Tender Value
₹37.6 L
EMD Value
₹75,181
Closing Date
16 Jul 2026, 4:00 pmClosed
AS PER THE NIT
AS PER THE NIT
Construction of Guard Post at front and rear gates with allied items at Forensic Science Laboratory, Bemina Srinagar
2026_PWDJK_315206_1
NIT No.32/EE/RnB/BM/CS/3396-3404 of 2026-27 DATED 08.07.2026
Open Tender
Civil Works
Percentage
90 days
AS PER THE NIT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
AS PER THE NIT
₹75,181
16 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
16 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including
disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 0.45 | cum | 1,725.2 | ₹776.34 |
| 2 | Demolishing brick work manually/by mechanical means including
stacking of serviceable material and disposal of unserviceable material
within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 1 | cum | 1,458.45 | ₹1,456.99 |
| 3 | Engagement of Helpers forClearance & Shifting of Material. | - | no | 800 | - |
| 4 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 1 | cum | 592.9 | ₹592.31 |
| 5 | Extra rates for quantities of works executed :
In or under water and/ or liquid mud, including pumping out water as
required. | 1 | cum | 118.58 | ₹118.46 |
| 6 | Providing and Laying Stone soling icl. Compacting, watering incl. all leads, lifts, head loads and carriages of all material involved complete. | 1 | cum | 950 | ₹949.05 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) incl. all leads, lifts, head loads and carriages of all material involved complete. | 1 | cum | 5,667.9 | ₹5,662.23 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). incl. all leads, lifts, head loads and carriages of all material involved complete. | 12.14 | cum | 0.9 | ₹10.93 |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 16.03 | cum | 10,286.85 | ₹1,64,898.21 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) incl. all leads, lifts, head loads and carriages of all material involved complete. | 1 | cum | 7,056.25 | ₹7,049.19 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
BOQ_1021640.xls
BOQ • 0.55 MB
ext32.pdf
PDF • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .