Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.4 LAccepted-AOC JHABRERA ROAD NEAR POWER STATION MANGLOR DISTT HARIDWAR UTTRAKHAND | MANGLOR | HARIDWAR | UTTARAKHAND | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹35.4 L+₹3.3 L (10.1%)Rejected-AOC | L2 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 3 | L3₹35.7 L+₹3.5 L (10.9%)Rejected-AOC VILL RAVI GRAM PO JOSHIMATH DISTT CHAMOLI UK | JOSHIMATH | CHAMOLI | UK | L3 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 4 | L4₹35.7 L+₹3.5 L (11.0%)Rejected-AOC VILLAGE POST REGARI JOSHIMATH DISTT CHAMOLI 246483 UK | JOSHIMATH | CHAMOLI | UTTARAKHAND | 246483 | L4 | Rejected-AOC OTHER THAN LOWEST BIDDER | |
| 5 | L5₹36.7 L+₹4.5 L (14.0%)Rejected-AOC | L5 | Rejected-AOC OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | Ganesh Dimri Construction L3 | M/S BHAWANI CONSTRUCTION L2 | nautiyal construction L7 | ms triveni nirman L8 | M/S RAMESH LAL L6 | MS NANDAN SINGH FARSWAN L4 | M/S Swarn Constructions L1 | M/s Sagar Associates L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' PART-I : BOQ OF WORKS FOR B/R WORKS. | |||||||||||
| 1.01 | Demolition of un-reinforced cement concrete in ground floors and pavings not exceeding 15 cm thickness (below or above ground level), ncluding cleaning, removal and disposal of rubbish/ waste materials from premises, complete all as specified and as directed. | 16.6 | Per Cum | 950 ₹15,770 | 900 ₹14,940 | 1,000 ₹16,600 | 950 ₹15,770 | 950 ₹15,770 | 1,000 ₹16,600 | 800 ₹13,280 Lowest | 910 ₹15,106 |
| 1.02 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises, complete all as specified and as directed. | 501 | Per Sqm | 75 ₹37,575 | 40 ₹20,040 | 80 ₹40,080 | 80 ₹40,080 | 80 ₹40,080 | 80 ₹40,080 | 30 ₹15,030 Lowest | 50 ₹25,050 |
| 1.03 | Dismantaling of PCC block walling/ brickwork or stone/ boulder masonry, including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles built in cement mortar or cement lime mortar of any description, complete all as specified and as directed. | 8 | Per Cum | 910 ₹7,280 | 800 ₹6,400 | 1,000 ₹8,000 | 1,000 ₹8,000 | 1,000 ₹8,000 | 900 ₹7,200 | 750 ₹6,000 Lowest | 810 ₹6,480 |
| 1.04 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc, complete all as specified and as directed. | 150 | Per Sqm | 55 ₹8,250 | 30 ₹4,500 | 65 ₹9,750 | 65 ₹9,750 | 65 ₹9,750 | 50 ₹7,500 | 25 ₹3,750 Lowest | 40 ₹6,000 |
| 1.05 | Taking down of chowkhats or frame with shutters (without taking off shutters from the frames) area exceeding 1.50 Sqm but not exceeding 4.0 Sqm each, complete all as specified and as directed. | 19 | Each | 270 ₹5,130 | 250 ₹4,750 | 290 ₹5,510 | 290 ₹5,510 | 290 ₹5,510 | 260 ₹4,940 | 200 ₹3,800 Lowest | 260 ₹4,940 |
| 1.06 | Taking down of chowkhats or frame with shutters (without taking off shutters from the frames) area not exceeding 1.50 Sqm each, complete all as specified and as directed. | 64 | Each | 190 ₹12,160 | 150 ₹9,600 | 250 ₹16,000 | 250 ₹16,000 | 250 ₹16,000 | 180 ₹11,520 | 130 ₹8,320 Lowest | 169 ₹10,816 |
| 1.07 | Taking up or down steel tubing of 15mm bore pipe and connections, including cleaning for re-fixing or removal to store, complete all as specified and as directed. | 76 | Per Running Metre | 70 ₹5,320 | 50 ₹3,800 | 80 ₹6,080 | 80 ₹6,080 | 80 ₹6,080 | 50 ₹3,800 | 40 ₹3,040 Lowest | 60 ₹4,560 |
| 1.08 | Taking up or down steel tubing of 20mm bore pipe and connections, including cleaning for re-fixing or removal to store, complete all as specified and as directed. | 40 | Per Running Metre | 55 ₹2,200 | 50 ₹2,000 | 70 ₹2,800 | 70 ₹2,800 | 70 ₹2,800 | 50 ₹2,000 | 45 ₹1,800 Lowest | 60 ₹2,400 |
| 1.09 | Plain cement concrete M-15(1:2:4), type B-0 (using 12.50mm graded crushed stone aggregate), nominal mix, 25mm thick, as in floors, finished even and rough to receive floor finishes, complete all as specified and as directed. | 105 | Per Sqm | 290 ₹30,450 | 300 ₹31,500 | 350 ₹36,750 | 350 ₹36,750 | 350 ₹36,750 | 300 ₹31,500 | 280 ₹29,400 Lowest | 400 ₹42,000 |
Tender Value
Refer Docs
EMD Value
₹6,600
Closing Date
19 Jun 2025, 6:00 pmClosed
GARRISON ENGINEER OF GE 871 EWS
GE 871 EWS C/O 56 APO PIN- 913871
SPECIAL REPAIR TO FOUR BATHROOMS IN BLDG NO P-73 INCLUDING SPECIAL REPAIR OF BATHROOM AND TILING OF FLOOR FOR BLDG NO P-109, P-110 AND P-182 AT VARIOUS UNITS AT JOSHIMATH UNDER GE 871 EWS
2025_MES_711835_1
8899/E8
Open Tender
Civil Works
Item Rate
180 days
JOSHIMATH
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE 871 EWS
₹6,600
Yes
31 Oct 2025
31 May 2025
21 Jun 2025
31 May 2025
19 Jun 2025
14 Jun 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .