| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | l2₹4.5 L+₹10,501 (2.38%)Rejected-AOC | l2 | Rejected-AOC L2 | |
| 3 | L3₹48,104−₹3.9 L (89.1%)Rejected-AOC | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Sreekumar C K L2 | M KAJHA HUSSAIN L1 | GOPALAN.M L3 |
|---|---|---|---|---|---|---|
| 1.00RBMC Improvement work in 400m between Ch: 7/200 to 7/600 km | ||||||
| 1.00 | OD8060/2025-2026:Clearing the light jungle and grass from the canal bed and bund for water distribution. Including removal of rubbish up to a distance of 50m outside the periphery of the are cleared. | 227.5 | sqm | 9 ₹2,047.5 Lowest | 9.1 ₹2,070.25 | 9.94 ₹2,261.35 |
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix) | 7.88 | cum | 1,109 ₹8,733.38 | 1,083.44 ₹8,532.09 Lowest | 1,182.92 ₹9,315.5 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 31.2 | cum | 183 ₹5,709.6 | 179.57 ₹5,602.58 Lowest | 196.06 ₹6,117.07 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 22.5 | cum | 5,664 ₹1,27,440 | 5,529.22 ₹1,24,407.45 Lowest | 6,036.93 ₹1,35,830.93 |
| 1.00 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 158.6 | sqm | 599 ₹95,001.4 | 585.2 ₹92,812.72 Lowest | 638.94 ₹1,01,335.88 |
| 1.01 | 60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 6.5 | metre | 80 ₹520 | 78.82 ₹512.33 Lowest | 86.05 ₹559.33 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 27.3 | cum | 6,118 ₹1,67,021.4 | 5,972.69 ₹1,63,054.44 Lowest | 6,521.12 ₹1,78,026.58 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 3.33 | cum | 6,594 ₹21,964.61 | 6,437.47 ₹21,443.21 Lowest | 7,028.57 ₹23,412.17 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 78 | sqm | 245 ₹19,110 | 239.62 ₹18,690.36 Lowest | 261.62 ₹20,406.36 |
Tender Value
Refer Docs
EMD Value
₹15,803
Closing Date
9 Jul 2025, 5:00 pmClosed
ASST EXECUTIVE ENGINEER
ASST EXECUTIVE ENGINEER CANAL SUB DIVISION ALATHUR
Action Plan Dam Section 2025 26 Improvement of RBMC between Ch 7 100 km and 7 200 km
2025_Irrig_773833_1
15 IRR/PI/TR/2669/2025_5_5_4/1
Open Tender
Civil Works - Canal
Item Rate
240 days
ALATHUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,395
Yes
₹15,803
Yes
25 Sept 2025
2 Jul 2025
11 Jul 2025
2 Jul 2025
9 Jul 2025
2 Jul 2025
2 Jul 2025 - 5 Jul 2025
Amount
RBMC Improvement work in 400m between Ch: 7/200 to 7/600 km
OD8060/2025-2026:Clearing the light jungle and grass from the canal bed and bund for water distribution. Including removal of rubbish up to a distance of 50m outside the periphery of the are cleared.
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
60.6:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Sreekumar C K (BID ID -2240663)
GOPALAN.M (BID ID -2244490)
Bidder Name
Sreekumar C K
M KAJHA HUSSAIN
GOPALAN.M
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1263829.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .