Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAdmitted-Finance VILL DAKSHIN HAZIPUR P O DIAMOND HARBOUR DIST SOUTH 24 PGS PIN 743331 | DIAMOND HARBOUR | SOUTH 24 PARGANAS | WEST BENGAL | 743331 | ₹11.7 L | L1 | Admitted-Finance |
| 2 | L2₹12.1 L+₹47,148 (4.04%)Admitted-Finance | ₹12.1 L+₹47,148 (4.04%) | L2 | Admitted-Finance |
| 3 | L3₹12.8 L+₹1.1 L (9.61%)Admitted-Finance 140 1 110 N S C BOSE ROAD REGENT PARK KOLKATA WEST BENGAL 700040 | KOLKATA | KOLKATA | WEST BENGAL | 700040 | ₹12.8 L+₹1.1 L (9.61%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SANKAR CONSTRUCTION L1 | R .D ENTERPRISES L2 | S S ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00 | Engagement of three (03) number skilled workers having
ability of fault- finding, minor repairing of electro-
mechanical system, water circuit and slurry discharge
arrangements for operation of Air Pollution Control
Device in three shifts (including damper & I.D fan
operation)
(As per Mpl. Secretary's Circular
No. 30 of 2025-26 dt. 09.03.2026). | 12 | Months | 48,666 ₹5,83,992 Lowest | 48,666 ₹5,83,992 Lowest | 48,666 ₹5,83,992 Lowest |
| 2.00 | Engagement of One (01) nos. Sweeper for sweeping
the entire Furnace and APC Device area and APC
Control room, Furnace Control room area. All
sweeping material supplied by the contractor
(As per Mpl. Secretary's Circular
No. 30 of 2025-26 dt. 09.03.2026). | 12 | Months | 12,969 ₹1,55,628 Lowest | 12,969 ₹1,55,628 Lowest | 12,969 ₹1,55,628 Lowest |
| 3.00 | Proportionate Casual Leave imposed
as per Mpl. Secretary's Circular
No.23 of 2012-13 dt.10.12.2012
vide the MIC Item No.M 39.7
dt.14.08.2012. adding the total
wages amount 4.53%. | 0.05 | Percentage | 7,39,620 ₹33,504.79 Lowest | 7,39,620 ₹33,504.79 Lowest | 7,39,620 ₹33,504.79 Lowest |
| 4.00 | Engagement of a Reliever for operators (Skilled
category) in the weekly off-Days (As per Mpl.
Secretary's Circular No. 30 of 2025-26 dt. 09.03.2026).
Total nos. of off-days for an operator in a year = 52 nos.
Total off -days for three (03) nos. operators
= (52 X 3) nos. = 156 nos.
Total working days for Relieve throughout year =
156 Days | 156 | Days | 624 ₹97,344 Lowest | 624 ₹97,344 Lowest | 624 ₹97,344 Lowest |
| 5.00 | Engagement of a Reliever for the Sweeper in the
weekly off-Days
(As per Mpl. Secretary's Circular
No. 30 of 2025-26 dt. 09.03.2026).
Total nos. of off-days for an One Sweeper in a year
= 52 nos.
Total working days for Reliever throughout year =
= (52 X 1) nos. = 52 nos. | 52 | Days | 500 ₹26,000 | 599 ₹31,148 | 499 ₹25,948 Lowest |
| 6.00 | Labour charges for monthly as per directed by EIC, removing the carbon and particle/sludge arrested by Ceramic Saddles (3000 Nos. per stage for two stages for total of 6000 Nos.) from the Precooler and cleaning of the same in two stages. Two nos. of stainless-steel strainer /net to be cleaned by way of high-pressure jet pump and by scrubbing hammer manually. (Precaution to be taken for fresh air circulation during cleaning inside) | 12 | Months | 6,000 ₹72,000 Lowest | 7,200 ₹86,400 | 8,500 ₹1,02,000 |
| 7.00 | Labour charges for monthly as per directed by EIC, opening the two doors of mist eliminator by unscrewing 60(sixty) nos. nut and bolt and drawing out two nos. strainer. Cleaning the strainers by using scrubbing hammer and high pressure jet pump. Strainers to be fitted in proper position inside Mist Eliminator and closing the two doors and fitting 60 nos. nut and bolts. | 12 | Months | 6,050 ₹72,600 Lowest | 6,350 ₹76,200 | 9,000 ₹1,08,000 |
| 8.00 | Labour charges for monthly as per directed by EIC, cleaning of Blower by opening the inlet hub and removing canvas cloth. The deposited carbon from inside the blower to be cleaned manually and by high-pressure jet pump. After cleaning the inlet hub to be refitted and canvas cloth to be re wrapped. | 12 | Months | 5,500 ₹66,000 Lowest | 6,000 ₹72,000 | 7,200 ₹86,400 |
| 9.00 | Labour charges for monthly as per directed by EIC, chimney door to be unscrewed and deposited carbon particles are to be manually removed from inside the Chimney Base and washed with water. Removed Carbon particles to be packed up in gunny bags and dropped at the departmental Vat. | 12 | Months | 5,000 ₹60,000 Lowest | 6,500 ₹78,000 | 7,200 ₹86,400 |
Tender Value
Refer Docs
EMD Value
₹21,700
Closing Date
11 Jul 2026, 5:00 pmClosed
Ex. Engineer(E), Lighting/Crematorium Deptt.
Office of the D.G. (E) LIGHTING DEPARTMENT Kolkata Municipal Corporation 5, SN Banerjee Road Kolkata-700 013 West Bengal
Annual Operation and Maintenance of Air Pollution Control Units connected with the Furnace No. 1 and 2 of the old complex at Sirity Burning Ghat
2026_KMC_1029651_1
KMC/LTG/OM/01/SBG/26-27
Open Tender
Miscellaneous Services
Item Rate
365 days
Sirity Burning Ghat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹21,700
4 Aug 2026
25 Jun 2026
13 Jul 2026
25 Jun 2026
11 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of three (03) number skilled workers having
ability of fault- finding, minor repairing of electro-
mechanical system, water circuit and slurry discharge
arrangements for operation of Air Pollution Control
Device in three shifts (including damper & I.D fan
operation)
(As per Mpl. Secretary's Circular
No. 30 of 2025-26 dt. 09.03.2026). | - | Months | 1.25 | - |
| 2 | Engagement of One (01) nos. Sweeper for sweeping
the entire Furnace and APC Device area and APC
Control room, Furnace Control room area. All
sweeping material supplied by the contractor
(As per Mpl. Secretary's Circular
No. 30 of 2025-26 dt. 09.03.2026). | - | Months | - | - |
| 3 | Proportionate Casual Leave imposed
as per Mpl. Secretary's Circular
No.23 of 2012-13 dt.10.12.2012
vide the MIC Item No.M 39.7
dt.14.08.2012. adding the total
wages amount 4.53%. | 0.2 | Percentage | 100 | ₹20 |
| 4 | Engagement of a Reliever for operators (Skilled
category) in the weekly off-Days (As per Mpl.
Secretary's Circular No. 30 of 2025-26 dt. 09.03.2026).
Total nos. of off-days for an operator in a year = 52 nos.
Total off -days for three (03) nos. operators
= (52 X 3) nos. = 156 nos.
Total working days for Relieve throughout year =
156 Days | - | Days | 53 | - |
| 5 | Engagement of a Reliever for the Sweeper in the
weekly off-Days
(As per Mpl. Secretary's Circular
No. 30 of 2025-26 dt. 09.03.2026).
Total nos. of off-days for an One Sweeper in a year
= 52 nos.
Total working days for Reliever throughout year =
= (52 X 1) nos. = 52 nos. | - | Days | 10 | - |
| 6 | Labour charges for monthly as per directed by EIC, removing the carbon and particle/sludge arrested by Ceramic Saddles (3000 Nos. per stage for two stages for total of 6000 Nos.) from the Precooler and cleaning of the same in two stages. Two nos. of stainless-steel strainer /net to be cleaned by way of high-pressure jet pump and by scrubbing hammer manually. (Precaution to be taken for fresh air circulation during cleaning inside) | - | Months | 11 | - |
| 7 | Labour charges for monthly as per directed by EIC, opening the two doors of mist eliminator by unscrewing 60(sixty) nos. nut and bolt and drawing out two nos. strainer. Cleaning the strainers by using scrubbing hammer and high pressure jet pump. Strainers to be fitted in proper position inside Mist Eliminator and closing the two doors and fitting 60 nos. nut and bolts. | - | Months | 10 | - |
| 8 | Labour charges for monthly as per directed by EIC, cleaning of Blower by opening the inlet hub and removing canvas cloth. The deposited carbon from inside the blower to be cleaned manually and by high-pressure jet pump. After cleaning the inlet hub to be refitted and canvas cloth to be re wrapped. | - | Months | 22 | - |
| 9 | Labour charges for monthly as per directed by EIC, chimney door to be unscrewed and deposited carbon particles are to be manually removed from inside the Chimney Base and washed with water. Removed Carbon particles to be packed up in gunny bags and dropped at the departmental Vat. | - | Months | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
form.pdf
Tender Documents • 0.76 MB
BOQ_2528680.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .