Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹9.0 L
EMD Value
₹10,000
Closing Date
18 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Panchayat (R&B) Division, Dang - Ahwa
Construction of Compound Wall with brick Masonary Ta. Subir (Kel primary School ) Dist.Dangs
362603
23 OF 2026 - 27
Open
Civil Works - Buildings
Works
Dang
7 documents required · 6 mandatory · 1 optional
₹900
Executive Engineer, Panchayat (R & B) Division, Ahwa
₹10,000
4 Nov 2026
4 Nov 2026
4 Nov 2026
18 Nov 2026
4 Nov 2026
90 days
Name of Work:- Year 2025-26 Construction of Compound Wall with brick Masonary Ta. Subir (Kel
primary School ) Dist.Dangs
: : BILL OF QUANTITY.' : :
Percentage Rate Tender
It. Description of Item (with brief Specification Rate In
Quantity Unit Amount
No. and reference to book of specifications) Figures
1 Excavation for foundation upto 1.5 m depth including 18.20 Cum. 275.33
sorting out and stacking of useful materials and
disposing off the excavated stuff upto 50 Meter
lead.(C) Hard Murrum
2 Providing and laying in foundation and plinth / under 3.17 Cum. 3106.67
floors lime concrete with hand broken stone
aggregates 40mm nominal size and 40% mortar
comprising of 1-Lime putty : 2-Fine sand and curing
complete excluding cost of formwork
3 Providing and laying cement concrete 1:2:4 (1- 2.78 Cum. 3824.10
Cement : 2- Coarse sand : 4- graded stone aggregates
20 mm nominal size) and curing complete excluding
cost of formwork in (A) Foundation and Plinth
4 Providing and laying ordinary cement concrete 1:2:4 (1 6.71 Cum. 8593.80
Cement 2- coarse sand : 4- graded stone aggregates
20 mm nominal size) and finishing smooth with,curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for R.C.C work in
(A) BEAMS :(i) Having cross-sectional area 0.05 to
5 Providing and laying ordinary cement concrete 1:2:4 (1 7.92 Cum. 12335.51
Cement 2- coarse sand : 4- graded stone aggregates
20 mm nominal size) and finishing smooth with,curing
etc. complete including the cost of formwork but
excluding the cost of reinforcement for R.C.C work in
(A) COLUMN :(i) Having cross-sectional area 0.05 to
6 Brick work using common burnt clay building brick 55.89 Cum. 4310.73
having crushing strength not less than 35 kg/sq. cm. in
foundation and plinth in cement mortar 1:6 ( 1 Cement:
6 fine sand) (B) Convention.
7 Providing and laying cement concrete 1:3:6 (1- 2.50 Cum. 4172.46
Cement : 3- Coarse sand : 6- crushed stone
aggregates 20 mm nominal size) and curing complete
including cost of formwork in (A) Wall Caps / Coping
8 Providing TMT Bar FE 500D reinforcement for R.C.C. 1633.50 Kgs 77.29
work including bending, binding and placing in position
complete upto floor two level
9 20 mm thick sand faced cement plaster with on wall 566.41 Sqmt 365.95
upto all height above ground level consisting 12 mm
thick backing coat of c.m. 1:3 (1 cement : 3 sand ) and
8 mm thick finishing coat of cm 1:1 (1 cement : 1 sand)
etc. complete.all height etc. complete
10 Finishing wall with water proofing cement paint of on 566.41 Sqmt 122.14
wall surface ( Two coats) to give an approved brand
manufacture and of requred shape even shade after
throughtly brushing of loose powered materials.
11 Providing and fixing Sliding compound gate of 50mm 19.80 Sqmt 3321.89
Sqr M,S pipe Asian Guide rail of 1.25" GI pipe with
rollar bearing MS 15 BG plate and Squar hallow pipe
frame as per architect detail drawing and design
includung cuting welding paiting with one a coat of red
oxide and two caoat of approved enamel oil paint etc
complate with all fixture & fasting fiting & Labour
Charges as per architect drawing detail.
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be written in
figures and words) of the estimated rate mentioned above Amount of my / our tender works out as under.
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works directed by the
Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt G.R.:
PRC-10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R. therefore in R.C.C.
items where the reisa change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer Executive Engineer
Panchayat ( R & B) Sub Division Panchayat (R & B) Division
Signature of the contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ CW Kel.pdf
building booklet.pdf
Clouse 24(iv) 34 52.pdf
GR - SBD with Index JJES_compressed.pdf
SBD CW Kel.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .