| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | L1 | Accepted-AOC agreement executed | |
| 2 | L2₹3.4 L+₹19,237.74 (6.06%)Rejected-Finance | L2 | Rejected-Finance second lowest bidder |
Tender Value
₹3.2 L
EMD Value
₹8,015
Closing Date
25 Oct 2023, 6:00 pmClosed
Assistant Engineer, LIDEW Section, Eramam kuttur
Office of the Assistant Engineer, LIDEW Section, Eramam kuttur Grama Panchayat
Annual Plan-Eramam Kuttur GP-Project no203/22-23-Construction of Check Dam in Cheppathodu-General Civil Work
2023_LSGD_613507_2
73/23-24
Open Tender
Civil Works - Others
Item Rate
180 days
Eramam kuttur
Please refer Tender documents.
7 documents required · 7 mandatory
₹710
Yes
₹8,015
Yes
22 Nov 2023
17 Oct 2023
27 Oct 2023
17 Oct 2023
25 Oct 2023
17 Oct 2023
Amount
Checkdam
OD445119/2022-2023:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.(Data for 10m) (Same as Item No.60.1.2)
OD445120/2022-2023:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete Same as item No.60.2.2
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
4.3.3:Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
OD445121/2022-2023:Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete(Same as item no.60.8)
DHANESH K T P
Bidder Name
DHANESH K T P
N JANARDHANAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_917956.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .