Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Updated dates
Tender Value
₹11.9 L
EMD Value
₹23,900
Closing Date
15 May 2026, 6:00 pmClosed
Executive Engineer Rew Baramulla
REW BARAMULLA
Construction of Pumpshed Khul passing through the land of Gh Nabi Ganie upto land of Bashir Ahmad Mir at Adipora, Block Sopore, under CDF, FY 2026-27
2026_RDPR_308553_3
02/Xen/Rew/Bla/2026-2027 Dated. 24/04/2026
Open Tender
Civil Works
45 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer REW Baramulla
₹23,900
5 May 2026
24 Apr 2026
16 May 2026
24 Apr 2026
15 May 2026
24 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | - | cum | - | - |
| 2 | Providing /laying of stone soling handpacked under floors and foundation trenches including dressing, watering, compacting incl. plum and all carriage up to site of work complete job | - | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level: 1:4:8 (1 Cement : 4 coarse sand : 8 crushed graded stone aggregate 20 mm nominal size ) excld. carriage of all materials involved complete. | - | cum | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 1 | sqm | - | - |
| 5 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level: 1:2:4 (1 Cement : 2 coarse sand : 4 crushed graded stone aggregate 20 mm nominal size ) excld. carriage of all materials involved complete | 1 | cum | - | - |
| 6 | Steel reinforcement in RCC work including cutting fixing complete | - | kg | - | - |
| 7 | Carriage of Materials Sand/Aggregate for an avg lead of 25kms by MT | 1 | cum | - | - |
| 8 | Providing /Fixing CIB including Photographs of work before, during & after execution of work complete job and any unforseen item site clearance as per requirement | - | Job | - | - |
stage.html
html • 0.04 MB
finance_999787.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_999787.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid