| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-AOC C O LT MAAHANTA NARZARY W NO 5 TENGAPARA P O P S KOKRAJHAR DIST KOKRAJHAR BTC ASSAM PIN 783370 | KOKRAJHAR | KOKRAJHAR | ASSAM | 783370 | L1 | Accepted-AOC L1 bidder is awarded. | |
| 2 | L2₹14.6 L+₹77,086.56 (5.56%)Rejected-Finance VILL KENDUKONA P O PUTHIMARI PS RANGIA DIST KAMRUP ASSAM PIN 781380 | KAMRUP | ASSAM | 781380 | L2 | Rejected-Finance L2 rate is not accepted | |
| 3 | L3₹15.4 L+₹1.5 L (10.8%)Rejected-Finance VILL BANBAHAR PO KAYAKUCHI PS BARPETA DISTRICT BARPETA PIN 781352 | BARPETA | ASSAM | 781352 | L3 | Rejected-Finance L3 rate is not accepted | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical 06 LAWTOLA P O LAWTOLA P S MUKALMUA NALBARI PIN 781126 | NALBARI | ASSAM | 781126 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹15.4 L
EMD Value
₹30,833
Closing Date
18 Apr 2023, 2:00 pmClosed
MD, NHM, Assam
O/o Mission Director, NHM, Assam, Saikia Commercial Complex, Christanbasti, G.S Road Guwahati
Installation of Deep Tube Well 2 nos including electrical work Motor Pump Set at 100 bedded RNB Gossaigaon SDCH in Kokrajhar District under NHM Assam
2023_NHM_30371_1
NHM-32044/11/2022-Const-NHM/32
Open Tender
Civil Works - Building
Item Rate
15 days
Kokrajhar
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
₹30,833
Yes
8 Sept 2023
5 Apr 2023
19 Apr 2023
5 Apr 2023
18 Apr 2023
5 Apr 2023
Amount
Supplying including installation, connection as approved by the Deptt., testing and commissioning of CENTRIFUGAL MONOBLOCK PUMP SET complete as directed and specified by the deptt. 3 HP single Phase Centrifugal monoblock pump set (Crompton Greaves/Aquatic/ CRI/ V-Guardmake) 2900 rpm with DOL Starter (Crompton Greaves/Control & Switch Gear/BCH/L&T/Siemens make).
Supplying including installation, connection as approved by the Deptt., testing and commissioning of SUBMERSIBLE PUMP SET 3 (Three Phase) with steel cable rope and submersible cable complete as directed and specified by the deptt. Three phase Submersible motor pump set (Texmo/Crompton Greaves/ Aquatic /CRI/ V-Guar suitable for 100 mm bore well and above. 5 HP STAGE 14 to 50 with MCB controlled Submersible motor pump set control panel.
Preparation of site for placement of the drilling rig including excavation of mud pit, circulation drain, collection chamber etc. all complete as directed.
Movement of Rig from the Head Quarter to the drilling site including cost of P.O.L. all complete as directed.
Transportation of all ancillary equipments , camp materials, welding set, rig accessories etc. from Head Quarter to worksite to and from including cost of P.O.L. all complete as directed. (a) Upto 100.00 Km distance from H.Q.
Transportation of all materials like pipes, strainer, cone, socket, clamp, bentonite etc. from Head Quarter to worksite to and fro including cost of P.O.L. all complete as directed. (a) Upto 100.00 Km distance from H.Q
Transportation of air compressor from the Head Quarter to the drilling site with all accessories including cost of P.O.L. all complete as directed. (a) Upto 100.00 Km distance from H.Q.
Transportation of P.O.L. all complete as directed.
Construction of temporary accommodation and low cost sanitary facility for drilling staff including cost of camp materials viz, cots, tables, chairs, utensils, dresses, safety helmets etc. and dismantling the accommodation after completion of the work all complete as directed.
Providing water supply facilities at drilling site all complete as directed. (a) By installing 1 Nos. of Singur hand pump
Drilling of bore well by using drilling rig having ODEX system of boring by drilling size 114 mm to 170 mm
Lowering / sinking of well assembly including welding of pipe joints for 150 mm. dia. M.S. casing pipe, strainer all complete as directed.
Extraction of drilling pipes / bits against skin friction at the end of each day and after completion of the operation including washing of the bore hole all complete as directed. Day- one
Day- two
Day- three
Developing of the D.T.W. with air compressor, Make- Kirloskar / Cumins all complete as directed.
150 mm dia 8 mm thick MS pipe
150 mm dia 10 mm thick M.S Slotted strainer
ASHIRBAD HARDWARE
M/S FOREVER
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .