Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 1612 JAWAHAR COLONY NIT 45 FEET ROAD 45 FEET ROAD FARIDABAD HARYANA 121005 | FARIDABAD | HARYANA | 121005 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance 19 421 VRINDAVAN BUILDING OPP GOVT ITI HMT ROAD KALAMASSERY ERNAKULAM KERALA 683104 | ERNAKULAM | KERALA | 683104 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
6 Jul 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM (P and P) UC
DGM (P and P) UC, FACT Ltd, Udyogamandal, Eloor
Leak arresting and Oil filtration work of Transformers in Petrochemical Plants 2020
2020_FACT_565767_1
5062/2020-2021/E21667
Open Tender
Miscellaneous Works
Item Rate
30 days
Udyogmandal
Please refer Tender documents.
4 documents required · 4 mandatory
₹50
Yes
FACT Ltd
₹12,000
Yes
7 Jul 2020
18 Jun 2020
7 Jul 2020
18 Jun 2020
6 Jul 2020
18 Jun 2020
90 days
Leak arresting & Oil filtration work of Transformers in Petrochemical Plants-2020
Arresting of oil leak through various flanges / joints of TELK make 11/0.433 kV, 1.6 MVA Transformer-8C (M/c Sl. No. 110091-4), Oil capacity-2280 litres. Scope of work: A) Primary inspection of the transformer. B) Draining of oil from the transformer C) Disconnection and disassembling of bushings, conservator, pipe lines, cooling fins etc. D) Disconnection of tap-changer leads and replacement of gaskets. E) Removal of band bolts and lifting upper cover to replace gasket. F) Rectification of oil leak by replacing of all old gaskets of bushings, radiators, drain plug, conservator, buchholz relay, breather & pipe line. G) Flushing the winding with new oil to clean inside. H) Tightening the inner connections. (Bushes shall also be replaced if found necessary as mentioned in item no: 6 & 9) I) Reassembling of the transformer to its original shape after replacing of top cover gaskets. J) Vacuum oil filling of the transformer. K) Filtering old oil to the required level as per cl.5 of special conditions. L) Hot oil circulation till satisfactory oil test results are achieved. M) Testing of oil as per cl.5 of special conditions.. N)Pre-commissioning checks and energisation. Scope also includes thorough cleaning and repainting of transformer exterior with one coat of epoxy primer and one coat of epoxy paint.
Arresting of oil leak through various flanges / joints of ITL make 11/0.433 kV, 1.6 MVA Transformer-12K (M/c Sl. No. 9104), Oil capacity-1220 litres. Scope of work: A) Primary inspection of the transformer. B) Draining of oil from the transformer C) Disconnection and disassembling of bushings, conservator, pipe lines, cooling fins etc. D) Disconnection of tap-changer leads and replacement of gaskets. E) Removal of band bolts and lifting upper cover to replace gasket. F) Rectification of oil leak by replacing of all old gaskets of bushings, radiators, drain plug, conservator, buchholz relay, breather & pipe line. G) Flushing the winding with new oil to clean inside. H) Tightening the inner connections. (Bushes shall also be replaced if found necessary as mentioned in item no:7 & 10) I) Reassembling of the transformer to its original Shape after replacing of top cover gaskets. J) Vacuum oil filling of the transformer. K) Filtering old oil to the required level as per cl.5 of special conditions.. L) Hot oil circulation till satisfactory oil test results are achieved. M) Testing of oil as per cl.5 of special conditions.. N) Pre commissioning checks and energisation Scope also includes thorough cleaning and repainting of transformer exterior with one coat of epoxy primer and one coat of epoxy paint.
Arresting of oil leak through various flanges / joints of TELK make 11/3.45 kV, 6.3 MVA Transformer-4K (M/c Sl. No. 110089-3), Oil capacity-3215 litres. Scope of work: A) Primary inspection of the transformer. B) Draining of oil from the transformer C) Disconnection and disassembling of bushings, conservator, pipe lines, cooling fins etc. D) Disconnection of tap-changer leads and replacement of gaskets. E) Removal of band bolts and lifting upper cover to replace gasket. F) Rectification of oil leak by replacing of all old gaskets of bushings, radiators, drain plug, conservator, buchholz relay, breather & pipe line. G) Flushing the winding with new oil to clean inside. H) Tightening the inner connections. (Bushes shall also be replaced if found necessary as mentioned in item no:8 & 11) I) Reassembling of the transformer to its original shape after replacing of top cover gaskets. J) Vacuum oil filling of the transformer. K) Filtering old oil to the required level as per cl.5 of special conditions. L) Hot oil circulation till satisfactory oil test results are achieved. M) Testing of oil as per cl.5 of special conditions.. N)Pre-commissioning checks and energisation. Scope also includes thorough cleaning and repainting of transformer exterior with one coat of epoxy primer and one coat of epoxy paint.
Transformer oil purification of TELK make 11/0.433 kV, 1.6 MVA Transformer-05C (M/c Sl. No. 110091-1), Oil capacity-2280 litres. Scope of work: A) Filtering and hot oil circulation till satisfactory oil test results is achieved. B) Testing of oil as per cl.5 of special conditions.. Vacuum oil filling method shall be followed during final filling of oil up to conservator level. The contractor shall ensure NIL air locks during final oil filling.
Transformer oil purification of TELK make 11/0.433 kV, 1.6 MVA Transformer-7C (M/c Sl. No. 110091-3), Oil capacity-2280 litres. Scope of work: A) Filtering and hot oil circulation till ll satisfactory oil test results is achieved. B) Testing of oil as per cl.5 of special conditions.. Vacuum oil filling method shall be followed during final filling of oil upto conservator level. The contractor shall ensure NIL air locks during final oil filling.
Supply and replacing the ceramic bushes on LT side of Transformer, TELK make 11/0.433 kV, 1.6 MVA Transformer-8C (M/c Sl. No. 110091-4), Oil capacity-2280 litres. Note: This is an optional item. The bushes need to be replaced only after getting written confirmation from Engineer in Charge. Assembly with existing current bolt shall be used.
Supply and replacing the ceramic bushes on LT side of Transformer, ITL make 11/0.433 kV, 1.6 MVA Transformer-12K (M/c Sl. No. 9104), Oil capacity-1220 litres. Note: This is an optional item. The bushes need to be replaced only after getting written confirmation from Engineer in Charge. Assembly with existing current bolt shall be used.
Supply and replacing the ceramic bushes on LT side of Transformer, TELK make 11/3.45 kV, 6.3 MVA Transformer-4K (M/c Sl. No. 110089-3), Oil capacity-3215 litres. Note: This is an optional item. The bushes need to be replaced only after getting written confirmation from Engineer in Charge. Assembly with existing current bolt shall be used.
Supply and replacing the ceramic bushes on HT side of Transformer, TELK make 11/0.433 kV, 1.6 MVA Transformer-8C (M/c Sl. No. 110091-4), Oil capacity-2280 litres. Note: This is an optional item. The bushes need to be replaced only after getting written confirmation from Engineer in Charge. Assembly with existing current bolt shall be used.
Supply and replacing the ceramic bushes on HT side of Transformer, ITL make 11/0.433 kV, 1.6 MVA Transformer-12K (M/c Sl. No. 9104), Oil capacity-1220 litres. Note: This is an optional item. The bushes need to be replaced only after getting written confirmation from Engineer in Charge. Assembly with existing current bolt shall be used.
Supply and replacing the ceramic bushes on HT side of Transformer, TELK make 11/3.45 kV, 6.3 MVA Transformer-4K (M/c Sl. No. 110089-3), Oil capacity-3215 litres. Note: This is an optional item. The bushes need to be replaced only after getting written confirmation from Engineer in Charge. Assembly with existing current bolt shall be used
Supply of gaskets and oil seals for the transformer, TELK make 11/0.433 kV, 1.6 MVA Transformer-8C (M/c Sl. No. 110091-4), Oil capacity-2280 litres. Specifications of Rubberised Cork Gasket: The supplied gasket shall confirm to IS and following specifications: Type : C- very good oil resistant Grade: R C-70 C Sp. Gravity: 0.7- 0.8 Hardness: 70 +/- 5 irhd Compressibility@ 28 Kg/cm2- 30 +/- 5% for 6.3 mm 33 +/- 5 % for 9.6 mm Recovery@ 28 Kg/cm2- 80 (minimum)
Supply of gaskets and oil seals for the transformer, ITL make 11/0.433 kV, 1.6 MVA Transformer-12K (M/c Sl. No. 9104), Oil capacity-1220 litres. Specifications of Rubberized Cork Gasket: The supplied gasket shall confirm to IS and following specifications: Type : C- very good oil resistant Grade: R C-70 C Sp. Gravity: 0.7- 0.8 Hardness: 70 +/- 5 irhd Compressibility@ 28 Kg/cm2- 30 +/- 5% for 6.3 mm 33 +/- 5 % for 9.6 mm Recovery@ 28 Kg/cm2- 80 (minimum)
Supply of gaskets and oil seals for the transformer, TELK make 11/3.45 kV, 6.3 MVA Transformer-4K (M/c Sl. No. 110089-3), Oil capacity-3215 litres. Specifications of Rubberized Cork Gasket: The supplied gasket shall confirm to IS and following specifications: Type : C- very good oil resistant Grade: R C-70 C Sp. Gravity: 0.7- 0.8 Hardness: 70 +/- 5 irhd Compressibility@ 28 Kg/cm2- 30 +/- 5% for 6.3 mm 33 +/- 5 % for 9.6 mm Recovery@ 28 Kg/cm2- 80 (minimum)
Supply and fixing of new Silica gel air breather for 1250 kVA / 1600 kVA Transformer
Supply and fixing of Buchholz relay for 1250 kVA / 1600 kVA Transformer
Supply and fixing of Buchholz relay for 6300 kVA Transformer
Powertech Equipments and Services
GC CONTROL SYSTEMS PVT. LTD.
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .