Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
13 Nov 2026, 6:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE (I) DM Visakhapatnam
GE (I) DM Visakhapatnam
SERVICING MAINTENANCE OF CHLORINE AGITATORS FLOCCULATORS AND CLARIFIER SYSTEM AND ALLIED WORKS AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE(I) DM VISAKHAPATNAM
2026_MES_795426_1
8650/C/E8
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
Naval Dockyard Visakhapatnam
As per tender document
8 documents required · 8 mandatory
₹500
GE (I) DM Visakhapatnam
₹90,000
Yes
23 Oct 2026
23 Oct 2026
16 Nov 2026
23 Oct 2026
13 Nov 2026
6 Nov 2026
24 Oct 2026 - 4 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Weekly maintenance & repair including breakdown repair as required of mechanical actuated diaphram metering chemcial dozing pump, model - GB-401/402, Make- Milton Roy complete with 3 ph/1ph, 0.37 kw motor, by checking oil level in drive compartment, topping of OEM recommended oil ( Grade- Bharat Hydrol 220), and replacement of complete oil at interval of 90 days (appx qty - 01 Ltr), complete cleaning all external surface, checking of all inlet/ output UPVC pipe connection for any liquid leakage and rectification, complete cleaning of pump flow circuit from suction to delivery point with clean water and rectification of any liquid leakage, cleaning of Y- strainer, dismantling/ opening of pump and complete cleaning/ removing any sediment and replacing required item complete all as specified and directed.
Total dozing pump - 04 set at filter bed. | 48 | Each set Per week | - | - |
| 2 | Weekly maintenance & repair including breakdown repair as required of mechanical actuated diaphram metering chemcial dozing pump, model - GB-402, Make- Milton Roy complete with 3 ph/1ph, 0.37 kw motor, by checking oil level in drive compartment, topping of OEM recommended oil ( Grade- Bharat Hydrol 220), and replacement of complete oil at interval of 90 days (appx qty - 01 Ltr), complete cleaning all external surface, checking of all inlet/ output UPVC pipe connection for any liquid leakage and rectification, complete cleaning of pump flow circuit from suction to delivery point with clean water and rectification of any liquid leakage, cleaning of Y- strainer, dismantling/ opening of pump and complete cleaning/ removing any sediment and replacing required item complete all as specified and directed.
Total dozing pump - 02 set at near low lift. | 48 | Each set Per week | - | - |
| 2.01 | (Note:(i) If dozing pump is found non- functional more than 03 hours, recovery shall be made @ twice the quoted rate for every hour of non - functional period.(ii) spares will be measured and paid separately)(iii) Quoted rate will include transportation cost if repair is carried out by taking out pump to civil workshop | - | - | - | - |
| 3 | Weekly maintenance & repair including breadown repair as require of chlorine mixing agitator 3ph/1ph motor 3.75 kw, Make- CG, by removing motor from base, cleaning/ greasing rorating gears, chekcing for any defects in gear system and rectification by replacing required item, cleanding of rod nd blade, checking for any damaged to rod and blade and replacing required item, checking serviceability of level indicator and rectify by replacing required item, cleaning of complete agiator FRP chamber by removing all sludge and cleaning with clean water, cleaning of outside are around agitator chamber and pump complete all as specified and directed.
Total agitator-01No.
Note : if agitator is found non-funcitonal more than 03 hours, recovery shall be made @ twice the quoted rate for every hour of non- functional period | 48 | Each set Per week | - | - |
| 4 | Weekly maintenance & repair including breadown repair as require of Alum mixing agitator 3ph/1ph motor 1.11 kw, Make- CG, by removing motor from base, cleaning/ greasing rorating gears, chekcing for any defects in gear system and rectification by replacing required item, cleanding of rod nd blade, checking for any damaged to rod and blade and replacing required item, checking serviceability of level indicator and rectify by replacing required item, cleaning of complete agiator FRP chamber by removing all sludge and cleaning with clean water, cleaning of outside are around agitator chamber and pump complete all as specified and directed.
Total agitator-01No.
Note: if agitator is found non-functional more than 03 hours, recovery shall be made @ twice the quoted rate for every hour of non- functional period. | 48 | Each set Per week | - | - |
| 5 | Weekly maintenance & repair including breadown repair as require of Alum mixing agitator in Tank1 and Tank 2 3ph/1ph motor 1.5 kw, Make- CG, by removing motor from base, cleaning/ greasing rorating gears, chekcing for any defects in gear system and rectification by replacing required item, cleanding of rod nd blade, checking for any damaged to rod and blade and replacing required item, checking serviceability of level indicator and rectify by replacing required item, cleaning of complete agiator FRP chamber by removing all sludge and cleaning with clean water, cleaning of outside are around agitator chamber and pump complete all as specified and directed.
Total agitator-02Nos
Note: if agitator is found non-funcitonal more than 03 hours, recovery shall be made @ twice the quoted rate for every hour of non- functional period. | 48 | Each set Per week | - | - |
| 6 | Weekly maintenance & repair including breadown repair as require of Clarifier flocculator 3ph/1ph motor 3.75 kw, Make- CG, by removing motor from base, cleaning/ greasing rorating gears, chekcing for any defects in gear system and rectification by replacing required item, cleanding of rod nd blade, checking for any damaged to rod and blade and replacing required item, checking serviceability of level indicator and rectify by replacing required item, cleaning of complete agiator FRP chamber by removing all sludge and cleaning with clean water, cleaning of outside are around agitator chamber and pump complete all as specified and directed.
Total agitator-01Nos
Note: if agitator is found non-funcitonal more than 03 hours, recovery shall be made @ twice the quoted rate for every hour of non- functional period | 48 | Each set Per week | - | - |
| 7 | Weekly maintenance & repair including breadown repair as require of Clarifier flocculator 3ph/1ph motor 0.375 kw, Make- CG, by removing motor from base, cleaning/ greasing rorating gears, chekcing for any defects in gear system and rectification by replacing required item, cleanding of rod nd blade, checking for any damaged to rod and blade and replacing required item, checking serviceability of level indicator and rectify by replacing required item, cleaning of complete agiator FRP chamber by removing all sludge and cleaning with clean water, cleaning of outside are around agitator chamber and pump complete all as specified and directed.
Total agitator-04Nos
Note: if agitator is found non-funcitonal more than 03 hours, recovery shall be made @ twice the quoted rate for every hour of non- functional period | 48 | Each set Per week | - | - |
| 8 | M&L for rewinding of Motor upto 3.75kw after dismatling taking out from pump set base, transportation to civil workshop outside ND(V), opening of complete motor, dismatling stator/rotor, rewinding the complete stator of motor with existing size of super enameled copper wire as per existing turn, heating, vernishing, replacement of both end bearing, Connecton plate, Connection terminals with new copper lugs for all 06 terminal, re-assemble, transport back to ND (V), reinstall at pump base, connection with pump coupling, making proper alignment , testing for satisfactory run complete all as specified and directed .
Motor Make- Kirloskar | 4 | Each | - | - |
| 9 | All as per item No. 09 above, but of size 0.37kw | 3 | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
8650Tender.pdf
Tender Documents • 1.07 MB
BOQ_892118.xls
BOQ • 0.27 MB
8650corrig1.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .