| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.2 LAccepted-Finance | ₹38.2 L | L1 | Accepted-Finance L1 |
| 2 | L2₹41.4 LAccepted-Finance THIRUVILAKKIL SANATHANAPURAM P O ALAPPUZHA AMBALAPPUZHA TALUK ALAPPUZHA DISTRICT | ₹41.4 L | L2 | Accepted-Finance L2 |
| 3 | L3₹41.7 LAccepted-Finance | ₹41.7 L | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | BAIJU V L2 | SACHU SONY L3 | JOE THOMAS L1 |
|---|---|---|---|---|---|---|
| 1.00Improvement Works-Masonry Retaining wall | ||||||
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 35.15 | cum | 617.38 ₹21,700.91 | 620 ₹21,793 | 570 ₹20,035.50 |
| 1.00 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 26.78 | cum | 1,398.44 ₹37,451.62 | 1,407 ₹37,680.87 | 1,291 ₹34,574.27 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 226.43 | cum | 209.97 ₹47,543.72 | 210 ₹47,550.51 | 194 ₹43,927.61 |
| 1.00 | OD32753/2025-2026:Dry stone packing under foundation with good quality blasted rubble including conveyance of
material and labour charges et . complete as per direction of departmental officers at site .
Details of cost for 1 cum | 158.91 | cum | 2,882.82 ₹4.6 L | 2,901 ₹4.6 L | 2,662 ₹4.2 L |
| 1.00 | OD32754/2025-2026:Dry Rubble Masonry (without concrete levelling course ) with good quality blasted rubble (
without bond stone ) , and packing to compactness to lines and levels ,cost and conveyance of
all materials labour charge etc. complete as per direction of departmental officers at site.
Details of cost for 1 cum | 367.31 | cum | 4,166.12 ₹15.3 L | 4,193 ₹15.4 L | 3,847 ₹14.1 L |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 115.88 | sqm | 314.72 ₹36,469.12 | 316 ₹36,617.45 | 291 ₹33,720.50 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 38.79 | cum | 8,548.35 ₹3.3 L | 8,603 ₹3.3 L | 7,893 ₹3.1 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,133.51 | kilogram | 91.63 ₹2.0 L | 92 ₹2.0 L | 85 ₹1.8 L |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 107.55 | cum | 6,799.94 ₹7.3 L | 6,844 ₹7.4 L | 6,278 ₹6.8 L |
Tender Value
₹50.8 L
EMD Value
₹50,000
Closing Date
21 Feb 2026, 6:00 pmClosed
EXECUTIVE ENGINEER
EXECUTIVE ENGINEER K D DIVISION THANNEERMUKKOM
GENERAL-Kannitta B-2025-KP-FMPImprovement works to kannitta B Padasekharam in Alappuzha Municipality in Ambalappuzha LAC-General Civil Work
2026_Irrig_835961_1
31/EE/KD/2025-26
Open Tender
Civil Works - Others
365 days
Alappuzha
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
4 Mar 2026
12 Feb 2026
23 Feb 2026
12 Feb 2026
21 Feb 2026
12 Feb 2026
Improvement Works-Masonry Retaining wall
60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m.
60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD32753/2025-2026:Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges et . complete as per direction of departmental officers at site . Details of cost for 1 cum
OD32754/2025-2026:Dry Rubble Masonry (without concrete levelling course ) with good quality blasted rubble ( without bond stone ) , and packing to compactness to lines and levels ,cost and conveyance of all materials labour charge etc. complete as per direction of departmental officers at site. Details of cost for 1 cum
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
19.6.5:Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:450 mm dia R.C.C. pipe
OD44389/2025-2026:Supplying and stacking well matured 1/2 split and straight 6 m long coconut post for driving down through various strata bellow bed level including cost coveyance labour charges etc complete.
OD44390/2025-2026:Driving down coconut pile half split to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile driving down after pointing the bottom end. Details for one post of 6m long 15 numbers per day 6X15=90m Details for 90m length.
OD44392/2025-2026:Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces of required length and tied to the post with iron wires etc complete as per standard specification.
OD32951/2025-2026:Bund formation : Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, rolling each layer with 1/2 tonne roller or wooden or steel rammers and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50m and lift up to 1.5m. All kinds of soil (2.2.1-2.4-2.5).
OD45872/2025-2026:Strengthening the earthen bund using coir grab textile 740 gm etc complete including conveyance all other incidental charges as per the direction of Departmental officers at site. one sqm
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1406725.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
viewsbd.pdf
Tender Documents • 8.06 MB
BOQ_1406725.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid