Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance 37 MOHAN VATIIKA ACHIEVERS HOME PUBLIC SCHOOL WALI GALI JAGJEETPUR KANKHAL HARIDWAR | HARIDWAR | HARIDWAR | UTTARAKHAND | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹2.9 L (1.47%)Admitted-Finance HARIDWAR | ₹2.0 Cr+₹2.9 L (1.47%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹5.2 L (2.63%)Admitted-Finance 232 RAJENDRA NAGAR STREET 7 KAULAGARH ROAD DEHRADUN | ₹2.0 Cr+₹5.2 L (2.63%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s S S ENTERPRISES L1 | Sagar Engineering Company L2 | P M ELECTRICAL COMPANY L3 |
|---|---|---|---|---|---|---|
| 1.00Material | ||||||
| 2.00 | Earth wire clamp for SP-55 with N&B | 40 | Nos. | 350 ₹14,000 Lowest | 360 ₹14,400 | 385 ₹15,400 |
| 3.00 | PP & clamp with N&B ST Pole SP-55 | 25 | Nos. | 290 ₹7,250 Lowest | 315 ₹7,875 | 332 ₹8,300 |
| 4.00 | Stay Clamp for SP-55 with nut & bolt | 15 | Nos. | 240 ₹3,600 Lowest | 255 ₹3,825 | 280 ₹4,200 |
| 5.00 | 11 kv IPC for covered to covered conductor | 174 | Nos. | 1,495 ₹2,60,130 Lowest | 1,525 ₹2,65,350 | 1,542 ₹2,68,308 |
| 6.00 | 11 kv IPC for covered to Bare conductor | 90 | Nos. | 1,690 ₹1,52,100 Lowest | 1,717 ₹1,54,530 | 1,730 ₹1,55,700 |
| 7.00 | 11 kv mid span jointing kit | 90 | Nos. | 2,570 ₹2,31,300 Lowest | 2,588 ₹2,32,920 | 2,600 ₹2,34,000 |
| 8.00 | IPC with Al bail for earthing | 180 | Nos. | 7,870 ₹14,16,600 Lowest | 7,880 ₹14,18,400 | 7,910 ₹14,23,800 |
| 9.00 | 11 KV Suspension Ties/Cable Ties | 800 | Nos. | 2,388 ₹19,10,400 Lowest | 2,414 ₹19,31,200 | 2,435 ₹19,48,000 |
| 10.00 | 11 KV Composite Poly. Disc Insulator 70 KN | 85 | Nos. | 595 ₹50,575 Lowest | 612 ₹52,020 | 630 ₹53,550 |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
29 Jun 2026, 12:00 pmClosed
SE EDC Srinagar Garhwal
SE EDC Srinagar Garhwal
Replacement of existing 11 KV ACSR conductor with 11 KV AAAC, AL-59, 99 sq.mm covered conductor from Dhruvpur to Padampur under EDD Kotdwar on semi-Turnkey Basis
2026_UPCL4_96786_1
Tender no. 14/EDC(s)/2025-26
Open Tender
Electrical Works
Turn-key
180 days
Srinagar
Replacement of existing 11
KV ACSR conductor with 11
KV AAAC, AL-59, 99 sq.mm
covered conductor from
Dhruvpur to Padampur
under EDD Kotdwar on
semi-Turnkey Basis
3 documents required · 3 mandatory
₹11,800
EE ETD Srinagar Garhwal
₹4.0 L
2 Jul 2026
18 Jun 2026
30 Jun 2026
18 Jun 2026
29 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material | - | - | - | - |
| 2 | Earth wire clamp for SP-55 with N&B | 40 | Nos. | 104 | ₹4,160 |
| 3 | PP & clamp with N&B ST Pole SP-55 | 25 | Nos. | 105 | ₹2,625 |
| 4 | Stay Clamp for SP-55 with nut & bolt | 15 | Nos. | 106 | ₹1,590 |
| 5 | 11 kv IPC for covered to covered conductor | 174 | Nos. | 107 | ₹18,618 |
| 6 | 11 kv IPC for covered to Bare conductor | 90 | Nos. | 108 | ₹9,720 |
| 7 | 11 kv mid span jointing kit | 90 | Nos. | 109 | ₹9,810 |
| 8 | IPC with Al bail for earthing | 180 | Nos. | 110 | ₹19,800 |
| 9 | 11 KV Suspension Ties/Cable Ties | 800 | Nos. | 111 | ₹88,800 |
| 10 | 11 KV Composite Poly. Disc Insulator 70 KN | 85 | Nos. | 112 | ₹9,520 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.16 MB
PQR14.pdf
Tender Documents • 0.51 MB
Tenderdocuments14.pdf
Tender Documents • 1.15 MB
BOQ_114331.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .