Tender Value
₹1.8 Cr
EMD Value
₹50,000
Closing Date
7 Oct 2026, 3:00 pm
Sajimon K J
Executive Engineer, Transmission Division, Nedumkandam, Chembalam PO, 685553
Upgradation of 66kV Substation, Kattappana to 110kV Standard The construction of 110kV Yard and erection of equipments without Power Transformer
2026_KSEB_866904_1
05/TDN/E-TENDER/2026-27 dated. 21.08.2026
Open Tender
Electrical Works
Item Rate
180 days
Kattappana
Refer Tender Documents
7 documents required · 7 mandatory
₹5,900
₹50,000
Yes
7 Oct 2026
5 Sept 2026
12 Oct 2026
5 Sept 2026
7 Oct 2026
5 Sept 2026
5 Sept 2026 - 7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge. | 670 | m3 | 257.63 | ₹1,72,612.1 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 3.0m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m-All kinds of soil (including CI) | 24 | m3 | 388.65 | ₹9,327.6 |
| 3 | Earth work excavation by mechanical means hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift up to 1.5 M as directed by Engineer In Charge Ordinary rock (including CI) | 205.91 | /m3 | 517.87 | ₹1,06,634.61 |
| 4 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 1.5 M to 3M as directed by Engineer In Charge Ordinary rock (including CI) | 15 | m3 | 752.86 | ₹11,292.9 |
| 5 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift up to 1.5 M as directed by Engineer In Charge
Hard rock (blasting prohibited) (INCLUDING C.I.) | 154.1 | /m3 | 1,485.1 | ₹2,28,853.91 |
| 6 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 1.5 M to 3M as directed by Engineer In Charge Hard rock (blasting prohibited) (INCLUDING C.I.) | 10 | m3 | 1,720.09 | ₹17,200.9 |
| 7 | Earth work excavation in all kinds of soil by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 3M to 4.5 M (INCLUDING C.I.) | 1.75 | /m3 | 519.67 | ₹909.42 |
| 8 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 3 M to 4.5M as directed by Engineer In Charge Ordinary rock | 1.75 | /m3 | 987.85 | ₹1,728.74 |
| 9 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50 M and lift 3 M to 4.5M as directed by Engineer In ChargeHard rock (blasting prohibited) | 2.5 | /m3 | 1,955.08 | ₹4,887.7 |
| 10 | Providing and laying in position Cement Concrete 1:4:8 using Cement - 170Kg/m3, 40mm graded stone ( 40 mm-0.65m3 and 20 mm-0.24m3) and M sand(coarse) for levelling course including cost of all materials, ramming, compacting, curing etc. complete head load of all materials etc. complete | 101 | m3 | 7,932.89 | ₹8,01,221.89 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.37 MB
Tendernotice_2.pdf
PDF • 0.66 MB
Nominationform.pdf
Tender Documents • 0.01 MB
etendertermsandconditions.pdf
Tender Documents • 0.21 MB
VOLUMEIPQBid.pdf
Tender Documents • 1.75 MB
VOLUMEIItechspec.pdf
Tender Documents • 0.46 MB
BOQ_1468986.xls
BOQ • 0.40 MB
Corregendumextention.pdf
PDF • 0.33 MB
Corregendumextention.pdf
PDF • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .