Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹11.2 L+₹1.1 L (10.8%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹11.8 L+₹1.6 L (15.8%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹12.5 L+₹2.4 L (23.6%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹13.2 L+₹3.1 L (30.5%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹23.0 L
EMD Value
₹45,997
Closing Date
13 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Civil Division-X
L.M. BUND, OFFICE COMPLEX, KRISHAN KUNJ, DELHI
Maintenance of Abul Fazal drain for the period of 04 months i.e. Dec 2026 to March 2027 from RD 0m to RD 2024m.
2026_IFC_301086_1
EE/CD-X/2025-26/79
Open Tender
Civil Works
Works
120 days
Abul Fazal Drain
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹45,997
13 Nov 2026
6 Nov 2026
13 Nov 2026
6 Nov 2026
13 Nov 2026
6 Nov 2026
75 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Hiring of 3D Hydraulic excavator(JCB machine) on hourly basis including operational charges like operator, helper, fuels etc. and cost of mobilization of machine to the site complete as per direction, of Engineer-in-charge (for the purpose of payment working hours of machine shall be recorded). | 480 | Per Hour | 1,025.9 | ₹4,92,432 |
| 2 | Hiring of tractor with trolly on daily basis alongwith operator, helper, fuel, mobil oil etc. complete for disposal of garbage, malba, silt etc. complete as per direction of Engineer-in-charge (for purpose of payment, working days of tractor with trolly will be recorded). | 120 | Per Shift | 4,023.6 | ₹4,82,832 |
| 3 | Maintenance of Drain by deploying manpower (labour) as per requirement of site for removal of all types of obstructions including garbage, floating material and dead animals above water level and cleaning of all existing culverts etc. from the bank of drain regularly to maintain the drain neat and clean in foul condition complete as per site requirement and directed by Enginner-in-charge.
Note 1: If any part of the reach found not clear upto the satisfaction of Engineer-in-charge for consecutive 03 days, a recovery of 3000 per km/per day for each side shall be made from the bills. | 4 | Per Months | 3,15,709 | ₹12,62,836 |
| 4 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 3,500 | Square metre | 17.64 | ₹61,740 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_401925.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .