Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 Cr+₹5.1 L (3.86%)Rejected-AOC | ₹1.4 Cr+₹5.1 L (3.86%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Velayudhan M L2 | Mountcarve Projects LLP L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF CLASSROOM BUILDING | |||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 10.91 | cum | 1,894 ₹20,659.75 | 420 ₹4,581.36 Lowest |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 3.46 | cum | 3,267 ₹11,290.75 | 1,050 ₹3,628.8 Lowest |
| 1.00 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 31.9 | sqm | 151 ₹4,816.9 Lowest | 177 ₹5,646.3 |
| 1.00 | 15.18:Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates,bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 198 | kg | 4.45 ₹881.1 Lowest | 6 ₹1,188 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 176.96 | cum | 228 ₹40,346.88 Lowest | 240 ₹42,470.4 |
| 1.01 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 16.2 | cum | 319 ₹5,167.8 Lowest | 330 ₹5,346 |
| 1.01 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 5.6 | cum | 116 ₹649.6 | 87 ₹487.2 Lowest |
| 1.01 | OD269474/2024-2025:Dry rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement :6 Coarse Sand:12 graded stone aggregate 20mm nominal size) including cost of bond stone and through stone | 101.92 | cum | 4,280 ₹4,36,217.6 | 3,570 ₹3,63,854.4 Lowest |
| 1.01 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 88.18 | cum | 7,425 ₹6,54,751.35 | 7,080 ₹6,24,328.56 Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹50,000
Closing Date
24 Sept 2025, 11:30 amClosed
Superintending Engineer
O/O Superintending Engineer,PWD Buildings Thrissur
GENERAL BUDGET WORK 2024 25 CONSTRUCTION OF CLASSROOM BLOCK FOR G.M.L.P SCHOOL ANDATHODE IN PUNNAYOORKULAM GRAMAPANCHAYATH FIRST FLOOR Work General Civil Work 1
2025_PWD_796820_1
PWD/BLDG/TR/2849/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
365 days
Andathodu
Please refer Tender documents.
12 documents required · 12 mandatory
₹6,508
Yes
₹50,000
Yes
3 Nov 2025
12 Sept 2025
26 Sept 2025
12 Sept 2025
24 Sept 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .