| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹13.9 LAccepted-AOC 261 1508 TRISHULLA NILAKANTHA NAGAR KUNHEIPARA CUTTACK DIST GHAZIPUR PIN 754005 | CUTTACK | CUTTACK | ODISHA | 754005 | ₹13.9 L Quoted ₹11.8 L | L-1 | Accepted-AOC BEING L-1 BIDDER |
| 2 | -2₹14.0 LRejected-Finance PLOT NO 1123 320 KN 312 HEMGIR DIST SUNDERGARH PIN 770076 | HEMGIR | SUNDERGARH | ODISHA | 770076 | ₹14.0 L | -2 | Rejected-Finance NOT BEING L-1 BIDDER |
| 3 | L-3₹16.0 L+₹4.2 L (35.3%)Rejected-Finance AT PO G TUMULIA DIST SUNDERGARH ORISSA PIN 770024 | G TUMULIA | SUNDERGARH | ORISSA | 770024 | ₹16.0 L+₹4.2 L (35.3%) | L-3 | Rejected-Finance NOT BEING L-1 BIDDER |
Tender Value
₹22.4 L
EMD Value
₹28,100
Closing Date
25 May 2026, 5:00 pmClosed
PROJECT ENGINEER CIVIL GARJANBAHAL OCP BASUNDHARAP
PROJECT OFFICER PO OFFICE, GARJANBAHAL OCP, BASUND
Heightening of existing Weighbridge no 08 AND repairing of different weighbridges porta cabin rooms under Garjanbahal OCP Under Basundhara Area
2026_MCL_359489_1
MCL/BA/PO/GOCP/Civil/E-Tender/ 26-27/08 dtd 12/05/2026
Open Tender
Civil Works - Roads
Percentage
30 days
PROJECT OFFICER PO OFFICE, GARJANBAHAL OCP, BASUND
AS PER NIT
3 documents required · 3 mandatory
₹28,100
15 Jun 2026
13 May 2026
26 May 2026
13 May 2026
25 May 2026
13 May 2026
13 May 2026 - 18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 5.76 | cum | 217 | ₹1,249.92 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 38.08 | cum | 910.15 | ₹34,658.51 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 38.08 | cum | 5,219.9 | ₹1,98,773.79 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 92.77 | cum | 7,009.05 | ₹6,50,229.57 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars kilogram | 7,421.6 | kg | 101.4 | ₹7,52,550.24 |
| 6 | "Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
" | 80 | sqm | 587.6 | ₹47,008 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete | 8.4 | sqm | 283.1 | ₹2,378.04 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 23.04 | sqm | 675.8 | ₹15,570.43 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each eposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 1.92 | cum | 115.2 | ₹221.18 |
| 10 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 259.75 | kg | 124 | ₹32,209 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tendernotice_2.pdf
PDF • 2.36 MB
Tendernotice_3.pdf
PDF • 1.53 MB
BOQ_372357.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .