Tender Value
₹22.0 L
EMD Value
₹55,100
Closing Date
26 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Divisional Engineer-(Elec-I), Tirupati
tpty
Hire charges for arranging electrical illuminations in Friday garden, Asthanamandapam, tholappa garden and Gantasala circle to Pudi road etc., and providing scaffolding for road arches, ornamental designs and lighting cutouts etc., during the Sri PAT Brahmotsavams for the year 2026-27.(Part-A: Hire charges)
1000123
226/DE(Elec.)-I/TTD/TPT/2026-27
OPEN - NCB
Electrical Works
TIRUPATHI
7 documents required · 7 mandatory
₹781
₹55,100
9 Oct 2026
9 Oct 2026
9 Oct 2026
PART-A (Electrical illumination )
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclussive of transportation, erection, testing and removing charges etc) - For Ten days. Note:- 1) The 6.2 V Bamboo stick designs of different dieties, Arches & designs etc., where ever necessary are to be arranged the deties, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required. 2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Design boards of different deities / designs etc, as directed during execution with different colours & Lights to operate at 230V, Single phase supply. The boards should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connections. (Note: The rate should inclusive of transportation, erection and removing charges) - For Ten days Note:- 1) The specified designs board should have made with painting on the front side so that in day times, the design is appears as painting board, and in night times the replica of design is to be appear with colour LEDs so as to lit the natural colour of the deity / design. 2) The LED's are to be arranged to the board with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS. 3) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 4) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of 12’ to 25’ insulated iron / insulated GI pipe / wooden post for fixing of LED thoranams / MH fittings / LED fittings / Halozen fittings etc, as directed during execution. Per programe maximum upto ten days. Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Figures wherever necessary as directed during execution including providing necessary struts, ties, bracings etc, from bottom to 10 meter. Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places, 2. Erection should be completed before Two days of commencement of the Festival / Utsavam. 3. The TTD has not responsible for theft and fire accident. 4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates. 5. The measurements shall be given for the front view of the scaffoldings. 6. 10% extra will be paid for 4-mada streets at Tirumala. 7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs) 8. The above rates are excluding GST.
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Road Arches wherever necessary as directed during execution including providing necessary struts, ties, bracings etc. for single side arch Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places, 2. Erection should be completed before Two days of commencement of the Festival / Utsavam. 3. The TTD has not responsible for theft and fire accident. 4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates. 5. The measurements shall be given for the front view of the scaffoldings. 6. 10% extra will be paid for 4-mada streets at Tirumala. 7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs) 8. The above rates are excluding GST.
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Road Arches wherever necessary as directed during execution including providing necessary struts, ties, bracings etc. for double side arch Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places, 2. Erection should be completed before Two days of commencement of the Festival / Utsavam. 3. The TTD has not responsible for theft and fire accident. 4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates. 5. The measurements shall be given for the front view of the scaffoldings. 6. 10% extra will be paid for 4-mada streets at Tirumala. 7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs) 8. The above rates are excluding GST.
Hire charges for temporary illumination, consisting of 54W LED RGB Parcan light fitting non integral weather proof die cast alluminium housing with IP66 protection wih control gear box, control gear with required cables, holder, mains duly erected with required scaffolding and dismantled on existing poles including cost and conveyance of all materials and labour charges etc., complete. For Ten days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of LED, RGB PIXEL series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., complete. (The work includes drawing of GI wire for tightening of the sets) - For Ten days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal. (Note: The rate should inclusive of transportation, erection and removing charges) - For Ten days Note: - 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.For Ten days. Note:- 1) Erection a nd Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.For Ten days Note:- 1) Erection a nd Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 2 of 2.5 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm PVC insulated sheathed Aluminium / copper wire, PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.For Ten days . Note:- 1) Erection a nd Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 4 of 2 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm / 16sq.mm PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.For Ten days.Note:- 1) Erection a nd Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supplying and running circuit service mains with 4 of 7/16 PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.For Ten days.Note:- 1) Erection a nd Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying wiring and maintaining suitable size LT panel board with pilot lamp arrangements and the following switches wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. i) 100/200 Amps TPST / TPIC switch with pilot lamp and neutral.For Ten days. Note:- 1) Erection a nd Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring and 62.5 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day. Note:- 1) Total No. of Generators = 1 No. / day and for 10 days = 1 x 10 days = 10 Nos. 2) Erection a nd Testing should be completed before one day of the Festival / Utsavam etc., begins. 3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring and 125 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day. Note:- 1) Total No. of Generators = 2 Nos. / day and for 10 days = 2 x 10 days = 20 Nos. 2) Erection a nd Testing should be completed before one day of the Festival / Utsavam etc., begins. 3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring and 250 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day Note:- 1) Total No. of Generators = 1 No. / day and for 10 days = 1 x 10 days = 10 Nos. 2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of Four pole Towers for erection of electrical illumination of MH fittings / Halozen fittings wherever necessary as directed during execution including providing necessary channels, bracings and necessary watch and ward against fire accidents. Per program maximum of Ten days.Note:- 1) Erection a nd Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Transportation charges for DG set of 62.5 KVA to 125 KVA to the site including loading and unloading charges. The distance for transportation is to be accounted from the place of hiring to the workspot.
Supply, Transportation of Diesel oil for D.G Set
Temporary illumination at Asthanamandapam
Hire charges for Supply, Fixing, Wiring, Servicing, Operation & Maintaining of LED RGB Wall Wash par light Fitting with all accessories including suitable wire, Suitable brackets, and controls units wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. Note:- All the LED wall washers must be placed such that the entire wall must have one colour at a time. Minimum 4 colours must be used. The Colour change of all fixtures has to be take up at a time with/without time delay. All the change of colour must be connected to mixer which is of software control. The software must able to change the colour from one to other in slow manner. The above work includes software, plugs, wire etc., so that no bear conductor seen.
Hire charges for the following items for providing stage lighting in Asthanamandapam on Occasion of Sri PAT Brahmotsavams at Tiruchanoor.
1000 watts Halogen fittings
PARCANS 1000 watt
Smoke machine with liquids
Labour ( Supply of operator )
Hire charges for Supply, Fixing, Wiring, Servicing, Operation & Maintaining of following stage lighting systems with all accessories including suitable wire, Suitable brackets, and controls units wherever necessary as directed during execution and removal after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.
60' X 40' Truss 4 sides of the stage made up of M.S pipes having self support so that the LED's can mount on top of the Truss, the bottom of the truss is to have self sustain capacity to bear the load of lamp fixtures. For One days
Transportation of par light Fitting, City colour lighting, 60/40 Truss, dimmer pack & Master pilot boards loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.
Hire charges for supplying, fixing, wiring, servicing and maintaining Jumbo Air cooler Heavy duty with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For One day Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining Air Conditioner split / tower model type with necessary copper pipes, gas charging, wire / cable connections, controls etc., as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed - For one day (Per TR) Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ 226.xlsx
TENDER_DOCUMENT • 0.09 MB
226.doc
TENDER_DOCUMENT • 2.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .