Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.1 Laccepted-aoc | ₹6.1 L | accepted-aoc |
Tender Value
₹7.9 L
EMD Value
₹8,000
Closing Date
18 Aug 2026, 3:30 pmClosed
EE OFFICE - CHITOOR
Chitoor
Maintaining of State Highway Roads in the Jurisdiction of (R&B) Section, Chittoor for the year 2026-27
971501
NIT No.24/EE(R&B) CTR/TO/2026-27, Dt:13.07.2026
OPEN - NCB
Road Work
CHITTOOR, ANDHRA PRADESH
9 documents required · 9 mandatory
₹281
₹8,000
12 Sept 2026
3 Aug 2026
3 Aug 2026
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers by manually in base courses on well prepared surface and compacting with power roller8/10 ton to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.
Providing B.T. patch work for pot holes of depth ranging from 50 to 70 mm, using 40 to 45mm IRC HBG metal with required quantity of 9.50-11.20mm size IRC HBG key chips and 42 Kgs of 80/100 grade bitumen per one cum of work for filling the pot holes including removal of loose material in the pot holes trimming the edges to provide firm vertical faces cleaning applying tack coat filling the pot holes compacting with 8-10T power road roller to achieve the desired compaction and finishing including sand flushing cost and conveyance of coarse aggregate to site of work including cost and conveyance of 80/100 grade bitumen (Including wastage) to work site and all operational charges of all T&P cost of diversion traffic, providing caution boards etc., complete as directed by the departmental officers in the following reaches as per MoRT&H Specification 3004
Providing B.T. patch work for pot holes of depth ranging from 20 to 25 mm using 9.50-11.20mm size IRC HBG key chips and 80/100 grade bitumen at 72 Kgs / 1 cum of work for filling the pot holes including removal of loose material in the pot holes, trimming the edges to provide form vertical faces, cleaning, applying tack coat, filling the pot holes compacting with 8-10T power road roller to achieve the desired compaction and finishing including sand flusing cost and conveyance of coarse aggregate to site of work including cost and conveyance of 80/100 grade bitumen (Including wastage) to work site and all operational charges of all T&P cost of diversion traffic, providing caution boards etc., complete as directed by the departmental officers in the following reaches as per MoRT&H Specification 3004
Clearing heavy jungle from the road side including all labour charges for removing cutting and burning in to ashes etc., complete as directed by the departmental officers during execution of work
Making up of loss of materals/irregularities on shoulders to the design level by adding fresh approved soil and compacting with appropriate equipments etc., complete
Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., complete for finished item of work as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
~$131.xlsx
TENDER_DOCUMENT • 0.00 MB
~$134.xlsx
TENDER_DOCUMENT • 0.00 MB
~$21.xlsx
TENDER_DOCUMENT • 0.00 MB
~$YELLO SHEET-134.xlsx
TENDER_DOCUMENT • 0.00 MB
24.xlsx
TENDER_DOCUMENT • 0.03 MB
DTS 24.doc
TENDER_DOCUMENT • 1.02 MB
NIT-24.pdf
TENDER_DOCUMENT • 1.21 MB
YELLO SHEET-24.xlsx
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .