| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 CrAccepted-AOC | ₹11.4 Cr Quoted ₹11.7 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹12.0 CrRejected-Finance UNIT NO 17 GROUND FLOOR RECTANGLE 1 DISTRICT CENTRE SAKET NEW DELHI 110017 | NEW DELHI | SOUTH DELHI | DELHI | 110017 | ₹12.0 Cr | L2 | Rejected-Finance Rejected |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 4 | Rejected-Technical MUMBAI MUMBAI MAHARASHTRA 400067 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | V N ENGINEERING COMPANY L2 | Insituform Pipeline Rehabilitation Pvt Ltd L1 |
|---|---|---|---|---|---|
| 1.00Non Schedule Items | |||||
| 1.01 | (A) Desilting of existing sewer by installation of adequate number of over – pumping system, prov. And laying temporary rising main from upstream sides of working length for the smooth flow/ bye-pass of the sewerage system to avoid flood in the adjoining area, desilting of sewer line with mechanical device like Super Sucker Machine, taking out rubbish debris, silt etc. including leak proof stacking arrangement as per technical specification and its safe disposal with in municipal limits as directed by the Engineer in Charge. Scope of work includes supply of all material, labour, tools and plants, making diversion of traffic during execution, repair/ renovation of existing sewer manhole, repair of existing damaged sewer line, temporary power connection with stand by generator set of sufficient capacity, Gas Detector, Forced Air Ventilators etc. and provision of safety equipment’s as guidelines laid in IS - 11972 (1987)/ international standards, Traffic Control Arrangements and proper lighting at night, barricading, display of sign boards, insurance of work men, cleaning of site, disposal of surplus earth/ Malba as directed by Engineer-in-Charge, Removal of all hindrances/obstructions and other unforeseen items. (B) Designing, manufacture of suitable type of liner (CIPP liner) and its installation, dewatering , washing with clear water/ suitable chemical, preparation of surface including dismantling of plaster wherever required, repair of brick work including stabilizations of earth near alignment of existing sewer where repairing work to be carried out as required as per site condition wherever necessary as per standard specification. Grouting with adequate pressure including raising of Manholes along with PVC footrest as per relevant ISI Specification inclusive of supply of material, labour, tools and plants and after completion repair/ strengthening of existing sewer line, the inspection should be carried out through CCTV ( Camera) by the agency to the satisfaction of Engineer in charge
900 mm x 1360 mm | 1,310 | Per Metre | 91,800 ₹12.0 Cr | 88,936.94 ₹11.7 Cr |
Tender Value
₹12.0 Cr
EMD Value
₹24.1 L
Closing Date
25 Aug 2025, 3:00 pmClosed
DINESH GABA
Yamuna Nagar PHED No.2
Strengthening, remodeling and CIPPp of existing brick sewer of size 900mm x 1360 mm from ( node 11-14 , 4-5 and 5-6) at Yamuna Nagar Town and all other works contingent thereto
2025_HRY_462910_1
20256FD04DE9 2415 4581 A292 4A5B9A3BE5F9548PUH
Open Tender
Civil Works
740 days
Yamunanagar
3 documents required · 3 mandatory
₹20,000
₹24.1 L
Yes
Yamuna Nagar
11 Nov 2025
4 Aug 2025
25 Aug 2025
4 Aug 2025
25 Aug 2025
4 Aug 2025
19 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid