| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-AOC | ₹7.2 L | L1 | Accepted-AOC Lowest |
| 2 | Rejected-Technical | - | - | Rejected-Technical L10 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L11 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L8 |
Tender Value
₹10 L
EMD Value
₹15,000
Closing Date
8 Jan 2022, 6:00 pmClosed
Assistant Engineer
LID and E W Feroke Municipality Kozhikode
Road concrete, Irish drain
2021_LSGD_458042_7
AE/LSGD/FM/5/2021-22
Open Tender
Civil Works - Roads
Item Rate
60 days
Feroke Municipality
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Yes
₹15,000
Yes
18 Oct 2022
1 Jan 2022
10 Jan 2022
1 Jan 2022
8 Jan 2022
1 Jan 2022
Amount
3.2 : Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
3.14 : Construction of Subgrade and Earthen Shoulders<br> Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
4.1.A.1 : Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material
75.8.1 : Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4 course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as required including compaction, finishing and tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixed in concrete mixer etc complete as per specification (i) Nominal mix (1:2:4) a)Materials
FEROKE CO-OPERATIVE LABOUR CONTRACT SOCIETY LTD.NO.D.2855
P. SADDAD
HASSAN C
SHAMSEER N
NITHASH KP
ABDURAHIMAN RM
FAVAS E
ABDUL NASER K
OMRAN PROJECTS PRIVATE LIMITED
Bidder Name
C SAJEESH
P. SADDAD
FAVAS E
HASSAN C
SHAMSEER N
ABDURAHIMAN RM
ABDUL NASER K
OMRAN PROJECTS PRIVATE LIMITED
NITHASH KP
FEROKE CO-OPERATIVE LABOUR CONTRACT SOCIETY LTD.NO.D.2855
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_664786.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .