Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹18.6 L+₹613.35 (0.03%)Rejected-AOC | L2 | Rejected-AOC Second lowest |
| Sl No | Description | Qty | Unit | SACHU SONY L2 | ROBY XAVIER L1 |
|---|---|---|---|---|---|
| 1.00Side Protection of Edathil thodu | |||||
| 1.00 | OD32059/2024-2025:Earthwork in under water excavation for removal of silt from water bodies/ thodu by mechanical means using sophisticated equipments like amphibian excavator or any equivalent mechanical equipment with necessary accessories like transport barges, mchanised boats etc. as appropriate and as directed to the desired depth to ensure free flow in the thodu/river including getting out and disposal of excavated earth, water weeds etc, with all leads and lifts and disposal of excavated material to place as directed by engineer in charge or formation of earthern bund on both banks of the thodu/river. The rate shall include temorary storage of all materials on the banks or other suitable locations by means of loaders/tippers/mechanised boats etc. as appropriate as directed. All the charges for labour, equipments, conveyance of equipments all incidental charges etc. complete as per the directions of the engineer in charge for fullfilling the final objective of removing all obstructions and to ensure free flow of water in the thodu/water bodies. | 31.5 | cum | 208.32 ₹6,562.08 | 207 ₹6,520.5 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 208.18 | cum | 236.97 ₹49,331.23 | 236 ₹49,129.3 Lowest |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 440 | cum | 3,864.7 ₹17,00,468 | 3,864 ₹17,00,160 Lowest |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 41.4 | sqm | 371.16 ₹15,366.02 | 370 ₹15,318 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 10.31 | cum | 8,845.34 ₹91,221.99 | 8,844 ₹91,208.17 Lowest |
Tender Value
₹16.9 L
EMD Value
₹42,339
Closing Date
30 Jul 2025, 2:00 pmClosed
Executive Engineer
O/o Office of the Executive Engineer, Minor Irrigation Division Kottayam
Side Protection and desilting of Edathil thodu in ward no.8 of Vaikom municipality
2025_Irrig_778262_1
IRR/IA/TR/4914/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
Vaikom
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹42,339
Yes
8 Sept 2025
21 Jul 2025
31 Jul 2025
21 Jul 2025
30 Jul 2025
21 Jul 2025
Amount
Side Protection of Edathil thodu
OD32059/2024-2025:Earthwork in under water excavation for removal of silt from water bodies/ thodu by mechanical means using sophisticated equipments like amphibian excavator or any equivalent mechanical equipment with necessary accessories like transport barges, mchanised boats etc. as appropriate and as directed to the desired depth to ensure free flow in the thodu/river including getting out and disposal of excavated earth, water weeds etc, with all leads and lifts and disposal of excavated material to place as directed by engineer in charge or formation of earthern bund on both banks of the thodu/river. The rate shall include temorary storage of all materials on the banks or other suitable locations by means of loaders/tippers/mechanised boats etc. as appropriate as directed. All the charges for labour, equipments, conveyance of equipments all incidental charges etc. complete as per the directions of the engineer in charge for fullfilling the final objective of removing all obstructions and to ensure free flow of water in the thodu/water bodies.
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
SACHU SONY (BID ID -2266041)
Bidder Name
ROBY XAVIER
SACHU SONY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .