Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.7 Cr Construction of 17 Nos. Forward BOPs(14 Nos. Company Level and 3 Nos. BOps Platoon Level) in the state of Tripura for Border Security Force along Indo-Bangladesh Border. SH: 2 Nos. Company level BOP at Sabda Kumar para and Wansa Para including internal Electrification, installation i/c compound lights & service connection to Buildings.(Package-V)(Re-call) | Construction of 17 Nos. Forward BOPs(14 Nos. Company Level and 3 Nos. BOps Platoon Level) in the state of Tripura for Border Security Force along Indo-Bangladesh Border. SH: 2 Nos. Company level BOP at Sabda Kumar para and Wansa Para including internal Electrification, installation i/c compound lights & service connection to Buildings.(Package-V)(Re-call) | ₹18.7 Cr | L1 | - |
| 2 | L2₹18.9 CrFinancial bid opened Construction of 17 Nos. Forward BOPs(14 Nos. Company Level and 3 Nos. BOps Platoon Level) in the state of Tripura for Border Security Force along Indo-Bangladesh Border. SH: 2 Nos. Company level BOP at Sabda Kumar para and Wansa Para including internal Electrification, installation i/c compound lights & service connection to Buildings.(Package-V)(Re-call) | Construction of 17 Nos. Forward BOPs(14 Nos. Company Level and 3 Nos. BOps Platoon Level) in the state of Tripura for Border Security Force along Indo-Bangladesh Border. SH: 2 Nos. Company level BOP at Sabda Kumar para and Wansa Para including internal Electrification, installation i/c compound lights & service connection to Buildings.(Package-V)(Re-call) | ₹18.9 Cr | L2 | Financial bid opened |
| 3 | - | - | - | - | |
| 4 | - | - | - | - |
| Sl No | Description | Qty | Unit | Dilip Ghosh L2 | M/S KISHORE ROY L1 |
|---|---|---|---|---|---|
| 1 | As per Total Schedule of Quantity(Civil Component) | - | - | 8.2 ₹17.0 Cr | 7.02 ₹16.8 Cr |
| 2 | As per Total Schedule of Quantity(Electrical Component) | - | - | 8.2 ₹1.9 Cr | 7.02 ₹1.9 Cr |
Tender Value
₹17.4 Cr
EMD Value
₹27.4 L
Closing Date
22 Sept 2022, 3:00 pmClosed
AE(C)-3
Om Prakash Agrawal
9818760544
O/O THE EXECUTIVE ENGINEER, BORDER FENCING DIVISION-III
Construction of 17 Nos. Forward BOPs(14 Nos. Company Level and 3 Nos. BOps Platoon Level) in the state of Tripura for Border Security Force along Indo-Bangladesh Border. SH: 2 Nos. Company level BOP at Sabda Kumar para and Wansa Para including internal Electrification, installation i/c compound lights & service connection to Buildings.(Package-V)(Re-call)
18260
07/NIT/CE/SE/EE/BFD-III/AGT/2022-23
OPEN
Civil Works - Buildings
540 days
West Tripura, Tripura
7 documents required · 7 mandatory
₹27.4 L
Not Applicable
6 Sept 2022
6 Sept 2022
22 Sept 2022
22 Sept 2022
22 Sept 2022
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NIT+07+PACKAGE05recall.pdf
document • 19.37 MB
Download all tender documents and submit your bid