| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAccepted-AOC | L1 | Accepted-AOC Agmt exe |
| Sl No | Description | Qty | Unit | ANVER SADIQUE P C L1 |
|---|---|---|---|---|
| 1.00Well Construction | ||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 111.27 | cum | 236.63 ₹26,330.77 Lowest |
| 1.00 | OD499336/2025-2026:Extra for open well excavation for all class of soil for first depth | 23.84 | cum | 240.68 ₹5,738.77 Lowest |
| 1.00 | OD499337/2025-2026:Extra for open well excavation in all class of soil for second depth. | 23.84 | cum | 361 ₹8,607.68 Lowest |
| 1.00 | OD499335/2025-2026:Extra for open well excavation in all class of soil for third depth | 7.95 | cum | 481 ₹3,822.99 Lowest |
| 1.00 | OD500083/2025-2026:Sinking well in all soils other than rock to lines and levels and plumb by scooping out from
inside and below the stiening including the use of dredgers or any other appliance,hire and
labour for kentledge,jetting,dewatering,blasting,vibrating or any other method including
removal of obstacles and dumping the soil within a distance of 150m-Well 4.00m to 5.50m
outer dia-1st depth upto 3m below spring level(Std PWD Data 1965 SI NO701 | 2 | metre | 30,191 ₹60,382 Lowest |
| 1.01 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | 32.82 | cum | 8,500 ₹2,78,970 Lowest |
| 1.01 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 240.35 | sqm | 283 ₹68,019.9 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 2,138.32 | kilogram | 103 ₹2,20,246.96 Lowest |
| 1.01 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 8.86 | cum | 7,489 ₹66,360.03 Lowest |
Tender Value
₹12.7 L
EMD Value
₹31,779
Closing Date
3 Jun 2026, 6:00 pmClosed
Assistant Engineer
O/O AE, LSGD, KODUVALLY MUNCIPALITY
Please refer Tender documents.
2026_LSGD_844194_2
KDLYMCP/LSGD/AE/ET12(10)/25-26
Open Tender
Civil Works - Others
Item Rate
270 days
KODUVALLY
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹31,779
Yes
16 Jul 2026
25 May 2026
4 Jun 2026
25 May 2026
3 Jun 2026
25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Well Construction | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.6 | cum | - | - |
| 1.002 | OD499336/2025-2026:Extra for open well excavation for all class of soil for first depth | - | cum | - | - |
| 1.003 | OD499337/2025-2026:Extra for open well excavation in all class of soil for second depth. | - | cum | - | - |
| 1.004 | OD499335/2025-2026:Extra for open well excavation in all class of soil for third depth | - | cum | - | - |
| 1.005 | OD500083/2025-2026:Sinking well in all soils other than rock to lines and levels and plumb by scooping out from
inside and below the stiening including the use of dredgers or any other appliance,hire and
labour for kentledge,jetting,dewatering,blasting,vibrating or any other method including
removal of obstacles and dumping the soil within a distance of 150m-Well 4.00m to 5.50m
outer dia-1st depth upto 3m below spring level(Std PWD Data 1965 SI NO701 | - | metre | - | - |
| 1.006 | 5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) derived from natural
sources derived from natural
sources: 3 graded stone aggregate 20 mm nominal size derived from natural
sources derived from natural
sources) | - | cum | - | - |
| 1.007 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 0.2 | sqm | - | - |
| 1.008 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.009 | 50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1440613.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
viewsbd.pdf
Tender Documents • 1.82 MB
viewnit.pdf
Other Document • 0.03 MB
BOQ_1440613.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .