| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance HOUSE NO 33 HARI NAGAR JWALAPUR HARIDWAR | HARIDWAR | HARIDWAR | UTTARAKHAND | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 CrAdmitted-Finance KHASRA NO 203 KHARAKPUR DEVIPURA KASHIPUR U S N | GORAKHPUR | UTTAR PRADESH | 273001 | ₹2.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.1 CrAdmitted-Finance NANDA VIHAR DHANAURI PATTI RAMNAGAR ROAD KASHIPUR DISTT U S NAGAR UTTARAKHAND | ALMORA | UTTARAKHAND | 244715 | ₹2.1 Cr | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical KATORATAL STREET KASHIPUR U S NAGAR | - | - | Not Admitted-Fee/PreQual/Technical Others-hard copy documents not submitted in office |
| 5 | Not Admitted-Fee/PreQual/Technical 0 SATTI MASZID SATTI MASZID NURUDDINPURA GHAZIPUR UTTAR PRADESH 233001 | GHAZIPUR | UTTAR PRADESH | 233001 | - | - | Not Admitted-Fee/PreQual/Technical Others-hard copy documents not submitted in office |
| Sl No | Description | Qty | Unit | KUMAUN ELECTRICALS L2 | SHIKHAR ENTERPRISES L3 | M/s Hariom Enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00Supply Item | ||||||
| 1.01 | Bracing Clamp SP-72
(As per Specification of RESPO & UPCL) | 20 | Nos | 7,720 ₹9,109.60 | 7,760 ₹9,156.80 | 7,746 ₹9,140.28 |
| 1.02 | Holding Clamp FPR GI Pipe 8/10''& MS Ch.
(As per Specification of RESPO & UPCL) | 4 | Nos | 1,820 ₹2,147.60 | 1,804 ₹2,128.72 | 1,780 ₹2,100.40 |
| 1.03 | E- CLAMP
(As per Specification of RESPO & UPCL) | 60 | Nos | 23,700 ₹27,966 | 23,340 ₹27,541.20 | 23,220 ₹27,399.60 |
| 1.04 | PP & CLAMP WITH N&B ST POLE SP-55
(As per Specification of RESPO & UPCL) | 60 | Nos | 16,380 ₹19,328.40 | 16,620 ₹19,611.60 | 16,440 ₹19,399.20 |
| 1.05 | PP & CLAMP WITH N&B ST POLE SP-72
(As per Specification of RESPO & UPCL) | 20 | Nos | 12,260 ₹14,466.80 | 12,360 ₹14,584.80 | 5,960 ₹7,032.80 |
| 1.06 | BRACING CLAMP BOTTOM WITH N&B SP-55
(As per Specification of RESPO & UPCL) | 50 | Nos | 13,900 ₹16,402 | 14,100 ₹16,638 | 13,975 ₹16,490.50 |
| 1.07 | DANGER BOARD
(As per Specification of RESPO & UPCL) | 70 | Nos | 34,860 ₹41,134.80 | 35,210 ₹41,547.80 | 34,930 ₹41,217.40 |
| 1.08 | GI Pipe Dia 150 mm
(As per Specification of RESPO & UPCL) | 32 | Mtr | 52,800 ₹62,304 | 52,576 ₹62,039.68 | 50,976 ₹60,151.68 |
| 1.09 | STAY CLAMP FOR SP-55 WITH NUT & BOLT
(As per Specification of RESPO & UPCL) | 40 | Nos | 10,920 ₹12,885.60 | 11,080 ₹13,074.40 | 10,960 ₹12,932.80 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹3.6 L
Closing Date
7 Jan 2026, 11:00 amClosed
Superintending Engineer
33 11 KV Sub Station Campus ND Nagar Industrial Estate Bazpur Road KASHIPUR US NAGAR 244713
Replacement of Bare Conductor to AAAC Conductor on 33 KV Main Line of 33/11 KV S/s 20 No Bazpur Road, Kashipur under EDD Kashipur
2025_UPCL9_89767_1
61/EDC(K)/2025-26
Open Tender
Electrical Works
365 days
Kashipur
As Per NIT and Tender Documents
3 documents required · 3 mandatory
₹11,800
EE EDD Kashipur
₹3.6 L
23 Jan 2026
11 Dec 2025
7 Jan 2026
11 Dec 2025
7 Jan 2026
11 Dec 2025
Supply Item
Bracing Clamp SP-72 (As per Specification of RESPO & UPCL)
Holding Clamp FPR GI Pipe 8/10''& MS Ch. (As per Specification of RESPO & UPCL)
E- CLAMP (As per Specification of RESPO & UPCL)
PP & CLAMP WITH N&B ST POLE SP-55 (As per Specification of RESPO & UPCL)
PP & CLAMP WITH N&B ST POLE SP-72 (As per Specification of RESPO & UPCL)
BRACING CLAMP BOTTOM WITH N&B SP-55 (As per Specification of RESPO & UPCL)
DANGER BOARD (As per Specification of RESPO & UPCL)
GI Pipe Dia 150 mm (As per Specification of RESPO & UPCL)
STAY CLAMP FOR SP-55 WITH NUT & BOLT (As per Specification of RESPO & UPCL)
Earth Wire Clamp (As per Specification of RESPO & UPCL)
33 KV Mid Span Jointing Kit (As per GTP & Specification of UPCL)
33 KV Tension clamp with Bail & IPC (As per GTP & Specification of UPCL)
33 KV Cable ties for Pin insulator (As per GTP & Specification of UPCL)
33 KV IPC for covered to covered conduct (As per GTP & Specification of UPCL)
33 KV IPC for covered to Bare conductor (As per GTP & Specification of UPCL)
IPC with aluminium bail for earthing (As per Specification of RESPO & UPCL)
HDPE PIPE PE 100 PN6 DIA 160 MM (As per Specification of RESPO & UPCL)
33KV AAAC COVERED COND. AL-59,241 SQ.MM. (As per GTP & Specification of UPCL)
33 KV HS cable END T/K 3x400 mm² O/D (As per GTP & Specification of UPCL)
Line Erection Work
ERECTION OF CC ROUTE MARKER FOR HT CABLE
Chemical Earthing:Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor as per drawing No. A) as drawing B, connecting the same with G.I. Strip (to be supplied by contractor ) of size 35x6 mm as per drawing C for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm.
Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrode with the helpof G.I. wire as per construction manual.
Fabrication of M.S. Channel Angle iron after cutting in required sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESSPO sehedule and local approved drawing.
FIXING OF GI PIPE
Excavation of earth for Stay pit of size 0.6x0.6x1.2mtr in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
Fixing , tightening and nozzaling of 33 KV Stay with pole and stay rod on required tension as per drawing / RESSPO manual.
Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual.
Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
Erection of Single SP-55 support pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual.
Erection of Double SP-72 support pole in proper level and alignment alongwith fixing of all accessories, like top channel & clamps as per RESSPO construction Manual.
Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement : 4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand and stone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual.
Muffing of poles size 0.45 cm x 0.60 cm radious with cc 1:3:6 (1 cement : 3 coarse sand : 6 graded stone 10mm nominal size) block size 45cm height from ground level including cost of cement, stone and sand etc.
DISMANTLING OF SP-55 SINGLE POLE including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light connections etc.
ERECTION OF BRACKET IN 33 KV LINE
T-OFF CONNECTION COMPLETE 33 KV LINE
CONST.,INST.OF DANGER BOARD/NUMBER PLATE
MAKING OF SECTION POLE
CARTAGE SP-55 POLE, 0-20 KM from store centre to construction site with loading, unloading at both points. (loading, unloading pluse carriage per pole) and proper stacking.
CARTAGE SP-72 POLE, 0-20 KM from store centre to construction site with loading, unloading at both points. (loading, unloading pluse carriage per pole) and proper stacking.
CARTAGE OF PETTY MATERIAL,0-20 KM by vehicle fro Store Center to nearest construction site Store including loading and unloading at both ends.
HEADLOAD CARTAGE SP-55 POLE(0-1 KM) from road to site (Rates are per pole / KM
HEADLOAD CARTAGE SP-72 POLE(0-1KM) from road to site (Rates are per pole / KM
HEADLOAD CARTAGE OF MATERIAL(0-1 KM) from road to site (Rates are per pole / KM
ROAD CUTTING AND REPAIRING
HIPOT CABLE TESTING BEFORE ENERGIZING
FIXING OF 33 KV TENSION CLAMP WITH IPC
FIXING OF 33 KV IPC FOR CC TO CC COND.
FIXING OF 33 KV IPC FOR CC TO BARE COND.
FIXING OF 33 KV MID SPAN JOINTING KIT
FIXING OF IPC WITH AL. BAIL FOR EARTHING
REALIGNMENT OF TILTED POLE
REPLACEMENT OF DAMAGE X-ARM
STRAIGHTNING OF TILTED X-ARM
FIXING OF 33KV CABLE TIES
RENOZZELING OF EXISTING STAY SET
FABRIC.,MOUNT.,FIXING BRACING SET ON D/P
ERECTION & LAYING OF 33KV 3X400 IN HDPE
INSTALLATION OF J/KIT 33KV 3X400 O/D
LAYING SPREADING,STRINGING AAAC CONDUCT.
FIXING OF PP CLAMP
REMOVING OLD CONDUCTOR BY OPENING JUMPER including disc fitting, Insulator, clamps, Nut & Bolts and consumer connections and Street light connections etc. including rolling of conductor and cartage back from site to JE store
RESAGGING OF LOOSE ESISTING HT LINE
WELDING OF RUSTED POLE
ERECTION OF EARTH WIRE CLAMP
ERECTION OF STAY CLAMP
ERRECTION OF HDPE PIPE 160/90/65
ERECTION OF ANTICLIMB DEVICE BARBED(N&B)
BACK CARRIAGE OF SCRAP MATERIAL
Route cleareance by cutting of tree branches / proning, loping and chopping of trees for L.T., 11 & 33 KV line.
Painting of poles with angle and channel and all steel part by one coat of Rod Oxide Primer and two coats of aluminium Paint and two strip of fluorescent altemate Red and White paint 30 Cm wide upto 1.5 Mtrs. From ground level.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_106421.xls
BOQ • 0.28 MB
ET61PQR.xls
Additional Documents • 0.04 MB
ET61TD.pdf
Tender Documents • 0.79 MB
ET61NIT.pdf
Other Document • 0.15 MB
Download all tender documents and submit your bid