| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 CrAccepted-Finance | ₹4.4 Cr | 1 | Accepted-Finance As per Technical and financial score |
| 2 | 2₹4.5 Cr+₹10.5 L (2.40%)Accepted-Finance | ₹4.5 Cr+₹10.5 L (2.40%) | 2 | Accepted-Finance As per Technical and financial score |
| 3 | 3₹5.7 Cr+₹1.4 Cr (31.0%)Accepted-Finance | ₹5.7 Cr+₹1.4 Cr (31.0%) | 3 | Accepted-Finance As per Technical and financial score |
| 4 | 4₹5.8 Cr+₹1.4 Cr (32.0%)Accepted-Finance | ₹5.8 Cr+₹1.4 Cr (32.0%) | 4 | Accepted-Finance As per Technical and financial score |
| 5 | 5₹5.6 Cr+₹1.2 Cr (27.5%)Accepted-Finance | ₹5.6 Cr+₹1.2 Cr (27.5%) | 5 | Accepted-Finance As per Technical and financial score |
Tender Value
Refer Docs
Closing Date
8 Jan 2024, 3:00 pmClosed
Regional Officer
Regional office MoRTH House No 281 sector 1Channi Himmat Jammu
Consultancy Services for AE for supervision of Construction of Realignment Between Pandrass_Pashkyum (Net Length is 27.10 km) on road Zozila_Kargil_Leh (NH_1) to 2 lane specifications under Project Vijayak (BRO) in the UT of Ladakh on EPC Mode
2023_MoRTH_784424_1
RW/JK/W(57)/BRO/Ladakh/2023
Open Tender
Consultancy
EPC Contract
2280 days
Ladakh
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
RPAO MoRTH
Exempted
Jammu
8 Mar 2024
8 Dec 2023
9 Jan 2024
8 Dec 2023
8 Jan 2024
8 Dec 2023
8 Dec 2023 - 22 Dec 2023
22 Dec 2023
Amount
Remuneration for Professional Staff (inclusive of per Diem allowance)
Team Leader cum Senior Highway Engineer
Resident cum Highway Engineer
Bridge/Structural Engineer
Senior Quality cum Material Expert
Senior Pavement specialist
Road Safety Expert
Sub-Professional Staff
Survey Engineer (2 nos)
Assistant Highway Engineer (2 nos)
CAD Expert
Environmental Engineer
Assistant Bridge Engineer (2 nos)
Assistant Quality cum Material Engineer (3 nos)
Electrical Engineer
Quantity Surveyor
Support Staff (inclusive of per diem allowance)
Office Manager
Accountant cum Cashier (01 No.)
Steno cum Computer Operator (01 No.)
Office Boy
Transportation (Fixed Costs)
Innova or equivalent not more than 2 years old) (1*15 (Construction Period) ) Rate per month
Scorpio or equivalent 4 x 4 vehicles (not more than 2 years old) (1*15 (ConstructionPeriod))
Bolero or equivalent 4 x 4 vehicles (not more than 2 years old) (1*15 (Construction Period) + 1*60 (DLP)) =75 months Rate per month
Duty Travel to Site(Fixed Costs): Professional and Sub-Professional Staff.
The employer may require the Key Personnel to visit the Employer’s HQ office or any other office as per direction. The quoted amount should include travel fare for 60 round trip per key personnel to Employer’s Head Office or 2 working days (including Air fare, Food, Boarding & Lodging charges, TA/DA, Taxi, etc. Complete).
Office Rent (Fixed Costs) Minimum200 sq m area of office shall be rented The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. (Rate per Month)
During Construction period
During Maintenance /DLP period
Office Supplies, Utilities and Communication (Fixed Costs), Rate per Month
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
The cost shall includerentalcharges toward sall such furniture and equipmentas required for proper functioning of office. Office furniture shall include executivetables, chairs, visitorchairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone(2external & 10internallines),photocopier(15ppm,12000copiesper month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD- 250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded antivirus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
During Construction period
During Maintenance /DLP period
Reports and Document Printing ( rate as per copy)
Monthly reports (Design and Construction)
Half yearly Reports
Various others reports as provided in the Concession Agreement such as Completion Report
Road Survey Equipment, Rate per Km
Surface defects detection and roughness measurement using Network Survey Vehicle
Pavement strength measurement using FWD
Bridge inspection using Mobile Bridge Inspection Unit
Road signs inspection using Retro Reflectometer
Contigencies A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. (Fixed as Rs. 10,00,000)
AICONS Engineering Pvt. Ltd.
SUGAM TECHNOCRATS PRIVATE LIMITED
Indian Technocrat Limited
Hexa Co.
G-Eng Advisory Services Pvt. Ltd.
Geo Designs and Reserch Pvt. Ltd.
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .