Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 202 TIRUPATI INDUSTRIAL ESTATE 202 TIRUPATI INDUSTRIAL ESTATE SUBHASH NAGAR BHANDUP WEST BHANDUP WEST MUMBAI CITY MAHARASHTRA 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | Admitted-Finance |
| 2 | Admitted-Finance 827 ECSTASY BUSINESS PARK J S D ROAD MULUND WEST MUMBAI MAHARASHTRA 400080 UDYAM MH 19 0059121 27AAFCD0100J1Z6 R 29AAFCD0100J1Z2 S | MUMBAI SUBURBAN | MAHARASHTRA | 400080 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical OFFICE NO 09 FIRST FLOOR HANSRAJ DAMODAR TRUST BUILDING GOA STREET FORT MUMBAI MAHARASHTRA 400001 | MUMBAI | MAHARASHTRA | 400001 | Rejected-Technical TECHNICALLY DISQUALIFIED |
Tender Value
Refer Docs
Closing Date
1 Feb 2022, 10:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGMCOM
INCOD OFFICE NAVAL DOCKYARD SBS MARG MUMBAI 400023
MAINTENANCE OF FUME EXTRACTION SYSTEM FOR 01 YEAR (EXTENDABLE UPTO ADDITIONAL 01 YEAR) FOR C. NO. 47/ECE DEPARTMENT
2022_NAVY_502295_1
DYT/ECE/21-22/106(D)2/TS-IN /FUME EXTRACTION/029
Limited
Miscellaneous Services
Item Rate
365 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
NAVAL DOCKYARD MUMBAI
19 May 2022
18 Jan 2022
2 Feb 2022
18 Jan 2022
1 Feb 2022
25 Jan 2022
25 Jan 2022
180 days
Amount
Maintenance of main fume extraction Exhaust Blowers of electroplating and battery sections. (i) Dismantle of blowers. (ii) Repair/ Overhaul of Impellers. (iii) Repair/ Overhaul of Coupling Shafts. (iv) Repair/ Overhaul shaft Bearings. (v) Repair/ Overhaul of Impeller Bearings. (vi) Alignment of Impeller with blower motors. (vii) Repair/ Overhauling of Blower Motors. (viii) Repair of winding of motors. (ix) Impregnation of blower motor winding with varnish. (x) Balancing of blower motors . (xi) Repair/ Overhaul of Blower motor pedestal bearings. (xii) Greasing of all bearings of blower motors, impellers and coupling shafts. (xiii) Repair/ Overhaul of “V” belts. (xiv) Balancing of coupling shafts. (xv) Balancing of impellers. (xvi) Repair/ Overhaul of “V” Belts groove rollers. (xvii) Cleaning of Blower scrubbers. (xviii) Maintain the water level in the blower scrubbers. (xix) Repair/ Overhaul of PVC Gate Valves. (xx) Repair / FRP lining of ducts from lines to blowers. (xxi) FRP lining of Scrubbers. (xxii) Cleaning of Blowers Chimneys. (xxiii) FRP lining of Blower Chimneys.
Maintenance of Pump Motors (i) Dismantle of pump Motors. (ii) Overhauling of pumps and motors. (iii) Repair/ Overhaul of impeller of the pumps. (iv) Repair of winding of motors. (v) Impregnation of blower motor winding with varnish. (vi) Balancing of pump shaft. (vii) Balancing of motors with pump impellers.
Maintenance of Dust Collectors for Budding (i) Removal of Dust from Buddies. (ii) Dismantle of dust collector buddies. (iii) Overhauling of dust collector. (iv) Repair/ Overhaul of motors. (v) Repair/ Overhaul of impeller bearings. (vi) Balancing of impeller. (vii) Balancing of coupling shaft. (viii) Repair of winding of motors. (ix) Balancing of pump shaft. (x) Impregnation of blower motor winding with varnish. (xi) FRP lining of Dust collectors. (xii) Repair of Ducts of Buffing/ Polishing rooms. (xiii) FRP lining of Ducts.
Maintenance Control Panel consists of (i) Soft Starters - 04 in nos. (a) Overhauling of soft starters. (b) Repair/ Calibration of timers. (c) Repair/ Calibration of overload sensors. (d) Repair of SCR assembly. (e) Repair/ Overhaul of Servo motors. (f) Calibration of Time relays. (g) Calibration of overload Relays (h) Calibration/setting of Thyristors (i) Calibration and setting of voltages as per requirement (Pedestal voltage, Trigger timings, etc.) (ii) Automatic Star Delta Starters - 04 in nos. (a) Dismantle of starters. (b) Repair/calibration of automatic timers. (c) Repair of overload relays. (d) Repair/calibration of NVC relays. (e) Contacts cleaning. (f) Repair/ setting of NVC plungers. (g) Calibration overload relays. (h) Calibration of Time Relays. (iii) DOL Starters - 07 in nos. (a) Dismantle of starters. (b) Repair/ Calibration of NVC relays. (c) Repair of overload relays. (d) Contacts cleaning. (e) Repair/ Calibration of NVC plungers. (f) Calibration of Time Relays. (g) Calibration of overload relays.
Maintenance of Scrubbing Assembly, Chimney and Valves (a) FRP lining of Scrubbers. (b) FRP lining of Chimneys. (c) Cleaning of Chimneys. (d) Repairing of Ducts. (e) Drainage of water from scrubbers. (f) Repair/ Overhaul of Duct Gate Valves. (g) Dismantle of chimneys section wise for repair / Re-FRP lining, cleaning and reassemble approx at a height of 30 Mtrs. (A) Monthly Routine check (i) Check the system for abnormal vibration and sound. (ii) Check the shaft bearings, temperature, blower and pump motor temperature. (iii) Inspect the pipe lines, valves and pumps mechanical seal for any water leakage. (iv) Check the condition of “V” belts for any wear & tear. (v) Check the water levels of scrubber and refill if required. (B) Quarterly Routine check (i) Open the dust collecting chamber of buffing exhaust and close it. (ii) Check the tightness of all fasteners. (C) Half Yearly Routine Check (i) Drain the scrubber tank and refill it with fresh water. (ii) Cleaning of all the shaft bearings and removing of old grease and fill with new grease (iii) Dusting up the control panels by using blowers and alcohol wash. (D) Yearly Routine Check (i) Dismantle/Overhaul blower motors/Pump motors and re-assemble, test, refit and set to work. (ii) Overhauling of the control panel including soft starters, DOL starters and automatic star delta starters, calibrate over load relays, timers, breakers and contactors. (iii) Change the grease in the blower motors, pump motors and all the rotating assemblies and attend the operational defects and rectify the same from time to time. Maintenance of Scrubbing Assembly, Chimney and Valves (a) FRP lining of Scrubbers. (b) FRP lining of Chimneys. (c) Cleaning of Chimneys. (d) Repairing of Ducts. (e) Drainage of water from scrubbers. (f) Repair/ Overhaul of Duct Gate Valves. (g) Dismantle of chimneys section wise for repair / Re-FRP lining, cleaning and reassemble approx at a height of 30 Mtrs. (A) Monthly Routine check (i) Check the system for abnormal vibration and sound. (ii) Check the shaft bearings, temperature, blower and pump motor temperature. (iii) Inspect the pipe lines, valves and pumps mechanical seal for any water leakage. (iv) Check the condition of “V” belts for any wear & tear. (v) Check the water levels of scrubber and refill if required. (B) Quarterly Routine check (i) Open the dust collecting chamber of buffing exhaust and close it. (ii) Check the tightness of all fasteners. (C) Half Yearly Routine Check (i) Drain the scrubber tank and refill it with fresh water. (ii) Cleaning of all the shaft bearings and removing of old grease and fill with new grease (iii) Dusting up the control panels by using blowers and alcohol wash. (D) Yearly Routine Check (i) Dismantle/Overhaul blower motors/Pump motors and re-assemble, test, refit and set to work. (ii) Overhauling of the control panel including soft starters, DOL starters and automatic star delta starters, calibrate over load relays, timers, breakers and contactors. (iii) Change the grease in the blower motors, pump motors and all the rotating assemblies and attend the operational defects and rectify the same from time to time. Maintenance of Scrubbing Assembly, Chimney and Valves (a) FRP lining of Scrubbers. (b) FRP lining of Chimneys. (c) Cleaning of Chimneys. (d) Repairing of Ducts. (e) Drainage of water from scrubbers. (f) Repair/ Overhaul of Duct Gate Valves. (g) Dismantle of chimneys section wise for repair / Re-FRP lining, cleaning and reassemble approx at a height of 30 Mtrs. (A) Monthly Routine check (i) Check the system for abnormal vibration and sound. (ii) Check the shaft bearings, temperature, blower and pump motor temperature. (iii) Inspect the pipe lines, valves and pumps mechanical seal for any water leakage. (iv) Check the condition of “V” belts for any wear & tear. (v) Check the water levels of scrubber and refill if required. (B) Quarterly Routine check (i) Open the dust collecting chamber of buffing exhaust and close it. (ii) Check the tightness of all fasteners. (C) Half Yearly Routine Check (i) Drain the scrubber tank and refill it with fresh water. (ii) Cleaning of all the shaft bearings and removing of old grease and fill with new grease (iii) Dusting up the control panels by using blowers and alcohol wash. (D) Yearly Routine Check (i) Dismantle/Overhaul blower motors/Pump motors and re-assemble, test, refit and set to work. (ii) Overhauling of the control panel including soft starters, DOL starters and automatic star delta starters, calibrate over load relays, timers, breakers and contactors. (iii) Change the grease in the blower motors, pump motors and all the rotating assemblies and attend the operational defects and rectify the same from time to time.
Delta Technocare(I) Pvt Ltd
High Seas Engineers
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .