Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5 LAccepted-AOC | ₹5 L Quoted ₹4.9 L | L1 | Accepted-AOC accepeted |
| 2 | L2₹5.2 LRejected-Finance | ₹5.2 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | Mohamed Hanifa L2 | ARUMUGAM SAKTHIVEL L1 |
|---|---|---|---|---|---|
| 1.00 | Providing Cement Concrete Pavement at Kuppanarpatti in K.Periyapatti Panchayat Earth work excavation and depositing on bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc | 12.42 | cu.m | 276.97 ₹3,439.97 | 263 ₹3,266.46 |
| 2.00 | Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications. | 21.39 | cu.m | 2,308.05 ₹49,369.19 | 2,198 ₹47,015.22 |
| 3.00 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 21.39 | cu.m | 5,831.34 ₹1.2 L | 5,553 ₹1.2 L |
| 4.00 | Supplying and erecting , centering shuttering includung conveyance of all materials to worksite and all charges etc complete (Below GL) | 84.9 | sq.m | 574.88 ₹48,807.31 | 546 ₹46,355.40 |
| 5.00 | Cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. | 10.35 | cu.m | 7,199.47 ₹74,514.51 | 6,856 ₹70,959.60 |
| 6.00 | Plain Cement Concrete 1:1.5:3 (one cement, one and half M.Sand and three hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 15.53 | cu.m | 7,774.82 ₹1.2 L | 7,404 ₹1.1 L |
| 7.00 | Provision for Bitumen Pad charges | 2.93 | sq.m | 246.02 ₹720.84 | 234 ₹685.62 |
| 8.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.06 | MT | 96,528.71 ₹5,791.72 | 91,932 ₹5,515.92 |
| 9.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.58 | cu.m | 9,759.91 ₹5,660.75 | 9,295 ₹5,391.10 |
| 10.00 | Provision for Name board | 1 | Nos | 5,250 ₹5,250 | 5,000 ₹5,000 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
13 Mar 2026, 4:00 pmClosed
BDO BP
Panchayat Union Office Manapparai
Providing CC Road at Kuppanarapatti in K.Periyapatti Panchayat Manapparai Block in Tiruchirappalli District under MLACDS- Srirangam 2025-26
2026_RDTN_674229_1
A2/2197/2025 dt 10.03.2026
Open Tender
Civil Works
90 days
Manapparai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,000
20 Mar 2026
13 Mar 2026
13 Mar 2026
13 Mar 2026
13 Mar 2026
13 Mar 2026
Providing Cement Concrete Pavement at Kuppanarpatti in K.Periyapatti Panchayat Earth work excavation and depositing on bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc
Supplying and filling in foundations and basement with filling M- sand in layers not exceeding 15 cm.thick,well watered,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
Supplying and erecting , centering shuttering includung conveyance of all materials to worksite and all charges etc complete (Below GL)
Cement Concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc.
Plain Cement Concrete 1:1.5:3 (one cement, one and half M.Sand and three hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Provision for Bitumen Pad charges
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.48 MB
TechnicalBidkup.pdf
Tender Documents • 0.41 MB
BOQ_810391.xls
BOQ • 0.28 MB
PriceBidkup.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid