| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC 159B M G ROAD HARIDEVPUR KOLKATA WEST BENGAL 700082 UDYAM WB 10 0018308 | KOLKATA | WEST BENGAL | 700082 | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.0 L+₹10,044.07 (1.01%)Rejected-Finance GHOSHPARA WARD NO 03 DAS PARA P O P S KALYANI DIST NADIA PIN 741235 | KALYANI | NADIA | WEST BENGAL | 741235 | L2 | Rejected-Finance L2 | |
| 3 | L3₹10.1 L+₹19,988.70 (2.01%)Rejected-Finance 96 A KALYANI SIMANTA P O P S KALYANI NADIA PIN 741235 | KALYANI | NADIA | WEST BENGAL | 741235 | L3 | Rejected-Finance L3 |
Tender Value
₹9.9 L
EMD Value
₹19,889
Closing Date
12 Jan 2026, 3:00 pmClosed
Chairman Kalyani Municipality
Office of the Chairman, Kalyani Municipality
REPAIRING OF SURFACE BRICK DRAIN FROM DURGA MANDIR TO GHOSHPARA BAZAR , IN PART NO-188 OF WARD NO- 10, UNDER KALYANI MUNICIPALITY
2025_MAD_976001_11
KLYM/APAS/T-10/2025-2026
Open Tender
CIVIL WORKS
Percentage
45 days
Ward No-10
Please Refer Tender Document
8 documents required · 8 mandatory
₹0
₹19,889
8 May 2026
19 Dec 2025
15 Jan 2026
19 Dec 2025
12 Jan 2026
19 Dec 2025
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1.5 m Ref. Page - 1, Item 2(a) PWD SOR VOL-I w.e.f. 1.11.2017
Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. a) In ground floor including roof. Ref. Page - 10, Item 1(a) PWD SOR VOL-I w.e.f. 1.11.2017
(c) Extra rate for careful dismantling and recovering at least 150 no of useable bricks per cum. Ref. Page - 10, Item 1(c) PWD SOR VOL-I w.e.f. 1.11.2017
Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) upto 150 mm. thick Ref. Page -10, Item -2 a), PWD SOR Vol-I w. e. f. 1.11.2017
Supplying and laying Polythene Sheet (150gm / Sq.M) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. Ref. Page -47, Item -3, PWD SOR Vol-I w. e. f. 1.12.2017
Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion Ref. Page -23, Item -01, PWD SOR Vol-I w. e. f. 1.12.2017
Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth Ref.Page -15, Item -07, PWD SOR Vol-I w. e. f. 1.12.2017
Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement (iii) 35 mm. thick Ref. Page 48, Item -6,iii), PWD SOR Vol-I w. e. f. 1.12.2017
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding / staging where necessary (Ground floor). (i) With 1:6 cement mortar (c) 15 mm thick plaster Ref. Page -189, Item -1, PWD SOR Vol-I w. e. f. 1.12.2017
Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc. NOTE : Cement 0.152 cu.m. per 100 sq.m. Ref. Page -192, Item -15, PWD SOR Vol-I w. e. f. 1.12.2017
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (a) Pakur Variety Ref. Page -26, Item -10), PWD SOR Vol-I w. e. f. 01.11.2017
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. Ref. Page 42, Item - 36) PWD SOR Vol-I w. e. f. 01.11.2017
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel II.JSW/JSPL/SHYAM/SRMB/BMASL/ELECROSTEEL/SSL Bsaed on Analysis Rate Ref. Page -43-44, Item -40 II), PWD SOR Vol-I w. e. f. 1.11.2017 2nd Addenda & Corrigenda w. e. f. 18.04.2018)
Deduction cost of brick from dismamtling previous wall a)1st Class Bricks (kiln burnt) Total no of bricks getting from dismantal Ref. Page - 299, Item 1(a) PWD SOR VOL-I w.e.f. 1.11.2017
Add 18% GST
Add 1% Cess
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.87 MB
Tendernotice_2.pdf
PDF • 6.58 MB
BOQ_2377254.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .