Tender Value
₹4.8 L
EMD Value
₹9,700
Closing Date
8 Dec 2022, 3:00 pmClosed
virender kumar and karnail singh
Executive Engineer HSVP Division Ambala
detailed project report and bid document for the work of Construction of 5 MLD Sewage Treatment Plant On SBR technology with tertiary Treatment complete in all respect for Sector 32 33 and 34 Urban Estate Ambala Cantt
2022_HBC_247569_1
JOBNO.HSVP/AMB/2022-23/E-139 (Re-invite)
Open Tender
Civil Works
Works
Ambala
Please refer Tender documents.
3 documents required · 3 mandatory
₹250
Yes
₹9,700
Yes
25 Aug 2023
28 Nov 2022
9 Dec 2022
28 Nov 2022
8 Dec 2022
28 Nov 2022
Amount
1.0) On completion and submission of Survey work, Soil Testing report and Influent Raw Sewage and Treated Effluent characteristics reports
1.1) On submission of Feasibility Report
2.1) On submission of DPR 2.0) Tender documents preparation comprising of the following Preparation of pre-qualification,General Terms & Conditions, Scope of work, Detailed Specifications for civil, Mechanical, Electrical, Instrumentation Automation, Technical data sheets, Price schedule, Pre bid conference.
3.0) After Price bid Opening 3.1) Evaluation of technical bids and price bid & recommendations
4.0) Checking and recommendation for approval of SUBMISSIONS made by successful bidder for following : 4.1) Pre structural Design:- a) Sizing Calculation b) Process & Instrumentation Drawings c) Power Generation Calculations d) Technical Data Sheets and GA drawing for Mechanical and Electric Equipments. e) Plant Layout and GA Drawings
4.2) Structural Civil Drawings a) Civil GA drawings (the design submitted by the bidder shall be got vetted from any reputed institution by HSVP and consultant shall be only checking the design and hydraulic levels).
4.3) Electrical, Mechanical, Instrumentation & Automation. a) Automation process write ups. b) Process automation blocks drawing & instrumentation data sheets & loop drawings. c) Mechanical GA, Fabrication drawings d) SLD, Mimic panel & MCC drawings e) HT Panel, LT Panel & HT to LT conversion, Transformers, Substation Designs& drawing. f) Shop Fabrication Drawings for Electrical and Mechanical Equipments. g) Working drawings. h) O&M Manual
5.0) Site visit by Technical expert 6.0) On Successful completion of work. 7.0) On successful completion of defect liability period.
Multitech Consultant
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .