Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC DRONA SAGAR BAZPUR ROAD KASHIPUR U S NAGAR UTTARAKHAND INDIA | ₹4.3 L | L1 | Accepted-AOC First Lowest Bid Rs 428573.00 |
| 2 | L2₹4.4 LRejected-Finance COURT ROAD ANAND HOME C 302 KASHIPUR US NAGAR UTTARAKHAND | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | ₹4.4 L | L2 | Rejected-Finance Due to Highest Bid Rank |
| 3 | L3₹4.6 LRejected-Finance WARD NO 01 PUNJABI COLONY GADARPUR U S NAGAR | LUDHIANA | PUNJAB | 141001 | ₹4.6 L | L3 | Rejected-Finance Due to Highest Bid Rank |
| Sl No | Description | Qty | Unit | ASHISH ENGINEERING L2 | M/S BRAHMAPUTRA INFRASTRUCTURES L1 | HIMALAYA BUILDCON L3 |
|---|---|---|---|---|---|---|
| 1.00A- Supply of Non- centralized Items | ||||||
| 1.01 | MS Clamp with N&B for Distribution Box | 12 | Nos | 270 ₹3,240 | 259 ₹3,108 Lowest | 275 ₹3,300 |
| 1.02 | MS Clamp for Dead End Clamp with N&B | 12 | Nos | 270 ₹3,240 Lowest | 279 ₹3,348 | 275 ₹3,300 |
| 1.03 | Dead End clamp with I Hook | 12 | Nos | 300 ₹3,600 | 295 ₹3,540 Lowest | 300 ₹3,600 |
| 1.04 | Stay Insulator | 16 | Nos | 99 ₹1,584 | 90 ₹1,440 Lowest | 100 ₹1,600 |
| 1.05 | Shear Head type PRC 120 to 25 sqmm | 27 | Nos | 210 ₹5,670 | 209 ₹5,643 Lowest | 210 ₹5,670 |
| 1.06 | LT Bare N. Connector PG clamp 95-25 Sqmm | 24 | Nos | 250 ₹6,000 | 249 ₹5,976 Lowest | 260 ₹6,240 |
| 1.07 | IPC for 120 to 120 Sqmm | 36 | Nos | 330 ₹11,880 | 320 ₹11,520 Lowest | 350 ₹12,600 |
| 1.08 | LT Distribution Box 3 Phase 4 Wire | 6 | Nos | 3,999 ₹23,994 | 3,900 ₹23,400 Lowest | 4,000 ₹24,000 |
| 1.09 | MS Clamp with N&B for Suspension clamp | 18 | Nos | 250 ₹4,500 | 249 ₹4,482 Lowest | 250 ₹4,500 |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
1 Jun 2026, 11:00 amClosed
Executive Engineer
Office of the EE EDD Jaspur
Increasing Capacity work of 25 KVA to 63 KVA and 63 KVA to 100 KVA Power T/F (No. 09) under 33/11 KV S/S Garhinegi, EDSD(Second), Jaspur under the Head of Capital (SI).
2026_UPCL9_95582_1
ETender No 08/EDD(J)/2026-27
Open Tender
Electrical Works
Item Rate
45 days
EDD Jaspur
Please refer Tender documents.
4 documents required · 4 mandatory
₹295
EE EDD Jaspur
₹18,000
3 Aug 2026
19 May 2026
2 Jun 2026
19 May 2026
1 Jun 2026
19 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1A- Supply of Non- centralized Items | |||||
| 1.01 | MS Clamp with N&B for Distribution Box | 12 | Nos | 100 | ₹1,200 |
| 1.02 | MS Clamp for Dead End Clamp with N&B | 12 | Nos | 100 | ₹1,200 |
| 1.03 | Dead End clamp with I Hook | 12 | Nos | 100 | ₹1,200 |
| 1.04 | Stay Insulator | 16 | Nos | 100 | ₹1,600 |
| 1.05 | Shear Head type PRC 120 to 25 sqmm | 27 | Nos | 100 | ₹2,700 |
| 1.06 | LT Bare N. Connector PG clamp 95-25 Sqmm | 24 | Nos | 100 | ₹2,400 |
| 1.07 | IPC for 120 to 120 Sqmm | 36 | Nos | 100 | ₹3,600 |
| 1.08 | LT Distribution Box 3 Phase 4 Wire | 6 | Nos | 100 | ₹600 |
| 1.09 | MS Clamp with N&B for Suspension clamp | 18 | Nos | 100 | ₹1,800 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
PQR08.pdf
Tender Documents • 1.06 MB
Checklist08.xls
Additional Documents • 0.04 MB
BOQ_113014.xls
BOQ • 0.33 MB
ET08DateExtendtion.pdf
PDF • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].