Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H3₹1.3 L−₹12,872.33 (8.01%)Accepted-AOC | H3 | Accepted-AOC Lowest One | |
| 2 | H1₹1.6 LRejected-AOC VILLAGE GUHAR MAJHWAR P O UPPER BHAMBLA TEHSIL BALDWARA DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | H1 | Rejected-AOC Not Lowest One | |
| 3 | H2₹1.5 L−₹10,340.10 (6.43%)Rejected-AOC HPSEBL THALOUT | H2 | Rejected-AOC Not Lowest One |
| Sl No | Description | Qty | Unit | Naresh Kumar H2 | Jai Singh Contractor and Suppliers H1 | Mahesh Kumar Gupta H3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation, trenches etc. in all kinds of soil such as pick work jumper work, blasting work in soft/hard rock, chiselling in soft/hard rock including wedging out upto all lift, stacking the excavated soil upto all lead clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as per direction and to the entire satisfaction of Engineer-in-Charge upto all lead and lifts. | 4.37 | Cum | 605 ₹2,643.85 | 615 ₹2,687.55 | 602.9 ₹2,634.67 Lowest |
| 2.00 | Providing and laying cement conrete 1 : 4 : 8 . ( 1 cement : 4 sand and : 8 grade stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth upto all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge. | 0.49 | Cum | 6,850 ₹3,356.5 | 6,890 ₹3,376.1 | 6,825.7 ₹3,344.59 Lowest |
| 3.00Providing and laying cement concrete work 1:2:4( 1 cement :2 sand :4 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:- | ||||||
| 3.01 | Foundation , footing , basis of column and the like and mass concrete | 0.52 | Cum | 8,710 ₹4,529.2 | 8,750 ₹4,550 | 8,702 ₹4,525.04 Lowest |
| 3.02 | Column. Pillar, Posts, struts, square, rectangular on polygonal in paln as per direction of Engineer-in-Charge upto all lead and lifts. | 1.78 | Cum | 10,200 ₹18,156 | 10,300 ₹18,334 | 10,154 ₹18,074.12 Lowest |
| 4.00Providing form work of steel shuttering with steel plat as3.15mm thich welded with angle iron in frame 30x30x5mm so as to fair finish including centring, shuttering floor two seiling not exceeding 4 mtrs. And removal of the same for insiturein forced conerete and plain concrete work in:- | ||||||
| 4.01 | Column. Pillar, Posts, struts, square, rectangular on polygonal in paln as per direction of Engineer-in-Charge upto all lead and lifts. | 36.32 | Sqm | 850 ₹30,872 | 900 ₹32,688 | 831 ₹30,181.92 Lowest |
| 4.02 | Providing Tor steel reinforcement for RCC work I/c bending ,binding and placing in position complete upto floor two level. | 826.2 | Kg | 110 ₹90,882 | 120 ₹99,144 | 107.9 ₹89,146.98 Lowest |
Tender Value
Refer Docs
EMD Value
₹2,980
Closing Date
10 Jul 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer JS Division Sarkaghat
Executive Engineer JS Division Sarkaghat
C O RCC Pillar
2025_HPIPH_109086_1
2550-2600 dt. 01.07.2025
Open Tender
Civil Works
Item Rate
90 days
Sarkaghat
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Executive Engineer JS Division Sarkaghat
₹2,980
4 Oct 2025
1 Jul 2025
11 Jul 2025
1 Jul 2025
10 Jul 2025
1 Jul 2025
Amount
Excavation in foundation, trenches etc. in all kinds of soil such as pick work jumper work, blasting work in soft/hard rock, chiselling in soft/hard rock including wedging out upto all lift, stacking the excavated soil upto all lead clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths, sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as per direction and to the entire satisfaction of Engineer-in-Charge upto all lead and lifts.
Providing and laying cement conrete 1 : 4 : 8 . ( 1 cement : 4 sand and : 8 grade stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth upto all leads and lifts as per the direction and to the entire satisfaction of Engineer-in-Charge.
Providing and laying cement concrete work 1:2:4( 1 cement :2 sand :4 graded stone agg. 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:-
Foundation , footing , basis of column and the like and mass concrete
Column. Pillar, Posts, struts, square, rectangular on polygonal in paln as per direction of Engineer-in-Charge upto all lead and lifts.
Providing form work of steel shuttering with steel plat as3.15mm thich welded with angle iron in frame 30x30x5mm so as to fair finish including centring, shuttering floor two seiling not exceeding 4 mtrs. And removal of the same for insiturein forced conerete and plain concrete work in:-
Column. Pillar, Posts, struts, square, rectangular on polygonal in paln as per direction of Engineer-in-Charge upto all lead and lifts.
Providing Tor steel reinforcement for RCC work I/c bending ,binding and placing in position complete upto floor two level.
Naresh Kumar (BID ID -533164)
Mahesh Kumar Gupta (BID ID -533134)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .