168 <t.05-02-2022
bwscltk mœhnw vrhvºt «rmæ^ > <theF ctœ&e <t.31/03/2022 mw^e y&Jt htßg mhfth ©e îtht yt ctc<u yLg S.yth. «rmæ^ fhJtbtk ytJu
ðgtk mw^e yuluûth- I btk sKtJuj cukftule cukf duhukxe me¾gwhexe zevtuÍex <&t R.yub.ze. MJYvbtk MJefthJttbtk ytJNu.
xuLzhekd ytu&tuhexe îtht cukf duhkxele ytu&uLxemexele aftmKe fhelu sYrhgt< bwsclt fLx[tuj «tumesh muxyv fhJtlt hnuNu.
<ubs mhfth©elt S.yth yLJgu zu. Bgwrlrmvj frbNh©e (VtgltLm) le b¤uj bksqhe bwsc btºt ybœtJtœ Nnuh <&t ybœtJtœ rmJtglt yLg
Nnuhle ntug ylu <u cukf duhkxe ybœtJtœ rM&< mckr^< cukfle NtFt îtht yr^f]< fhtguj ntug <uJe leau sKtJuj cukftule NtFtytule cukf duhkxe
MJefthJtbtk ytJNu. ltKtkFt<t îtht Wvhtuf< mkœCobtk sKtJuj vrhvºttule yLg <btb Nh<tu g&tJ< hnuNu.
(A) Guarantee issued by following banks will be accepted as SD/EMD on permanent
All nationalized banks
(B) Guarantees issued by following banks will be accepted as SD/EMD for the
period up to March- 31, 2022. The validity cut-off date in the GR is with respect
to the date of issue of Bank Guarantee irrespective of the date of termination of
Bank Guarantee.
1 Commercial Banks :-
5. Kotak Mahindra Bank
6. IndusInd Bank
8. Tamilnadu Mercantile Bank
9. Ujjivan Small Finance Bank
10. A U Small Finance Bank
11. Federal Bank
12. Equitas Small Finance Bank
13. Bandhan Bank
14. Standard Chartered Bank
15. City Union Bank
2 Co-operative and Rural Banks Of Gujarat :-
1. The Mehsana Urban Co-operative Bank Ltd
2. The Ahmedabad Mercantile Co-Operative Bank Ltd
3. Nutan nagrik Sahakari Bank Ltd
4. Kalupur Commerical Co-operative Bank Ltd
5. Rajkot Nagarik Sahakari Bank Limited
6. The Gujarat State Co-Operative Bank
7. Sarswat Bank
8.Saurashtra Gramin Bank
Seal and Signature of the Bidder Addl City Engineer
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender document for
the construction of works (as defined in these documents, hereinafter referred to as "the Works") detailed
in the table given in the IFB.
1.2 The Works consist of:- Providing and Supplying Chota Hathi for Maintenance Work of Road
Work ,Building Work,Drainage Maintennace at Isanpur Ward in south zone.
2. Source of Funds
1.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL CORPORATION.
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the following
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
The bidders shall have a registration with State PWD, and/or CPWD for "E2" class and or
equivalent. If contractor is not registered with AMC in the relevant class, on award of contract he
shall be required to register himself with AMC within 3 month's time.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as the
Employer shall reasonably request.Subject to Submition of Succsesful Submition as per Clause –II of
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction of the
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
5. Qualification of the Bidder
To be qualified for award of Contract, bidders shall:
a) Submit a written power of attorney authorizing the signatory of the bid to commit the
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall be
valid for 28 days beyond the validity of the bid.
2.2 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be returned as promptly
as Early as possible as but not later than 28 days after the expiration of the period of bid validity.
2.3 The EMD of the successful bidder, along with second and third lowest tenders, will be returned when
the bidder has furnished the required performance security and signed
2.4 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) Furnish the required Performance Security or
ii) Sign the Agreement.
3. (A) Security Deposit :-
Within 10 (ten) Working days of the date of receipt of the Letter of Intent (LOI) the successful bidder
shall deliver to the Employer, a Initial Security Deposit Shall be submitted as per C.E. Circular.in
the form of a Bank Guarantee / DD/ Pay Order / Banker’s cheque for an amount equivalent to 5%
(Five percent) of the Contract Price.
Failure of the same shall make the contractor liable for any penalty as decided by AMC. At
present a policy is framed by Audit department of AMC to charge 4% interest for the
balance period and discontinuity period.
The Security Deposit to be provided by the successful bidder in the form of a bank guarantee as
per format shall be issued as per Memorendum of work.
(E) Retention :-
a). Retention @ 2% of the value of work done will be deducted from each RA bill. It will be released
along with release of payment of Final Bill.
4. Approved Bank: - As per Annexer -I
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to any extent and contractor shall not claim any extra rate for the
8. Penalty: - As Per City Eng. Circular no-3 Date:-03/09/2016
9. Tax, Duties on Materials
All charge on account of Octroi ,excise duties, terminal tax, sales tax. Service tax, VAT etc. on
material procurement or any other component for the works from any source shall be borne by the
All duties, taxes, Service Tax and other levies payable by the Contractor under the Contract, or for any
other cause as of the date 28 days prior to the deadline for submission of the bids, shall be included in
the rates and prices and the total bid price submitted by the bidder and the evaluation and comparison
of bids by the Employer shall be made accordingly.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender amount
shall be deducted against works welfare cess.
Seal and Signature of the Bidder Addl. City Engineer
Date: (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Months (Excluding monsoon)after the order to start the works. Progress
of work should be in proportion to time limit. The details of reinforcement of R.C.C. work shall be as per
design and instructions of Add. City Engineer and his order will be considered final.
The contractor shall have to maintain account of steel, cement and other materials that may be brought
by him on site. This account shall be regularly maintained and kept open for inspection by Municipal
Staff. Watering of all the items shall be as per instructions otherwise no payment shall be made to
contractors. Mixing of concrete shall be done by concrete mixer machine. Arrangements of binding
vibrator for R.C.C. works if required shall have to be made by the contractor.The contractor shall be
remain responsible for Workmen’s compensation if any accident. The contractor shall arrange for
barricading at night and arrangement of Pagi at night to direct the traffic. He shall be responsible for
any damage to public. If any incident happen, during the execution of work. In case of dispute for
unseen or overlooked items the decision of the Dy. City Engineer shall be final. The contractor shall
have to give site clean of all rubbish during the work and at the time of completion of work and hand
over the site with final finishing of the work as directed. All the rejected materials shall be removed
from site within 24 hours by contractor at this risk and cost. Debris shall have to cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose contractor shall have
to prepare through of bigger size and mix the mortar in the required proportion. In on case he shall be
allowed to mix the mortar either on floor or any finished surfaces. The contractor shall have to make his
own arrangement for water required for the work.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he
shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not
available in SOR than based on current market rates. In case of extra item decision of Add. City Engg. shall
remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work
the contractor shall carry out the same at his quoted rates without charges any extra and the contractor will
have to carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for
subsequent changes in site and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the contractors shall have to
prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for
this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the
period. If any tenderer withdraw or makes any modifications or addition in the terms and conditions of his
tender not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to any
right or remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of
demand draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form
B1 can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat
booklets of Building Works & and Road Works Specifications published by Gujarat Book Depot,
Sector-21. Gandhinagar.
CONTRACTOR'S SIGNATURE ADDL.CITY.ENGINEER
& STAMP (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT / WATER
RESOURCES DEPARTMENT may be referred.(only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1 of
Gujarat State Road and Building Department / Water Resources Department shall be applicable.
binding on the contractors unless specifically mentioned about it
Hereunder in clause no.15 to
02. Please read “Ahmedabad Municipal Corporation “instead of “Government / Government of
Gujarat “wherever written.
03. Please read “ Ahmedabad Municipal Corporation “ instead of “ Government of Gujarat State
Public Works Department/Public Works Department/ Government “ wherever written.
04. Please read “City Engineer" instead of “Superintending Engineer” or “Executive Engineer”
wherever written.
05. “Ahmedabad Municipal Corporation“ herein called as“AMC “
06. “Governor for the state of Gujarat“ shall be read as “Municipal Commissioner/Ahmedabad
Municipal Corporation ”
07. The contents / details / information mentioned in the relevant point under the heading
Seal and Signature of the Bidder Addl. City Engineer
Technical conditions
1. Tenderer should be registered in PWD/ in Govt. R&B /CPWD / AMC or equivalent
registration with any other state Govt. or institutions. Copy of registration should be
attached with tender document. Tenderer who was not registred in AMC must be get
registred in panel of approved AMC contractor.
2. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water
Resources Department with the correction slips made up to 15-08-1999 may be referred.
(only English version)
3. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
4. Wherever a reference to any Indian standard appears in the specifications, it shall be taken
to mean as reference to the latest edition of the same of force on the date of agreement.
5. In "Mode of measurement" in the specifications wherever a dispute arises in the absence
of specific mention for a particulars point / aspect, the same in the relevant Indian
Standards shall be referred to.
6. All measurement and computations, unless otherwise specified shall be carried out nearest
to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
7. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
8. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsœver on account of
any such materials being rejected by the Engineer in charge.
9. The contractor’s rate for the item of work shall be for the work completed in all respect.
10. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
11. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
12. All work shall be carried out in a manner applying the best technique.
13. All tools, templates, machinery and equipment for correct execution of the work as well
as for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work.
14. Special modes of the construction not adopted in general Engineering practice, if
proposed to be adopted by the contractor shall be considered only if the contractor
provided satisfactory evidence that such special mode of construction and completion of
work to the required strength and quality. Acceptance of the same by the Engineer in
charge shall not however, absolve the contractor from the responsibility of any adverse
effect and concordance of adopting the same in the course of exaction or completion of
15. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government
from time to time.
16. All necessary safety measures and precautions (incl. those laid down in the various
relevant Indian Standard) shall be taken to engrave the safety of men, materials and
machinery on the work and also of the work itself.
17. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
18. Contractor shall have to execute extra item if required.
19. The work in general shall be carried out as per standard specifications of the relevant
items to be executed & as per the instruction of Engineer in charge & as per the guidance
of AMC's Consultant for this project.
20. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
21. The time limit shall be reckoned after 15 days from the date of issue of the written work
order to the contractor. No time extension will be granted under any circumstances.
22. In case of any ambiguity in specifications mentioned in this tender, the interpretation
given by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
23. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations
as necessary to fulfill the intent of the plants and specifications.
24. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
25. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
26. No any kind of price rise / price escalation / price variation for cement , steel or labour
27. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
28. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water
for drinking, washing, sanitation and cleaning down. The contractor will be responsible
for all the costs where applicable of connection, meter installation, water consumed, water
required for testing purposes, disconnection and the laying, maintenances and ultimate
removal of any distribution system around the site.
29. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site
for purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for
use of diesel operating sets etc. as the case may be.
30. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income
tax clearance certificate and solvency certificate.
31. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
32. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
33. The electrical works shall be carried out strictly in accordance with the directives issued
by Engineer in charge.
34. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
35. In case of any dispute, decision of Municipal Commissioner shall be final and binding on
the contractors.
36. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
37. The contractors are requested to quote their rates considering above tender conditions.
38. The contractor shall have to execute the contract agreement within 15 days from the date
if issue of work order.
Eventhough in special case, If work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of
starting of work will be consider after approval of Dy.M.C. (South zone)
39. The Contractor shall not claim for increase or decrease in the quantity of the item or the
40. The payment shall be made as per the A.M.C policy for the work done by the contractor.
41. Conditional tenderes will not be accepted.
Seal and Signature of the Bidder Addl. City Engineer
ybœtJtœ BGþrlrmvj ftuvotuhuNl
œÂûtKÍtul - Esluh Ftðþ
ftb btxulwk xftJthe œh Jt¤wk xuLzh ylu ftuLx[tfx
xuLzh btxule Nh<tuu
1 y: yt xuLzh su <u Jdolt y.Bgw.ftu y&Jt fuLî{ y&Jt htsg mhfthle btLg gtœelt ftuLx[tfxhtu Che NfNu.dJobuLxlt
btLg ftuLx[[tfxhu y.Bgw.ftuvtuo. bt btLg ftuLx[[tfxhtu le gtœebtkk hSMxuNl fhtJJtlwk hnuNu.
1 c: btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u stuzJtle hnuNu.
1 f: xuLzhhle jtgft< ftb sJtcœth xuLzhh <ubs su xuLzhh mwaJuj ftuLx[fxhle ©uKebtk ytJ<t ntug <ubs ftb fhJt
mûtb ntug <ublu s ytvJtbtkk ytJNu. ftb yvt<t vnujt ftuLx[tfxhu ftb mkk<tu»tfthf <ubs xtRb jebexbtkk vwÁk fhJt sYhe
mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo hsw fhJtlt hnuNu.
1 z: ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth <&t mexe.Rsluh
mh¾gwjh,lk -17,<t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve,heLgwyj Ve
<&t yvd{uzuNl Ve ylu btv œkztu ægtlbtk htFe <u bwsc ybj fhJtltu hnuNu.
1 R: xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe btdo, mkkath ylu
JvhtNlt ceò hM<tytu&e mkk<wÐ ntuJtlwk btle juJtbtkk ytJNu. xuLzhhu ftblu mtRx ylu rcÕzekkd(fu su ftb fhJt, ftb
vwhwk fhJt <&t ftblt buRxulLm btxu cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekkd btxu, gtzo, zevtu
btxule søgt vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm btxule
2: yt ftble mbg bgtoœt (12 btm atubtmt rmJtg) le hnuNu. (bubtuhuLzbbt sKtJuj «btKu)
3: xuLzh Jujezexe rvhegz (120 rœJm) (As Per City Eng.Circular no-3 Date:-03/09/2016) )
4: xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
xuLzh Vtubo ylu ylwmwrabtkkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt œM<tJus vh< fhJtlt
6: ftuLx[tfxhtuyu leaule ctc<tu ft¤SvwJof JtkkaJt rJlkk<e Au.
1) J^w fu ytuAtle xftJthelt œh Nçœtu <ubs ytkkfztbtkk ytvJt.
2) ftuR fkkvlelu ltbu xuLzh juJtbkkt ytÔgwk ntug <tu fkkvle J<e xuLzh vh mne fhlth Ôgrf<lu yr^f]< fh<wk
bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
3) Bgwrl.ftuvtuohuNllt «J<obtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u cezJtle hnuNu.
4) ftuLx[tfxhu RLfbxuût mkkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
5) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
6) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne fhJe.
7) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
7: AufAtf xuLzh Chlthlu sKtJJtbtkk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth fhJt œuJtNu lrn
ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultkk jFtKbtkk ftuR Cwwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu
ytkkfzt vh Auftu bthelu <ult mtawk jFtK fu ytkkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwk fe mne fhJe.
8 y: xuLzh hsw fh<tkk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtkk ytÔgw lrn ntug <tu xuLzh ybtLg
dKJtbkkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg
rlgbtu ylu mwaltytu vK ft¤SvwJof JtkkaJt rJlkk<e Au.
1) ftuRvK fthK œNtoÔgt rmJtg ftuRvK fu c^t xuLzhtu yMJefth fhJtltu nf yctr^< hnu Au.
8 c: Wvhle ctc<tu Wvhtkk< xuLzh leault mkkstudtubtkk <h< ybtLg XhJtlu vtºt &Nu.
1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt vîr< y&Jt rJd<tubtkk
bwfuj Nh< y&Jt mw^thtbtkk ftuR VuhVth mwaJ<t ntug.
2) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkkÏgwk/ltkkÏgt ntug fu cœÕgwk/cœÕgt ntug.
3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
5) xuLzh Chlth y&Jt vuZele ctc<btkk œhuf Ctdeœth y&Jt <u ykkdulwk bwFðgthltbwk ^htJlth Ôgrf< mne l fhu
y&Jt xuLzhbt <u btxu htFJtbtkk ytJuje søgtbtkk mne/mneytu Wvh ftuR mtûteyu mtF fhe l ntug.
8 f: Nh<e xuLzh MJefthJtbtk ytJNu lne.
8 z: xuLzh MJefthJw , hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu rlKog ytFhe hnuNu. ftuR
fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykkdu ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtu
fhe NfNu lrn fu ftgœtfeg ftgoJtne yt ykkdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve s œuJtlwk Au <uJtu &R
9: rJmkkdr< ylu rnmtc stud: nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtf btklt sÚ&t ylu hfble ftuRvK Cwjawf
leault rlgbtu ylwmth mhCh fhJtbtkk ytJNu.
1) xuLzh Chlthu œhlt Ftltbtkk sKtJuj Nçœtu ylu ytkkfzt Jåau ftuR ymkkdr<lt fumbtkk Nçœtubtkk sKtJuj hfb btLg
htFJtbtkk ytJNu.
2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtf lt Ftltbtkk&e hfbbtkk Cwj
sKtg <tu yufb œh btLg htFJtbkkt ytJNu ylu œhlt yt^thu dwKtfth mw^thJtbkkt ytJNu.
3) yufblt Ftltbtkk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkkt ytJNu.
4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkkfzu fhuj ftuR vK ctc< ægtlbtkk juJtbtkk ytJNu lrn.
10y: ftbltu «tud{um mbg bgtoœt bwsc fhJtltu hnuNu. yt mbg bgtoœt 10 jtF mw^elt ftb btxu yuj.ytu.ytR.
ytÃgt <theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR. ytÃgt <theF&e 15 rœJm&e NY
&guj dKJtbt ytJNu. <&t <u œhrbgtl ftble 5% juFu zevtuÍex Che fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût mrn<lt CtJ dKJtbtk ytJNu.
ylu <ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu J^thtu awfJJtbtk ytJNu lrnk.
10c: mûtb m•tt îtht Yt.10,00,000.00 (œm jtF) mw^elt xuLzhle bkswheltu XhtJ vtzgt ctœ ( LOI) ytvJtbtk
ytJNu ðgth ctœ rœl - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze ChJtlt
rfMmtbtk Bgwrl.ftuvtuohuNlbtk «J<obtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
10f: mœh ftbltk xuLzhbtk bw¤ bkswh &guj mbgbgtoœt / Extended Time Limit ctœlt ftbdehe vqKo l &tg <tu
FhuFh ctfe ftble hfblt 10% juFu Liquidated Damages (vulÕxe) Jmwj fhJtbtk ytJNu. (mexe
Rsluh(Rsluh Ft<w) mhfgwjh lk.3 <t. 03/09/2016 bwsc.)
11 y: awfJKe xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkkfujt œh vwhtk &gujt ftb btxult Au ylu <ubtk bswhe,
vtjF, ÃjtLx, œuFhuF,mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug Jduhu ykkNu <btb Faoltu <&t sYh sKtg <tu ylu
ðgthu ht<vt¤elt ftblu juJt c^t J^thtlt Faoltu mbtJuN &Nu ylu xtkkfujt CtJ fu œh fh<t J^thtle ftuR awfJKe ykkdult
<ublt ftuR œtJt ægtlbtkk juJtNu lnekk ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR Ôgrf<yu(vAe<u ctkk^ftb
rJCtdltu fboathe ntug fu l ntug)<ublu ytvuje btne<elu yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnekk. <ublw
xuLzh ChJt <&t <ubtkk swœt swœt CtJ ylu œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu fthKu
vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtkk&e WCt &<t ftuR stuFb fu sJtcœthebtkk&e Axfe NfNu lnekk. mœh ftbbtk ftuR vK
ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu ytvJtbtk ytJNu lrnk.
11 c: ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt ytJNu.<&t Bgwrl.
frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu ftbdehe/ybj fhJt ckDlf<ot hnuNu.
11 f: ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh bwsclwk vubuLx + yu¾x[t
ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj cejbtk vh< ytvJtbtk ytJNu.
11 z: htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u bwsc ftuLx[[tfxhlt
cejbtkk&e fvt< fhJtbt ytJNu.
12: yu)fhth mkkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw vzNu.
ce)xuLzhbtk œNtoJuj ftb mkkck^e œM<tJusbtkk œNtoJuj rJd<btkk rJmkkd<<tlt rfMmtbtk leau œNtoJuj ¢btlwmth
œM<tJusbtkk œNtoJuj rJd< d{tng htFJtbkkt ytJNu.
yu) yufb ylu fœ (1) z[turkRd
(2)xuLzh Vtubolwk CtJvºtf
ce) z[tuRkdbtk fœ, ytfth, ytkkfzt fœta Ftuxt ntug <tu btvujtkk fœ, ytfthlu ylwmhJwk.
3. xuLzh Vtubole ylwmwra-ce
Cwj Chujt fu Ftuxt JKollt rfMmtbtkk yt mkkck^e Wvhefûttyu rJmkkd<<t ykdule ltuk^ bwfe
yuze.me.R/zu.Bgwrl.frb./Bgwrl.frb.le bkswhe bu¤JJtbtk ytJNu ylu <u bwsc fhJtbkt ytJuj rlKog ykkr<b dKJtbkkt
13 : xuLzhhu z[tuRkd fu MvuNeVefuNlbtkk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe ylu Rsluh Rl-atsuo
Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl fhtJJwk.
14 : yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
15 : yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s c^u NY fhJw vzNu.
16 :atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu lwfNtl &Nu <tu <ule
mkvwKo sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt
òlbtj lu lwfNtl &tg <ule sJtcœthe ftuLx[tfxhle hnuNu.vtujem Vhegtœ &tg <tu <ule sJtcœthe vK ftuLxtfxhle
hnuNu. CuFz Dme l vzu <ule sJtcœthe vK vtujem Vhegtœbt ftuLx[tfxhle hnuNu.CuFz Dme l vzu <u btxu mjtb<elt
vdjt (suJt fu œtuhzwk k ctk^e bswh Ftztbtkk W<thJt, mtuhekkd ylu Mx[[xekkd fhJt rJduhu) je^t Jdh bsqhlu Ftztbtkk k k
W<thNu <tu ftuLx[[tfxh s vtujem Vhegtœbt sJtcœth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu
sJtcœth hnuNu lrn.ytxjwk mbSlu s xuLzh ChJwk. Bswhtultu rJbtu vK W<thJtu.
17 : ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc jtJJtlt hnuNu.<&t sYh
sKtg <tu xuMxekd fhtJJtlwk hnuNu.<&t yt ykdu «Joðbtl Bgwrl.ftuvtuohuNlt rlgb bwsc bxehegÕm fu ceò xuMxed hevtuxo
ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao
ftuLx[tfxhu CtudJJtltu hnuNu.
18 : M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu rlgb ylwmth <u ykdu
ftb fhJt ftuLx[tfxh ck^tgujt Au.
19: mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR sJtltu hnuNu.
yLg&t <ule lwfNtlle sJtcœthe ftuLx[tfxhle hnuNu.
20 :ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au.<ubt mhfth©elt «Joðbtl rlgb bwsc ve.yuV/juch yufx/vtujemlt
ftgœtlw vtjl fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle hnuNu.
21: ftuRvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobt hnuNu.
22: btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc W<thJtltu <ubs dtuXJJtltu hnuNu.
23: ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
24: yt xuLzhbtkk stu ftuR ytRxb hne dR ntug <tu <u y&tJ M&¤ M&e<e bwsc xuLzhbtk mbtJuN l ntug <uJe J^thtle
ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk
ytJNu ylu <u bwsc awkfJKe fhJtbtk ytJNu.
25: atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[[tfxhle hnuNu. subtkk vevzt,œtuhzt, Cgmwaf ctuzo,ÃjtMxef
vxe,rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwwk hnuNu. ylu ftuRvK yfMbt< &Nu <tu <ule mkkvwKo sJtcœthe ftuLx[tfxhle
26: M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg Ôgrf<lt yfMbt<lt rfMmbtk
juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem ftgoJtnele sJtcœthe ftuLx[tfxhle hnuNu.
27: stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubt œhhtus fhuj ftbdehe <&t
yr^ftheytuyu ftb mw^thJt fu vtu{d{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc
l &gu fu <u «btKu M&¤ Wvh ybj l &gu ftuLx[tfxhlu vulÕxe fhJtle mððtt yuze.mexe yuLSlehgh©elu hnuNu.
28: œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg htFuj MvuNeVefuNl Nh<tu
bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk yuze. mexe.yuLSlegh©eltu rlKog ytFhe
hnuNu.Jtuxhekd fhJtbtk lrn ytJu fu œhhtus J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh
ltuxemu Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtkk&e hfb ftve juJtbtk ytJNu.
29: juch JuÕVuh Vkkz btxu ntjbtkk htsg mhfth©eyu fhuj nwfb bwsc 1%(yuf xft) hfb cejbtk&e ftve juJtbt ytJNu.
30: su ftbtubtk atubtmtlt mbgdt¤tlu ctœ ytvJtle Nh<tultu WÕjuF ntug ðgtk atubtmtltu vehegz <t.15 swl &e
mÃxuBch Mþ^eltu dKJtbtk ytJNu. yt mbg œhBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u mbgdt¤tu
ctœ fhe ftble mbgbgtoœt dKJtbtk ytJNu <&t sYhegt< Bþscle xtEb jebex J^the vK ytvJtbtk ytJNu.
31: ftuLx[tfxhu «J<obtl ybœtJtœ Bgw.lemevtj ftuvtuohuNl lt JF<tuJF< lt mhfgwjh bwsc ve yuV,Jux <&t ylu
muÕm xuût lu jd<t vwhtJt vubuLx fh<e JF<u sYh vzu&e hsw fhJtlt hnuNu.
yufhthlwk Vtubo
1) nwk /ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tkk vnujtkk buk/ybu M&¤le bwjtft< je^e
Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-
btne<e bu¤Je Au.
2) nwk /ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t
œM<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
mh¾gwjh lkch 3, <theF 3/9/16
Bgwrlrmvj ftuvtuohuNlbtk Rsluh rJCtd îtht htuz, vtKe, rcÕzekd, z[ulus, jtRx rJduhult ònuh sl<tle mrwJ^tlt
rmrJj ftbtu fhJtbtk ytJu Au. mkcr^< ftbtubtk swœt swœt Ítul <&t «tusufx îtht yufmwºt<t s¤JtR hnu <u nu<w &e
y.Bgw.ftu.îtht JF<tu JF< fhJtbtk ytJuj swœt swœt mhfgwjhtubtk leau bwscltu mw^thtu Bgwrlrmvj frbNlh©ele
b¤uj bkswhe ylwmth fhJtbtk ytJu Au.
1. y.Bgw.ftu. îtht Rsluh Ft<t îtht bkdtJJttbtk ytJ<t xuLzhbtk ftble sYhe Nh<tu mt&u Vtubo ce-1 le
jtdw vz<e <btb Nh<tu bwscle ftbdehe fhJtle hnuNu vhk<w vulÕxe btxu ltKtkFt<wk vrhvºt lk.-18,
<t.-04/07/2012 lt bwœt lk.1-R btk mwaÔgt bwscltu yuxjufu leau bwscltu fjtuÍ xuLzhtubtk htFJtltu
rlg< mbgbgtoœtbtk ftb vwht l &tg <tu vuLtÕxe Jmwj juJt ctc<:-
(1) nJu vAelt <btb xuLzhbtk bw¤ bkswh &guj mbgbgtoœt / Extended Time Limit ctœlt FhuFh ctfe
ftble hfblt 10% juFu Liquidated Damages (vulÕxe) Jmwj fhJtle Nh< nJu vAelt ftbtbtk
htFJtle hnuNu <&t ntjbtk atj<t ftbtubtk <&t su ftblt Vtglj cej cluj l ntug <uJt ftbbtk vK bw¤
bkswh &guj mbgbgtoœt / Extended Time Limit ctœ &guj ftble vulÕxe Jmwj fhJt ykdu bq¤
bkswh &guj mbgbgtoœt / Liquidated Damages ctœlt FhuFh ctfe ftble hfblt 10% juFu
Liquidated Damages (vulÕxe) Jmwj fhJtlwk sYh sKtg <tu yt bwscltu rlKog juJtle m•tt
Bgw.frbNlh©elu ytvJtbtk ytJuj Au.
(2) xuLzhbtk Milestone recovery (Time yt^the<) le Nh< htFJtbtk ytJuj ntug Au sultu ybj
Ft<tyu fhJtltu ntug Au. vhk<w, ftbdehelt ybjefhK œhrbgtl y.Bgw.ftu.lt fthKtumh ftbbtk rJjkc
&guj ntug sule òK Bgw.frbNlh©elu fhuj ntug <&tmûtb m•ttyu bwœT< J^ fhuj ntug <u JF<u mbd{ ftb
Extended Time Limit btk vwKo &guj ntug <tu Milestone recovery (Time yt^trh<) le
fvt< fhJtle hnuNu lne su bwsclu Nh< nJu vAelt ftbbtk htFJtle hnuNu. Yt bwscltu ybj ntjbtk
atjw ftbbtk <&t su ftblwk Vtglj cej cluj l ntug <uJt ftbbtk fhJtlwk sYh sKtg <tu yt ykdu
Bgw.frbNlh©ele sYhe bkswhe bu¤JJtle hnuNu.
2. y.Bgw.ftu. îtht Rsluh Ft<t îtht bkdtJJttbtk ytJ<t rmrJj ftbtult xuLzhbtk (1) stu xuLzh mekdj-cez
vræ^r<&e bkdtJuj ntug ylu xuLzhle hfb 50 jtF&e ytuAe ntug <tu xuLzhle Jujezexe vehegz 90 rœJm
yLtu xuLzhle hfb 50 jtF&e J^w ntug <tu xuflefj cez FtuÕgt <theF &e xuLzhle Jujezexe vehegz
rœJm <&t (2) stu xuLzh xw-cez vræ^r<&e bkdtJuj ntug <tu œhuf rfMmtbtk xuflefj cez FtuÕgt <theF &e
xuLzhle Jujezexe vehegz 120 rœJm Au.
3. su ftuLx[t¾xhtu ze, R-1 ylu R-2btk ytJ<tk ntug <uytulu Yt.1.00 fhtuz mw^elt ftbtu btxu ltKtk Ft<tlt
mh¾gwjh lkch 43, <theF 17/10/2012 btk mwaÔgt bwscltu ybj fhJtltu hnuNu.
CONTRACTOR'SSIGNATURE ADDL.CITYENGINEER
& STAMP (South Zone)
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with the
terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad Municipal Corporation,
A'bad specified up to his first written demand, without demur without delay and without the necessity of a
previous of judicial or administrative procedures and without the necessity to prove to the Bank the
defects or short comings or debits of the contractor any sum within the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during the
period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the (Date
to be specified will not he less than 180 days from the stipulated date of receiving the tender) we shall be
discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consent of the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tenderer or of
Signature & Seal of Guarantor...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is accepted
and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TECHNICAL SPECIFACATION :
Cost Labour Work
Mode of measurement shall be on No basis
Cost of Materials
Mode of measurement shall be on kg/Bag/No/Cmt/lit/Rmt basis
Providing & Supplying of good quality of rubber rings for following dia meter.
Mode of measurement shall be on Nos. basis
Providing & Supplying Air Valve Ball
Providing & Supplying Air Valave Setting Ring
For Welding Joints
Mode of measurement shall be on shift/Nos basis
Rent of Tools & Other Charges
Mode of measurement shall be on Shift/hr/Nos/Trip basis
Providing laying and jointing in true line and level. U.P.V.C.Pipe(SCH40) for cold water including
fittings as approved by Engineer In Charge. Pipe shall be fixed on the wall with the help of clamp
at every two metre C/C or shall be concealed as directed in cluding necessary fittings etc.
including testing of pipe and joints and fixing the same with adhesive solvent, including cost of all
Mode of measurement shall be on Nos. basis
Charges for Water connection by making hole in CI/DI/MS main line (AMC water project SOR
Mode of measurement shall be on Nos. basis
Charges for repairing of HDPE Pipeline leakages, including bringing of all units, HPDP pipe welding
machine, raw materials, pipe cutting, jointing, grinding etc.also including transportation all
machinery at site. ( ARC 2023-24 Approved Rate)
Mode of measurement shall be on Joint. basis
Providing & suppling HDPE Flange as per required dia
Mode of measurement shall be on Nos. basis
For Masonry & RCC Work.
Mode of measurement shall be on Cmt/MT/smt./no. basis
Proving and Fixing F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers &Frames Cover : 728mm ø &
100 mm thick circular cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø plain
round bar for lifting the cover & should be fitted with plastic cups. Frame : 560 mm ø clear
opening, outer size- 888x888x175 mm. On the upper periphery of frame 25 x 3 mm wide MS flat
should be well embed in concrete to protect the edges of frame. FRC E.H.D.-35 manhole cover &
frame described as above. Rate also including Fixing M.H., Chamber or Catchpite Seat and Cover
in line and level to match exisisting road level in C.C.1:2:4 and finishing smooth, watering and
protecting for 7 days etc. complete as directed.
Mode of measurement shall be on Nos.basis
Providing, Fabrication and Fixing works of bird screen with angle 20x20x4 mm, flat 20x3 mm and
grill 30x30x3 mm including painting with enamal paint, welding and transportation etc.
Mode of measurement shall be on smt. basis
Labour charges for collecting sluice valves with tail pieces from Municipal stores loading,
transporting to the site, installing and jointing C.I. sluice valves inclusive of all jointing materail
like Bolts, nuts, washer, Rubber packing etc. comp.
Mode of measurement shall be on Nos. basis
Cutting of existing pipelines of following diameters including carting of nece. Specials from AMC
store to site and from site to AMC store (recovered materials) nace. Labours for excavation, jodan
& backfilling filter, supervisor, etc. complete. Rate also includes electric cutter, dewatering pump
fuel adn transportation of machineries, chain pulley block if requires working at an instructed
specific time of day or night etc. complete
Mode of measurement shall be on No.basis
Labour charges for collecting specials from Municipal Store loading, transporting to the site
,laying & Fixing C. I. specials inclusive of all jointing materials like lead, spun etc. and labour,
excavation re-filling and nece. dewatering as per instruction engg. In charge.
Mode of measurement shall be on kg.basis
Labour Charges for removing and recover of ex. C.I. Sluice valve with tail pieces and carting it up
to Muni.Store or site as per instruction of Engg. In charge item include. necessary Excavation,
removing or making joints, refilling etc.comp. as directed by Engg in charge.
Mode of measurement shall be on Nos. basis
Gas Cutting and Welding for pipes/plates Consolidating gas cutting pipes/plates etc. and butt
welding in all position with required number runs for MS pipes internal and/or extremely incl.
gauging wherever necessary fixing apprurtences and other accessories in connection with pipe
laying work as per specification.
Mode of measurement shall be on Rmt.basis
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site, laying in uniform layers in subbase / base course on
well prepared surface and compacting with vibratory roller to achieve the desired density.
Mode of measurement shall be on Cmt.basis
Design, Supply, Installation, Testing, Commissioning of Bourdon Type Pressure Gauge, ±1%
accuracy, Direct bottom 1/2" NPT (M) process connection, IP 67, Glycerine filled, SS304 Case with
Bayonet Type Bezel, SS316 L Bourdon Tube, SS 316 Movement material, Aluminium dial with
black graduation on white background, Micro Zero adjustable pointer, neoprene gasket, Blow out
disc, shatter proof glass, SS tag plate etc as per IS 3624..Range 0-6kg/sq.cm - -150 mm dia
Mode of measurement shall be on No..basis
To provide Tractor with Hydraulic Trolley, driver with fuel, to carryout different works during
day/night for 12 Hrs. Shift. Work shall be carried out as per the instructions of Engineer In-Charge.
No extra charged shall be paid for night shift.
Mode of measurement shall be on Shift.basis
Making connection of 450 mm dia DI/MS/HDPE Pipe with Existing Jaspur trunk main including
cutting the pipe to required annular shape of 450 mm dia. By Electro Welding and jointing
mm dia DI/MS pipe, including dewatering, excavation, refilling etc. with all required materials
such as welding rods and other necessary required materials including giving a satisfactory
leakage proof test.
Mode of measurement shall be on Job basis
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
œrûtK Ítullt Rmlvwh Jtuzobtk ngt< vtKelt luxJfole jtRllbtk sYhegt< bwsc yub.yum mufNl fhJtlt
Sr. Items Base 1) For ARC Per Tendered
No. Quantity Rate of Less Amount
1 Cost Labour Work
a Unskilled Labours per shift no.
100.00 (AMC Finance Circular No 08/ Dt 12/05/23) 452.00 452.00
b Skilled Helper per shift no.
100.00 (Labour Office Circular No 199/Dt 01/04/23) 474.00 474.00
c Fitter/Mason/Gas operator per shift no.
60.00 (ARC 2024-25 Approved Rate) 745.00 631.36
d Supervisor per shift no.
10.00 (ARC 2024-25 Approved Rate) 795.00 673.73
e Skilled Welder per shift no.
50.00 (ARC 2024-25 Approved Rate) 795.00 673.73
2 Cost of Materials
a Providing & Suppying Lead kg.
100.00 (ARC 2024-25 Approved Rate) 241.00 204.24
b Providing & Supplying Jute (Spun Yarn) kg.
500.00 (ARC 2024-25 Approved Rate) 99.00 83.90
c Providing & Supplying M-Seal 100 gm pack no.
10.00 (ARC 2024-25 Approved Rate) 30.00 25.42
d Providing & Suppying Cement bag Bag
10.00 (ARC 2024-25 Approved Rate) 395.00 334.75
e Providing & Supplying Kapachi + Grit- Cmt
(ARC 2024-25 Approved Rate)
f Providing & Supplying Sand Cmt
g Providing & Fixing Nut Bolt kg.
150.00 (ARC 2024-25 Approved Rate) 106.00 89.83
h Providing & Supplying MS Plate /sheets kg.
300.00 (ARC 2024-25 Approved Rate) 107.00 90.68
i Providing & Supplying MS Pipe /piece kg.
1,000.00 (ARC 2024-25 Approved Rate) 120.00 101.69
j Providing & Supplying MS Ring flange kg.
100.00 (ARC 2024-25 Approved Rate) 178.00 150.85
k Providing & Supplying MS Blank flange kg.
200.00 (ARC 2024-25 Approved Rate) 135.00 114.41
l Providing & Supplying Rubber Gasket kg.
100.00 (ARC 2024-25 Approved Rate) 90.00 76.27
m S.S. Spindle Rod, any Dia. With threads. kg.
50.00 (Wt.of Finished Material)(ARC 2024-25 Approved 1,168.00 989.83
n Gun Metal Nut with threads. (Wt.of finished kg.
(ARC 2024-25 Approved Rate)
o Providing & applying Rubber paint lit
25.00 (ARC 2024-25 Approved Rate) 245.00 207.63
p Structural Steel Work kg.
10.00 (ARC 2024-25 Approved Rate) 91.00 77.12
q Roller assemblies, Pully, Ball, Wire sling. no.
1.00 (ARC 2024-25 Approved Rate) 450.00 381.36
r S.S. wire Rope rmt
1.00 (ARC 2024-25 Approved Rate) 70.00 59.32
s Wooden float/Rubber ball no.
1.00 (ARC 2024-25 Approved Rate) 700.00 593.22
t Anchor Bolts no.
1.00 (ARC 2024-25 Approved Rate) 88.00 74.58
3 Providing & Supplying of good quality of 0
rubber rings for following dia meter.
a Rubber Ring for 400 mm dia pipe no.
1.00 (ARC 2023-24 Approved Rate) 400.00 338.98
b Rubber Ring for 450 mm dia pipe no.
2.00 (ARC 2023-24 Approved Rate) 450.00 381.36
c Rubber Ring for 500 mm dia pipe no.
1.00 (ARC 2023-24 Approved Rate) 540.00 457.63
d Rubber Ring for 600 mm dia pipe no.
1.00 (ARC 2023-24 Approved Rate) 650.00 550.85
4 Providing & Supplying Air Valve Ball 0
a 65 mm dia ball no.
- (ARC 2023-24 Approved Rate) 450.00 381.36 -
b 90 mm dia ball no.
- (ARC 2023-24 Approved Rate) 700.00 593.22 -
c 125 mm dia ball no.
- (ARC 2023-24 Approved Rate) 900.00 762.71 -
d 200 mm dia ball no.
- (ARC 2023-24 Approved Rate) 1,800.00 1,525.42 -
e 250 mm dia ball no.
- (ARC 2023-24 Approved Rate) 2,200.00 1,864.41 -
5 Providing & Supplying Air Valave Setting
a 50 mm dia ball no.
- (ARC 2023-24 Approved Rate) 200.00 169.49 -
b 75 mm dia ball no.
- (ARC 2023-24 Approved Rate) 250.00 211.86 -
c 100 mm dia ball(ARC 2023-24 Approved Rate) no.
d 150 mm dia ball no.
- (ARC 2023-24 Approved Rate) 550.00 466.10 -
e 200 mm dia ball no.
- (ARC 2023-24 Approved Rate) 600.00 508.47 -
6 For Welding Joints
a Rent of DG set per shift (With Diesel) shift
b Rent of Welding machine per shift (With shift
(ARC 2023-24 Approved Rate)
c Rent for Grinder machine per shift (With shift
(ARC 2023-24 Approved Rate)
d Providing & Supplying Gas Cutting set per shift
(ARC 2023-24 Approved Rate)
e Providing & Supplying LPG Bottle no.
f Providing & Supplying Oxygen Bottle no.
60.00 (ARC 2023-24 Approved Rate) 380.00 322.03
7 Rent of Tools & Other Charges
a Rent of Chain pulley block & Tripod per shift shift
- (ARC 2023-24 Approved Rate) 500.00 423.73 -
b Rent of de-watering Ele.pump (1.5 to 3 HP) shift
(ARC 2023-24 Approved Rate)
c Rent of de-watering pump with fual (1.5 to 3 shift
20.00 HP) per shift (ARC 2023-24 Approved Rate) 1,050.00 889.83
d Rent for JCB Machine Hrs
300.00 (ARC 2023-24 Approved Rate) 600.00 535.71
e Providing & Supplying hydra carne Machine Per
5.00 of 12 tone capacity on rental basis in case of 6,100.00 5,169.49 hr
emergency situation and break down type Shift
work & also during unavoidable condition 7 as
per instruction of engg.incharge , rate ncludes
all nece. shifting, fuel and operating charges .
(No payment should be allowed for non
working condition of machinery) (ARC 2023-24
f Transportation of machinery to or From site Trip
10.00 (ARC 2023-24 Approved Rate) 445.00 377.12
g Rent for Scaffolding by H frame incl. Khapeda No.
1.00 (per pair per day) (ARC 2023-24 Approved Rate) 45.00 38.14
h Making hole and providing and fixing nipple, no.
1.00 coupling and end cap(0.5''dia.) (ARC 2023-24 575.00 487.29
i Electric Demolition Hammer (11-E) per shift shift
1.00 (ARC 2023-24 Approved Rate) 1,100.00 932.20
j Cement grouting pump per shift(With Gasket) shift
5.00 (ARC 2023-24 Approved Rate) 460.00 389.83
8 Providing laying and jointing in true line and
level. U.P.V.C.Pipe(SCH40) for cold water -
including fittings as approved by Engineer In
Charge. Pipe shall be fixed on the wall with
the help of clamp at every two metre C/C or
shall be concealed as directed in cluding
necessary fittings etc. including testing of pipe
and joints and fixing the same with adhesive
solvent, including cost of all materials.
(R&B Ahd city. SOR. -23-24 ,It no.23061,62,64,65
a 25 mm Dia. No
b 40 mm Dia. No
c 50 mm Dia. No
9 Charges for Water connection by making
hole in CI/DI/MS main line (AMC water project - -
SOR 2015-16, It no.12)
a 15 mm Dia. No
b 25 mm Dia. No
c 40 mm Dia. No
d 50 mm Dia. No
10 Charges for repairing of HDPE Pipeline
leakages, including bringing of all units, -
HPDP pipe welding machine, raw materials,
pipe cutting, jointing, grinding etc.also
including transportation all machinery at site. (
ARC 2023-24 Approved Rate)
a 225 mm dia to 315 mm dia outer diameter of Joint
b 355 mm dia to 560 mm dia outer diameter of Joint
11 Providing & suppling HDPE Flange as per
required dia - -
( ARC 2022-23 Approved Rate)
a 225 mm dia No
b 280 mm dia No
c 315 mm dia No
d 355 mm dia No
e 450 mm dia No
f 500 mm dia No
g 560 mm dia No
12 For Masonry & RCC Work
a Carting of Debris for lead from 50 m to 5 Kms. Cmt
- as directed. (R&B Ahd city. SOR. -23-24, st.no.5 408.41 408.41 -
sr.no 3.2.1A-(2), page no-6
b Supply cutting, Bending, Binding and placing MT
- in position steel as per plan and design and 77,504.00 77,504.00 -
as per ISS 2502 including cost of steel and
binding wire for reservoirs/ structures only
including lift up to 6 meter height or depth
below G.L. for all diameters. Deformed(TMT)
bars confirming to relevant IS Fe-500 grade
for all diameters. (GWSSB SOR 22-23, It no.9.4,
c P/F Dead shuttering for slab, beam etc. smt.
- (ARC 2023-24 Approved Rate) 400.00 338.98 -
d Providing & Supplying Bricks no.
- (ARC 2023-24 Approved Rate) 8.00 6.78 -
13 Proving and Fixing F.R.C. Extra Heavy Duty No
- (EHD-35) Manhole Covers &Frames Cover : 2,380.00 2,125.00 -
728mm ø & 100 mm thick circular cover,
35.00 MT load design, 100x2mm MS flat
allround, 16mm ø plain round bar for lifting
the cover & should be fitted with plastic cups.
Frame : 560 mm ø clear opening, outer size-
888x888x175 mm. On the upper periphery of
frame 25 x 3 mm wide MS flat should be well
embed in concrete to protect the edges of
frame. FRC E.H.D.-35 manhole cover &
frame described as above. Rate also
including Fixing M.H., Chamber or Catchpite
Seat and Cover in line and level to match
exisisting road level in C.C.1:2:4 and finishing
smooth, watering and protecting for 7 days
etc. complete as directed. Drainage SOR 15-16,
Item no (23a + 24)
14 Providing, Fabrication and Fixing works of smt.
- bird screen with angle 20x20x4 mm, flat 940.00 839.29 -
20x3 mm and grill 30x30x3 mm including
painting with enamal paint, welding and
transportation etc. (ARC 2023-24 Approved Rate)
15 Labour charges for collecting sluice valves
with tail pieces from Municipal stores loading, - -
transporting to the site, installing and jointing
C.I. sluice valves inclusive of all jointing
materail like Bolts, nuts, washer, Rubber
packing etc. comp.
(Water Project SOR 15-16, Item No.4)
a 100 mm dia No
b 150 mm dia No
c 200 mm dia No
d 250 mm dia No
e 300 mm dia No
f 350 mm dia No
g 400 mm dia No
h 450 mm dia No
16 Cutting of existing pipelines of following
diameters including carting of nece. Specials - -
from AMC store to site and from site to AMC
store (recovered materials) nace. Labours for
excavation, jodan & backfilling filter,
supervisor, etc. complete. Rate also includes
electric cutter, dewatering pump fuel adn
transportation of machineries, chain pulley
block if requires working at an instructed
specific time of day or night etc. complete.
(Water Project SOR 15-16, Item No.6)
a 100 mm dia No.
b 150 mm dia No.
c 200 mm dia No.
d 250 mm dia No.
e 300 mm dia No.
f 350 mm dia No.
g 400 mm dia No.
h 450 mm dia No.
17 Labour charges for collecting specials from kg.
800.00 Municipal Store loading, transporting to the 24.00 21.43
site ,laying & Fixing C. I. specials inclusive of
all jointing materials like lead, spun etc. and
labour, excavation re-filling and nece.
dewatering as per instruction engg. In charge.
(Water Project SOR 15-16, Item No.6)
18 Labour Charges for removing and recover of
ex. C.I. Sluice valve with tail pieces and - -
carting it up to Muni.Store or site as per
instruction of Engg. In charge item include.
necessary Excavation, removing or making
joints, refilling etc.comp. as directed by Engg
in charge. (Water Project SOR 15-16, Item No.6)
a 100 mm dia No.
b 150 mm dia No.
c 200 mm dia No.
d 250 mm dia No.
e 300 mm dia No.
19 Gas Cutting and Welding for Rmt
135.00 pipes/platesConsolidating gas cutting 1,200.00 1,016.95
pipes/plates etc. and butt welding in all
position with required number runs for MS
pipes internal and/or extremely incl. gauging
wherever necessary fixing apprurtences and
other accessories in connection with pipe
laying work as per specification. (ARC 2023-24
20 Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam - -
specification including premixing the Material
with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site,
laying in uniform layers in subbase / base
course on well prepared surface and
compacting with vibratory roller to achieve the
desired density. (Road SOR 21-22, Item No.8,
a (A) Supply of WMM Cmt
b (B) Laying of WMM Cmt
21 Design, Supply, Installation, Testing, No.
- Commissioning of Bourdon Type Pressure 1,412.00 1,412.00 -
Gauge, ±1% accuracy, Direct bottom 1/2"
NPT (M) process connection, IP 67, Glycerine
filled, SS304 Case with Bayonet Type Bezel,
SS316 L Bourdon Tube, SS 316 Movement
material, Aluminium dial with black graduation
on white background, Micro Zero adjustable
pointer, neoprene gasket, Blow out disc,
shatter proof glass, SS tag plate etc as per IS
3624..Range 0-6kg/sq.cm - -150 mm dia
(GWSSB Mech. SOR 22-23,Schedule F, It NO 10.1(B-
iv), Page no.102)
22 To provide Tractor with Hydraulic Trolley, Shift
20.00 driver with fuel, to carryout different works 1,650.00 1,473.21
during day/night for 12 Hrs. Shift. Work shall
be carried out as per the instructions of
Engineer In-Charge. No extra charged shall
be paid for night shift.
(Drainage SOR 15-16)
23 Making connection of 450 mm dia Job
- DI/MS/HDPE Pipe with Existing Jaspur trunk 50,000.00 42,372.88 -
main including cutting the pipe to required
annular shape of 450 mm dia. By Electro
Welding and jointing 450 mm dia DI/MS pipe,
including dewatering, excavation, refilling etc.
with all required materials such as welding
rods and other necessary required materials
including giving a satisfactory leakage proof
test. (ARC 2023-24 Approved Rate)
Contractor’s Quoted Rate: -
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Addl. City Engineer
Date: (South Zone)
Ahmedabad Municipal Corporation
PRICE BID / TENDER FORM
ESTIMATED COST PUT
SR.NO. NAME OF WORK
1 œrûtK Ítullt Rmlvwh Jtuzobtk ngt< vtKelt luxJfole jtRllbtk
sYhegt< bwsc yub.yum mufNl fhJtlt ftb ctc<.
I/We am/are willing to carry out work at __________% above / below (should be written in
figures and words) the estimated cost mentioned above. The amount of my/our tender
works out as under
Estimated cost put to tender : Rs Estimated cost put to Rs
Total : Rs___________ In words : Rupees_____________________
Signature of contractor with seal Additional City Engineer ( S.Z )
Date Ahmedabad Municipal Corporation
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender no 21 MS section.pdf
Tender no 21 MS section ABS.pdf
Download all tender documents and submit your bid