| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.0 LAccepted-Finance | ₹43.0 L | L1 | Accepted-Finance Lowest bidder |
| 2 | L2₹43.8 L+₹78,118.08 (1.82%)Rejected-Finance VILLAGE BALI PO BEHLI TEHSIL NIHRI DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | ₹43.8 L+₹78,118.08 (1.82%) | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹45.1 L+₹2.2 L (5.00%)Rejected-Finance VILLAGE AND POST OFFICE LUJ TEHSIL PANGI DISTRICT CHAMBA | ₹45.1 L+₹2.2 L (5.00%) | L3 | Rejected-Finance Other than lowest |
| 4 | L4₹45.5 L+₹2.5 L (5.82%)Rejected-Finance VILL SAKRAH PO CHAMBI TEHSIL SUNDERNAGAR DISTT MANDI HP | SUNDERNAGAR | MANDI | HIMACHAL PRADESH | ₹45.5 L+₹2.5 L (5.82%) | L4 | Rejected-Finance Other than lowest |
| 5 | L5₹49.3 L+₹6.3 L (14.7%)Rejected-Finance | ₹49.3 L+₹6.3 L (14.7%) | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | ANKUSH VERMA L2 | pushapraj L5 | RANJEET SINGH CONTRACTOR L1 | KUSHAL SINGH RAGHAV L4 | BHUPENDER THAKUR L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting soft or hard rock or by chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming / dressing of sidesand bed stacking the excavated soil clear from the edge of excavation and returning the excavated soil after completion of work in 15cm layers when required into plinth , sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge. | 404.69 | Cum | 320 ₹1,29,500.8 | 380 ₹1,53,782.2 | 199 ₹80,533.31 Lowest | 325 ₹1,31,524.25 | 440 ₹1,78,063.6 |
| 2.00 | Providing and laying cement concrete 1:4:8 (1cement:4 sand:8 graded crushed /broken stone agg.40mm nominal size)and curing complete excluding cost of centring,shuttering in foundation and plinth in all leads and lifts. | 23 | Cum | 5,200 ₹1,19,600 Lowest | 6,500 ₹1,49,500 | 6,800 ₹1,56,400 | 5,995 ₹1,37,885 | 5,300 ₹1,21,900 |
| 3.00 | Providing and laying cement concrete 1:1.5:3 (one cement : one and half sand : three graded crushed stone aggregate 20mm nominal size ) and curing complete excluding cost of form work and reinforcement for reinforced cement concrete work in all leads and lifts in:- Foundation ,footings bases of columns and the like mass concrete in all leads and lifts. | 45 | Cum | 7,370 ₹3,31,650 Lowest | 8,000 ₹3,60,000 | 8,199 ₹3,68,955 | 7,995 ₹3,59,775 | 7,500 ₹3,37,500 |
| 3.10 | Walls any thickness but not less than 0.1 mtrs. thickness attached pillasters, plinths and string courses etc.from top of foundation level upto floor two level in all leads and lifts . | 89.09 | Cum | 7,500 ₹6,68,175 Lowest | 8,200 ₹7,30,538 | 8,300 ₹7,39,447 | 8,195 ₹7,30,092.55 | 7,600 ₹6,77,084 |
| 4.00 | Providing and laying cement concrete 1:2:4 (1cement:2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | 19.26 | Cum | 7,174 ₹1,38,171.24 | 7,500 ₹1,44,450 | 8,000 ₹1,54,080 | 7,385 ₹1,42,235.1 | 6,700 ₹1,29,042 Lowest |
| 5.00 | Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs. and removal of the same for in-situ reinforced concretre and plain concrete work in all leads and lifts in:- Vertical surface such as walls(any thickness) partitions and the like including attached pillasters, buttresses, plinth and string courses and the like. | 1,198.9 | Sqm | 310 ₹3,71,659 | 400 ₹4,79,560 | 250 ₹2,99,725 Lowest | 295 ₹3,53,675.5 | 400 ₹4,79,560 |
| 5.10 | Flat surfaces such as soffits of suspended floors,roofs,landings and the like floors etc.upto 200mm in thickness in all leads and lifts. | 78.55 | Sqm | 320 ₹25,136 | 350 ₹27,492.5 | 260 ₹20,423 Lowest | 305 ₹23,957.75 | 500 ₹39,275 |
| 6.00 | Providing and laying cement concrete 1:2:4 (1Cement :2 sand:4 graded crushed stone aggregate 20mm nominal size and curing completre excluding the cost of form work and reinforcement for reinforced concrete work in all leads and lifts in:- Suspended floors, roofs, landing, shelves and their supports balconies, lintels, beams girders bresumers and cantilevers upto all floor two level . | 24.79 | Cum | 7,165 ₹1,77,620.35 | 7,500 ₹1,85,925 | 8,000 ₹1,98,320 | 7,385 ₹1,83,074.15 | 6,800 ₹1,68,572 Lowest |
| 7.00 | Providing tor steel reinforcement for RCC work including bending,binding and placing in position compete upto floor two level in all leads and lifts. | 14,300 | Kg | 88 ₹12,58,400 | 90 ₹12,87,000 | 85 ₹12,15,500 Lowest | 85 ₹12,15,500 Lowest | 91 ₹13,01,300 |
| 8.00 | Providing and fixing SFRC manhole cover with frame confirming to IS: 12592 (Part-II) 1991 with latest ammendments of different grades, description and opening of frame heavy duty circular type 560mm dia as per requirement in all leads and lifts to the entire satisfaction of the Engineer-in-charge. | 100 | Nos. | 3,150 ₹3,15,000 | 2,800 ₹2,80,000 | 2,400 ₹2,40,000 | 2,395 ₹2,39,500 Lowest | 2,500 ₹2,50,000 |
Tender Value
₹56.0 L
EMD Value
₹1.1 L
Closing Date
28 Jul 2026, 5:00 pmClosed
Executive Engineer
Jal Shakti Division Sundernagar
CO manhole chambers and protection wall at various locations
2026_HPIPH_139401_1
EE JSD SNR TA etender 2026-10926-50 dt. 18.07.2026
Open Tender
Civil Works - Others
Item Rate
180 days
Sundernagar
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,000
₹1.1 L
31 Jul 2026
18 Jul 2026
29 Jul 2026
18 Jul 2026
28 Jul 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting soft or hard rock or by chiselling soft or hard rock where blasting is prohibited in all leads and lifts including trimming / dressing of sidesand bed stacking the excavated soil clear from the edge of excavation and returning the excavated soil after completion of work in 15cm layers when required into plinth , sides of foundation etc. consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated soil complete in all respect as per the direction and to the entire satisfaction of the Engineer-in-charge. | 404.69 | Cum | 100 | ₹40,469 |
| 2 | Providing and laying cement concrete 1:4:8 (1cement:4 sand:8 graded crushed /broken stone agg.40mm nominal size)and curing complete excluding cost of centring,shuttering in foundation and plinth in all leads and lifts. | 23 | Cum | 101 | ₹2,323 |
| 3 | Providing and laying cement concrete 1:1.5:3 (one cement : one and half sand : three graded crushed stone aggregate 20mm nominal size ) and curing complete excluding cost of form work and reinforcement for reinforced cement concrete work in all leads and lifts in:- Foundation ,footings bases of columns and the like mass concrete in all leads and lifts. | 45 | Cum | 102 | ₹4,590 |
| 3.1 | Walls any thickness but not less than 0.1 mtrs. thickness attached pillasters, plinths and string courses etc.from top of foundation level upto floor two level in all leads and lifts . | 89.09 | Cum | 103 | ₹9,176.27 |
| 4 | Providing and laying cement concrete 1:2:4 (1cement:2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | 19.26 | Cum | 101 | ₹1,945.26 |
| 5 | Providing form work with steel plates 3.15mm thick welded with angle iron 30x30x5mm so as to give a fair finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs. and removal of the same for in-situ reinforced concretre and plain concrete work in all leads and lifts in:- Vertical surface such as walls(any thickness) partitions and the like including attached pillasters, buttresses, plinth and string courses and the like. | 1,198.9 | Sqm | 102 | ₹1,22,287.8 |
| 5.1 | Flat surfaces such as soffits of suspended floors,roofs,landings and the like floors etc.upto 200mm in thickness in all leads and lifts. | 78.55 | Sqm | 101 | ₹7,933.55 |
| 6 | Providing and laying cement concrete 1:2:4 (1Cement :2 sand:4 graded crushed stone aggregate 20mm nominal size and curing completre excluding the cost of form work and reinforcement for reinforced concrete work in all leads and lifts in:- Suspended floors, roofs, landing, shelves and their supports balconies, lintels, beams girders bresumers and cantilevers upto all floor two level . | 24.79 | Cum | 103 | ₹2,553.37 |
| 7 | Providing tor steel reinforcement for RCC work including bending,binding and placing in position compete upto floor two level in all leads and lifts. | 14,300 | Kg | 101 | ₹14,44,300 |
| 8 | Providing and fixing SFRC manhole cover with frame confirming to IS: 12592 (Part-II) 1991 with latest ammendments of different grades, description and opening of frame heavy duty circular type 560mm dia as per requirement in all leads and lifts to the entire satisfaction of the Engineer-in-charge. | 100 | Nos. | 102 | ₹10,200 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
BOQ_206575.xls
BOQ • 0.55 MB
Form6.pdf
Tender Documents • 0.03 MB
Form8.pdf
Tender Documents • 0.49 MB
Termsandconditions.pdf
Tender Documents • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .