Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹48.9 LAccepted-AOC | L-1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹50.5 L+₹1.6 L (3.23%)Rejected-Finance | L2 | Rejected-Finance Quoted amount excluding GST | |
| 3 | L-3₹58.0 L+₹9.0 L (18.4%)Rejected-Finance | L-3 | Rejected-Finance Quoted amount excluding GST |
Tender Value
Refer Docs
EMD Value
₹67,301
Closing Date
19 Oct 2023, 5:00 pmClosed
General Manager(Mech.),E and M, OCC Ltd.
office of General Manager(Mech.),E and M, OCC Ltd., Rasulgarh, Bhubaneswar.
Maintenance painting work of Spillway and Under sluice gates, Left HR and Right HR gates with their hoist bridges, Rope drum hoists, trestle structures, chequered plates, hand railings, monorail structures, rail girders, stop logs and lifting beam et
2023_OCCL_95159_1
E-Procurement Notice No. 38/OCCL/2023-24 (on-line)
Open Tender
Mechanical Works
Item Rate
90 days
Salapada, Keonjhar
Please refer tender documents
3 documents required · 3 mandatory
₹11,800
₹67,301
Office of the G.M (M), E and M, Central Workshop
19 Feb 2024
5 Oct 2023
20 Oct 2023
5 Oct 2023
19 Oct 2023
5 Oct 2023
5 Oct 2023 - 11 Oct 2023
12 Oct 2023
Amount
Maintenance painting of Spillway & Under sluice gates, Left HR & Right HR gates with their hoist bridges, Rope drum hoists, trestles , chequred plates, hand railings, monarail structures, rail girders, stoplogs and lifting beams including surface preparation at Anandapur Barrage Project, Keonjhar.
Re-painting of Spillway, Under sluice, Left HR & Right HR Gates after water jet cleaning. After water jet cleaning,the surfaces should be cleaned from loose dust & debris by air blast with help of blower.Over the the prepared surfaces apply 01 coat of solventless coal tar epoxy paint with spray applications, should be performed with airless. The coat should give a minimum dry film thickness of 50 ± 5 microns. Total dry film thickness of all coats including existing coats should not be less than 400 ± 5% microns.The rate should include hire chages of compressor, painting equiments, labour, other machinery,machines for water jetting, scaffolding etc as per direction of the Engineer-in- charge.
Re-painting of Spillway, Under sluice, Left HR & Right HR Gates after cleaning manually by buffing, grinding etc and scraping with wire brush. After cleaning manually by buffing, grinding etc and scraping with wire brush, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, two coats of zinc rich primer (containing not less than 85% zinc ) should be applied to give a dry film thickness of 70 ± 5 microns. First coat of primer should be applied within six hours of surface cleaning. Finishing coat should consist of 02 coats of solventless coal tar epoxy paints.Each coat should give minimum dry film thickness of 150 ± 5 microns. Total dry film thickness of all coats including primer coat should not be less than 350 microns.Painting with spray application should be performed with airless spray equipment. The rate should include hire charges of compressor,painting equiments, labour, other machinery,scaffolding etc. as per direction of the Engineer-in-charge.
Re-painting of Spillway & under sluice, Left HR & Right HR hoist bridges, Rope drum hoists, trestles,chequred plates, hand railings, monarail structures, rail girders and lifting beams after water jet cleaning.After water jet cleaning, the surface should be cleaned from loose dust & debris by air blast with help of blower. Over the prepared surfaces, apply one coat of synthetic enamel paint with spray application, should be performed with airless spray equipments.The coat should give a minimum dry film thickness of 25 ± 5 microns. Total dry film thickness of all coats including existing coats should not be less than 200. microns. The rate should include hire charges of compressor, painting equiments, labour, other machinery, machines for water jetting, scaffolding etc. as per direction of the Engineer-in-charge.
Re-painting of Spillway & under sluice, Left HR & Right HR hoist bridges, Rope drum hoists, trestles, chequered plates, hand railings, monorail structures, rail girders and lifting beams after water jet cleaning, cleaning manually by buffing, grinding and scraping with wire brush. After cleaning manually by buffing, grinding and scraping with wire brush, the surface should be cleaned from loose dust & debris by air blast with help of air blower. Over the prepared surfaces, two coats of zinc phosphate primer should be applied to give a minimum dry film thickness of 40 ± 5 microns per each coat. First coat of primer should be applied within six hours of surface cleaning, followed by 02 coats of synthetic enamel paint to give dry film thickness of 25 ± 5 microns per coat. Total dry film thickness of all coats including existing coats should not be less than 130 microns. Painting with spray application should be performed with airless spray equipment. The rate should include hire charges of compressor,painting equiments, labour, other machinery,scaffolding etc. as per direction of the Engineer-in-charge.
UTTAM KUMAR ACHARYA
KAMAKSHI ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .