Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
12 Sept 2020, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
LT CDR SUMIT MODI
THE OFFICER-IN-CHARGE FTSU (CHN) C/O NAVY OFFICE CHENNAI 600009
RECTIFICATION OF DEFECT ONBOARD INS CARNICOBAR (AMP PACKAGE)
2020_NAVY_374806_1
FTSU/AMP/CARNICOBAR/20-21
Limited
Miscellaneous Services
Works
30 days
INS CARNICOBAR
ACCEPTANCE OF SCOPE OF WORK , EMD, BID VALIDITY AS PER TE
3 documents required · 3 mandatory
₹0
Exempted
FTSU (CHN)
14 Sept 2020
4 Sept 2020
14 Sept 2020
4 Sept 2020
12 Sept 2020
7 Sept 2020
4 Sept 2020 - 7 Sept 2020
7 Sept 2020
90 days
5000 hrly routine on AC plant no 1 & 2 as per maintop . Following calibration to be done (i) Integrated Check Valve(QTY 02) (ii) Oil Solenoid Valve(Qty 02) (iii) Oil Flow Switch (Qty 02) (iv) Check the compressor performance and shaft seal (Qty 2) (v) Renew oil filter (Qty 02)
Overhauling of freshwater pump , Capacity -05 TPH
Manufacturing of followings as per sample:- (i) Corrosion plug & adaptors (Qty 15 nos) (ii) Union and adaptor (Qty 10 nos) (iii) Gear wire braded hoses (Qty 20 nos) (iv) System pipe clamps (Qty 15 nos)
Renewal of hot lagging of the following:- (i) Port DA (Qty 3sqm) (ii) Stbd DA (Qty 3sqm) (iii) EDA (Qty 3 sqm) (iv) Centre Main Engine (Qty 15 sqm)
Repair/Repair of following SW system pipes:- (i) Bilge educator system , Length-10mtr, Dia 80mm (Qty 1 nos) II) RO Plant flexible hose with coupling to renewed (Qty 01 Job) (iii) OWS Plant, Length -03 mtr, Dia 40mm (Qty 01 Job) (iv) Bilge Pump, Length-03mtr, Dia-80mm (Qty 1 Job)
Calibration of the following:- (i) HP AC safety valve (Qty 03 nos) (ii) HP AC Pressure switch (Qty 01 nos) (iii) Port DA LO pressure switch (Qty 01 nos) (iv) Port & centre DA SW pressure switch (Qty 02 Nos) (v) RO Plant TDS meter (Qty 1 nos)
Welding/ Repair of sea water injection piece stbd DA view sea water leak
Overhauling of LO hand pump of ME and DA
Renewal of Cold lagging of AC plant gas system
Sea water leakage observed from exhaust flap centre main engine. Suspect flap sitting gasket damage . Following to be done:- (i) Renewal of gasket (Qty 01 nos) (ii) Overhauking of flap and arresting of leakage (Qty 01 Nos)
FOUNDATION SUPPORTING BRACKET OF ANCHOR CAPSTAN THINNED/ DETERIORATED TO BE RENEWED IN SITU. MAT-MS
FOUNDATION SUPPORTING BRACKET OF CRN-91 CORRODED/ BROKEN TO BE RENEWED IN SITU. MAT-MS.
SECURING BRACKET OF ROPE REEL AT FOXLE AND Q/DECK DETERIORATED /BROKEN TO BE RENEWED/ WELDED IN SITU. MAT-MS.
SECURING SHOES OF GUARD RAIL STANCHION CORRODED/ BROKEN TO BE MANUFACTURED AND WELDED IN SITU. MAT-MS.
SPRING ASSISTED MECHANISM OF BOSUN STORE AND GER HATCH NOT WORKING, SPRING TO BE REPLACED. POST REPLACEMENT MECHANISM TO BE PROVED.
HATCH RETAINING MECHANISM OF W/T HATCHES JAMMED/ BROKEN TO BE RENEWED/ EASED.
SECURING BRACKET OF JACK STAFF AT FOXLE CORRODED TO BE RENEWED
VERTICAL ROLLER AT FOXLE BENT/ JAMMED TO BE RENEWED/EASED
WATER SPURN BEADING AT FOXLE CORRODED/THINNED TO BE RENEWED MAT-MS
SECURING BRACKET OF UPPER DECK DRAINAGE PIPE LINE CORRODED/BROKEN TO BE MANUFACTURED/ WELDED
PVC GUARD RAIL SECURING EYES AT BULWARK CORRODED/ BROKEN/ THINNED
LOCKING PLATE OF FAIR LEAD BROKEN/ CORRODED TO BE RENEWED
FOUNDATION SUPPORTING BRACKET OF BOAT DAVIT CORRODED TO BE RENEWED IN SITU. MAT-MS
METAL COAMING OF VENT FLAP CORRODED /THINNED TO BE RENEWED
IMO PIPE LINE WITH FLANGE AT PORT CATWALK THINNED/BROKEN TO BE RENEWED. MAT 25 MM GI PIPE
SERVICEABILITY CHECKS OF WELDING MACHINE TO BE CARRIED OUT
SECURING BRACKET OF PORTABLE EXTINGUISHERS IN SCATTERED LOCATIONS UPROOTED/ BROKEN TO BE REPAIRED/RENEWED.
SECURING BRACKET OF SUBMERSIBLE PUMP BROKEN TO BE REPAIRED/ RENEWED.
ROLLER SUPPORTING BRACKET AND RODE OF GANGWAY BROKEN/UPROOTED TO BE RENEWED IN SITU MAT- AL
SECURING ROD OF FER VENTILATION FLAPS UPROOTED/ BROKEN TO BE REPAIRED/ RENEWED.
SECURING LATCHES/ HINGES OF UPPER DECK LOCKERS CORREDED/ BROKEN T BE REPAIRED/RENEWED
WIRE MESH OF FER & AER EXHAUSTS BROKEN TO BE REPAIRED/ RENEWED
SECURING CLIP OF HATCH CORREDED/ BROKEN TO BE RENEWED IN SITU.
GUARDRAIL STANCHION AT FOXLE CORRODED/ BROKEN TO BE REPAIRED/ RENEWED
SIGNAL PROJECTOR BASEMENT CORRODED/ BROKEN TO BE REPAIRED/ RENEWED
SECURING BRACKET OF LOCKERS BROKEN TO BE REPAIRED/ RENEWED
LMG STAND CORRODED/ BROKEN. TO BE RENEWED/ MANUFACTURED IN SITU. MAT- MS
FREQUENT FAILURE/ BURING OF LEVEL DETECTOR CARD IN OWS PANEL/ SUSPECT CIRCUIT MALFUNCTIONING
SERVICEABILITY CHECKS /CALIBRATION OF FOLLWING METERS TO BE CARRIED OUT:- (i) VOLTMETER (QTY 11 NOS) (II) AMMETER (QTY 04 NOS) (III) FREQUENCY METER (QTY 05 NOS) (IV) POWER FACTOR METER (QTY 03 NOS) (V) KILOWATT METER (QTY 03 NOS) (VI) DOUBLE VOLTMETER (QTY 01 NOS) (VII) SYNCHROSCOPE METER (QTY 01 NOS) (VIII) INSULATION METER (QTY 01 NOS)
LOAD IN BALANCE FREQUENT FLUCTATION AND VOLTAGE FLUCTATION OBSERVED DURING PARALLELING OPERATION OF PORT DA WITH STBD DA AND CENTRE DA. SUSPECT ISSUES IN DROOP SETTING. ASSISTANCE REQUIRED FOR DROOP SETTING AND LOAD TRIALS.
RAREFIELD ENGINEERS PVT LTD
UNITED COMPONENT AND SERVICES
G V MARINE TECHNIKCAL
MSM ENGINEERING
A Kay Marine Services
MAK TECHNICAL SERVICES
KOMAL INDUSTRIES
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .