Loading…
Loading…
Tender Value
₹79.7 L
EMD Value
₹79,665
Closing Date
23 Jun 2026, 6:00 pmClosed
Municipal Commissioner, Ahmedabad
Misc. Repair and Maintainance works of Different Water Distribution Station of South West Zone and other zones in under Water Project Dept. A.M.C.
313970
Tender Notice / 2026-27, T. No.6
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹2,400
Municipal Commissioner, Ahmedabad
₹79,665
12 Jun 2026
12 Jun 2026
12 Jun 2026
23 Jun 2026
12 Jun 2026
Volume I: - Technical Bid
Part – I: General
(1) Tender download from : Website https://tender.nprocure.com
(2) Last date of online Tender Submission : 23-06-2026 Up to 18.00 hours
(3) Date of Submission of Tender Fees, EMD : 24-06-2026 by Speed Post or Registered Post
& Other documents in hard copy AD / Courier/ Hand delivery up to 16.00 hrs.
(4) Date of e-Tender (Technical Bid) Opening : 25-06-2026 at 11.00 hours
Municipal Commissioner
Ahmedabad Municipal Corporation
Sardar Patel Bhavan
Ahmedabad – 380 001 Gujarat (INDIA)
Website :www.egovamc.com
A-1: NOTICE INVITING TENDER
A-2: MEMORANDUM OF WORKS IN BRIEF
A-3: SCOPE OF WORKS
A-4: INSTRUCTIONS TO TENDERERS
A-5: QUALIFICATION CRITERIA FOR
SECTION–A: GENERAL
Sr. Description Page No.
A.1 Notice Inviting Tender A-1/1 to A-1/5
A.2 Memorandum of work in brief A-2/1 to A-2/2
A.3 Scope of Works A-3/1
A.4 Instructions to Tenderers
A.4.1 Note A-4/1
A.4.2 Invitation to Tender A-4/1
A.4.3 Tender Validity Period A-4/1
A.4.4 Language of Tender A-4/1
A.4.5 Documents A-4/2
A.4.6 Earnest Money A-4/2
A.4.7 Income-tax Clearance Certificate A-4/3
A.4.8 Submission of Tender A-4/3
A.4.9 General Performance Data A-4/4
A.4.10 Signing of Tender Document A-4/5
A.4.11 Interpretation of Documents A-4/5
A.4.12 Errors and Discrepancies in Tender A-4/5
A.4.13 Modification of Documents A-4/6
A.4.14 Evaluation of Tender A-4/6
A.4.15 Policy for tenders under consideration A-4/6
A.4.16 Alternatives (Deleted) A-4/6
A.4.17 Cost of tendering A-4/7
Sr. Description Page No.
A.4.18 Award of Contract A-4/7
A.4.19 Signing of Contract A-4/7
A.4.20 Stamp Duty and Legal Charges A-4/7
A.4.21 Solvency Certificate A-4/8
A.4.22 Documents / Information to be submitted along with Volume- I A-4/8
Bank Guarantee for Earnest Money – Form ‘A’ A-4/10
Income-taxClearanceCertificate – Form ‘B’ A-4/14
Income-taxClearanceCertificate – Form ‘C’ A-4/16
Performance Bond A-4/17
A.4.24 List of Approved Banks A-4/19
A.5 Qualification criteria for Tenderers
A.5.1 Eligibility Criteria A-5/1
A.5.2 General Experience A-5/1
A.5.3 Financial Position A-5/1
A.5.4 Litigation History A-5/1
A.5.5 Solvency Certificate A-5/2
A.5.6 Bidding Capacity A-5/2
A.5.7 Personnel A-5/3
A.5.8 Equipment A-5/3
A.5.9 Joint Ventures A-5/4
A-1: NOTICE INVITING
TENDER SECTION: A-1
Sub. :- Misc. Repair and Maintainance works of Different Water Distribution
Station of South West Zone and other zones in under Water Project Dept.
The Municipal Commissioner of Ahmedabad Municipal Corporation
(AMC) invites the online percentage rate tenders (two-bid system) from the
prosperous, experienced bidders and who qualifies the eligibility criteria, as
mentioned in Section – A.5 of the tender document for Misc. Repair and
Maintainance works of Different Water Distribution Station of South
West Zone and other zones in under Water Project Dept. A.M.C.
One sets of tender documents containing –
Volume –I : Technical Bid
Part –I : (Section – ‘A’, ‘B’, ‘C’) – Tender
Notice, General Conditions of
Part – II : (Section – ‘D’, ) – Technical
Volume–II: Financial Bid
Schedule of Quantities and Rates (Section – ‘F’)
Along with conditions of contract will be available from the
websitehttps;//tender.nprocure.com. Tenderers shall have to present D.D. of
Rs.2,400/- as tender fee along with the tender or have to deposit Rs.2,400/-
along with tender at the time of submitting the tender to AMC (Projects).
Tenderers will have to obtain digital signature in order to submit the bid for
An unconditional bank guarantee/Demand Draft/Pay Order (Earnest
Money) on required stamp paper from the Bank, acceptable to the
Corporation for Rs.79665/- must accompany each tender. All the Tenderers
have to submit this bank guarantee/D.D./Pay Order as specified in the
tender document.
The successful Tenderers shall have to pay security deposit in Indian
Rupees in approved Form ‘A’ enclosed with the tender document.
The Earnest Money of the unsuccessful Tenderers(s) (L2 and L3) will be returned
by AMC, after the award of this contract has been finalized. Earnest Money of
Remaining Contractors will be released within 7 days.
The tender shall be accompanied with the copy of Income Tax return of year –
2024-2025 (or latest year’s) with copy of PAN Card.
Please note that only tender fees, EMD, Affidavits, Undertaking / MOU and
Addenda shall be submitted in hard copy with bidder forwarding letter in
sealed envelopes
Copies of Similar type of works carried, works on hands, details of technical
Personnel, financial capacity, bidding capacity and required details in
Schedules (Format) given in Section–B6 and all other required tender
documents for tender evaluation duly filled as specified in tender must be
uploaded Online.
Technical Bid in Hard copy shall be submitted only by Successful bidders upon
intimation from AMC.”
The Technical envelop (comprising of EMD & Tender Fees, Affidavits,
Undertaking and Addenda only) shall be submitted in sealed envelopes as
described, so as to reach at the following address on or before the date and time
mentioned in tender notice by Registered AD Post/ Speed Post/ Hand Delivery/
Assistant Manager (Projects),
Ahmedabad Municipal Corporation,
Sardar Patel Bhavan, Danapith,
Ahmedabad – 380 001 (Gujarat) – INDIA
Technical and financial bid with required data shall be submitted on-line on
tender.nprocure.com.
The Tenderers shall clearly state in the forwarding letter (in duplicate) to be
enclosed with the tender documents, the deviations from General Terms and
Conditions, if any with cross references. If no such letter is received, it will be
presumed that the Tenderers agree entirely with the General Terms and
All details and schedules required for pre-qualification and technical evaluation
shall be submitted in soft copy (online) in prescribed format.
Document fees, EMD in form of Bank Guarantee / DD/Pay Order as per AMC
Approved Bank List Shall be submitted in a sealed envelope to AMC before prescribed
Financial bid shall be submitted online onhttps;//tender.nprocure.com
The technical bids from the bidders received, will be opened online in the presence
of the bidder’s representatives who chose to attend at the office of Assistant
Manager Project, Sardar Patel Bhavan, Danapith, Ahmedabad Municipal
Corporation, Ahmedabad – 380 001 (Gujarat) – INDIA, and the technical bids
will be scrutinized by Ahmedabad Municipal Corporation for satisfying various
eligibility criteria prescribed for the bidders for thiswork.
Then, the financial bids from the eligible Tenderers only will be opened online.
The actual date of opening of financial bids will be communicated to
technically qualified bidders at a later date.
Tenders received without EMD will be considered as Non-Responsive and will be
rejected outright.
The conditional tender will not be accepted and will be rejected outright, unless,
the nature of condition(s) put for by the bidder is acceptable to AMC. Any
suggestions/ alterations from the tender specifications, if suggested, must be
mentioned in the main forwarding letter.
The Tenderers shall quote (+/-) percentage online in schedule of quantities and
rates both in figures and words in volume-II, Item rate shall be quoted online of
the tender document (Financial Bid).
The Tenderers shall have to attach the following documents in duplicate with the
i) A true copy of registration as an approved Contractor in ‘D’ class,
registered with AMC, State and Central Government and other
Corporations /Boards.
Incomplete tender who does not fulfill any of the above conditions will be liable
for rejection. Tender will also be liable to be rejected if–
i) The Tenderers proposes any alteration in the work specified or in the time
allowed in carrying out the works or make corrections in Schedule of
ii) Any of the page or pages in the tender is / are removed or replaced.
iii) All corrections, additions or pasted slips are not initialed by the
iv) Any erasure is made in the tender.
v) The Tenderers or in the case of a firm, each partner or the person holding the
power of attorney thereof does not sign or the signature(s) is (are) not
attested by the witness, wherever it is required.
vi) The Tenderers returns the tender document without signing relevant
pages of the bid.
Acceptance of the tenders will rest with the competent authority who does not bind
himself to accept the lowest tender and reserves the right to reject any or all tenders
without assigning any reason thereof.
It must be clearly and distinctly understood that the conditions of contract and
specifications shall be rigidly enforced and no relaxation on the grounds of
customs prevailing shall be allowed.
The rates should be quoted exclusive of GST but inclusive of all other taxes.
The Tenderers shall be considered to have visited the site of work, fully acquainted
himself with the local situations regarding materials, labour and other factors
pertaining to work and studied the plans and estimates before submitting the tender.
In the event of a discrepancy between description in words and figures quoted
by the Tenderers, the description in words shall prevail.
The tender for the work shall remain open for a period of 120 days from the date of
opening of the price bid and the Tenderers shall not be allowed to withdraw or
modify the offer on his own during this period any modifications or additions in
terms and conditions of his tender not acceptable to the Addl. City Engineer (Water
Project), The Addl. City Engineer (Water Project) shall without prejudice to any
right or remedy, be at liberty to forfeit in full the said earnest money
The Corporation reserves the right to reject all the tenders of the lowest or any other
tender which in the judgment of the corporation does not appear to be in its best
interest and the Tenderers shall have no cause of action or claim against the
Corporation of its officers, employees, successors for assignees for rejection of its
tender. The Municipal Commissioner does not bind himself to accept the lowest or
any tender. Tender documents are not transferable.
(a) The Contractor shall furnish to the Addl. City Engineer (Water Project) ,every
week during the progress of the works, classified weekly returns of the
number of the people employed on the work during the week. The report of
skilled and unskilled labour shall be given in the prescribed forms or in
separate statement.
(b) Details of machineries deployed on site also shall be furnished by the
Contractor, every week.
The Tenderers, if directed by the Engineer in charge; shall increase or decrease the
strength of the labour both skilled and unskilled. The Contractor shall also furnish
the following returns:
(a) A report of any accident which may have occurred within 24 hours of its
The Tenderers shall strictly observe all the requirements laid down in the Contract
Labour (Regulation and abolition) Act, 1970 and the Contract Labour (Regulation
and Abolition) (Gujarat) Rules, 1972 and other acts as amended from time to time
so far as applicable. The Tenderers should obtain necessary permission, license and
registration from the labour commissioner, as per labour law.
The work is to be completed in all respects within 12 (Twelve) months including
monsoon, reckoned from the date of written order to commence the work.
The Tenderers shall carefully read the eligibility criteria, furnish the details and
satisfy the same; otherwise the tender will be rejected without assigning any
The Tenderers is required to check the web site for Addendum if any, before
hours of tender submission date and time. The Tenderers who quotes the tender
without attaching the addendum will be rejected.
This notice will form part of the Contract.
Note: ‘Form B1’ referred in this contract shall be read as Section – B1.
Signature of Contractor Additional City Engineer (Water Project)
Name : Ahmedabad Municipal Corporation
Company’s seal :
A-2 : MEMORANDUM OF WORKS IN BRIEF
A.2.1 Name of Work : Misc. Repair and Maintainance
works of Different Water
Distribution Station of South
West Zone and other zones in
under Water Project Dept.
A.2.2 Estimated Cost : Rs.
A.2.3 Earnest Money : Rs. 79665/-
A.2.4 Validity Period of Tender offered : 120 days from the date of opening of the
A.2.5 i) Security Deposit : 5% of the Contract value in the form of Bank
Guarantee/ Demand Draft.
The security deposit shall be payable in
days from date of receipt of LOI failing which
interest @ 4 % per annum will be charged by
(Bank Guarantee issued from
Ahmedabad Branch only as per para A.4.24.
If bidder submit bank guarantee outside
Ahmedabad branch then in bank guarantee
clearly mention this bank guarantee is
payable in following Ahmedabad bank
ii) Retention Money 2% of the bill amount to be deducted from
running bills & will be return at the time of
A.2.6 Time allowed for completion of : a) 12 (Twelve)months including of
the work from the date of written monsoon period
order to commence b) If the site is not cleared to start the
work, the time limit will be
considered from the date of
possession given to start the work.
A.2.7 a) Tender Document shall be : AMC’s website https;//tender.nprocure.com
b) Date on which the tender must : 24-06-2026 up to 16:00 hrs.(As
reach the office mentioned in the Notice inviting tender)
c) Mode of submitting the filled 23-06-2026 up to 18:00 hrs.
up tender (online)
d) Description essential to be :
a) Misc. Repair and Maintainance
made on sealed cover
works of Different Water
Distribution Station of South
West Zone and other zones in
under Water Project Dept.
b) Contact No.:
c) Last date of Receiving tender
By corporation : 24-06-2026
e) Mode of quoting rate in : In figures as well as in words to be done
Schedule of quantities (in on line in Vol. II only. The tenderer
Volume – II) should not mention his percentage (+/-)in
volume – I or in his forwarding letter as
that will lead to rejection of tenders.
A.2.8 Tender opening : At the time of opening of tender only
Volume - I (Technical bid) of all the
tenders will be opened online. After
scrutiny of this Volume-I, the Volume-II
(Financial Bid) of those tenderers,
satisfying the eligibility criteria will be
A.2.9 Execution of work : Work shall start and progress simultaneously
as per the priority and as directed by
Engineers-in-charge.
A.2.10 Performance Guarantee : 5 % of the Contract value of a work as a
Performance Guarantee and will be released
after6 months from the date of completion of
the work or One Monsoon, Whichever is
Payable at Ahmedabad is enclosed herewith
representing the earnest money, the full
value of which is to be absolutely forfeited
by AMC, should I / We not deposit the full
amount of security deposit specified above.
The rates should be quoted exclusive of GST
A.2.12 Price-Bid :
but inclusive of all other taxes as per
Volume-I, B-2 GENERAL CONDITIONS
OF CONTRACT, Clause-48.
Please note that only tender fees, EMD, Affidavits, Registration Certificate, Undertaking / MOU and
Addenda shall be submitted in hard copy with bidder forwarding letter in sealed envelopes.
Copies of Similar type of works carried, works on hands, details of technical Personnel, financial
capacity, bidding capacity and required details in Schedules (Format) given in Section–B6 and all
other required tender documents for tender evaluation duly filled as specified in tender must be
uploaded Online.
Technical Bid in Hard copy shall be submitted only by Successful bidders upon intimation from
The Technical envelop (comprising of EMD & Tender Fees, Affidavits, Registration Certificate,
Undertaking and Addenda only) shall be submitted in sealed envelopes as described, so as to reach on
or before the date and time mentioned in tender notice by Registered AD Post/ Speed Post/ Hand
Delivery/ Courier.
• Rates exclusive of GST but inclusive of all other taxes
The rates to be quoted by the Contractor must be exclusive of GST but inclusive of all other taxes. However
any subsequent changes in the tax structure by Government after due date of bid submission will be
compensated on availability of submission of actual documentation. Contractor has to intimate Engineer in
charge regarding changes occurred in the tax structure after bid submission. If contractor fails to provide
such information and if may financial obligation may arise due to change in tax structure, same will be
recovered from the contractor.
The contractor shall apply fair means of stock maintenance and shall adopt accounting standards as may be
prescribed under GST. For arriving at the difference in procurement prices due to introduction of GST, it
will be open for the Government to ask for original invoices, LR, weigh bridge slips; payment details and
such other documents as may be required for the purpose. If there is reduction in overall tax burden then
proportional benefit of that shall be passed on to the Government.
Signature of Contractor Additional City Engineer (Water Project)
Name : Ahmedabad Municipal Corporation
Company’s seal :
A-3: SCOPE OF WORKS SECTION : A-3
The broad scope of civil work for Misc. Repair and Maintainance works of
Different Water Distribution Station of South West Zone and other zones
in under Water Project Dept. A.M.C. The work shall be carried out in
accordance with specifications and instructions of Engineer in charge
issued from time to time.
The works include Excavation work, Carting Re-carting work, Filling
Work, Demolition work, Bricks/RCC works, plastering works, Painting
work repairing existing doors &windows, fixing new aluminum & steel
doors, Rolling shutter, I.P.S. Paving, Stone paving, Glaze Tiles, Storm
Water &Drainage pipeline work & Plumbing Work, exterior apex paint,
interior White Wash, RCC Road, Paver block, Epoxy paint on fabrication
work, Plumbing work& Other civil works as per specification specified in
technical Specification.
Signature of Contractor Additional City Engineer (Water Project)
Name: Ahmedabad Municipal Corporation
Company’s seal:
A-4 : INSTRUCTIONS TO TENDERERS
These instructions are provided to assist tenderers while preparing their tenders.
They do not form part of the Contract and they shall not be taken into consideration
in interpreting or construing the Contract.
Invitation to Tender
The Municipal Commissioner for and on behalf of the Ahmedabad Municipal
Corporation, Ahmedabad, hereinafter referred to as the Corporation, will receive
on line tenders for the construction works according to the specifications and
Schedule of Quantities in the tender documents herewith attached.
Tenders will not be accepted after the hour and date fixed for receiving of tenders.
Telegraphic tenders will not be accepted under any circumstance. Tenders received
after the hour and date so fixed will not be considered. Tenders will be received up
to 16.00 hours on or before 24-06-2026.Tenderer’s authorized re-preventatives
may attend the tender opening. The date and time for opening of tenders will be
communicated to tender are separately.
However, the Corporation reserves the right to reject all the tenders or the lowest or
any other tender which in the judgment of the Corporation does not appear to be in
its best interest, and the tenderer shall have no cause of action or claim against the
Corporation or its officers, employees, successors or assignee for rejection of its
The Municipal Commissioner does not bind himself to accept the lowest or any
tender. If the tenderer wishes to offer discount in the event of the entire work being
awarded to him, he shall state so in the tender.
Tender documents are not transferable.
Tender Validity Period
The tender shall be kept valid for acceptance for a period of one hundred twenty
(120) calendar days from the date of opening of financial bids.
Language of Tender
Tenders shall be submitted in English, and all information in the tender shall be in
English. Information in any other language shall be accompanied by its translation
in English. Failure to comply with this may disqualify a tender. Only English text
shall be governing.
One sets of tender documents (Vol. I & Vol. II, drawings & addendum if any),
comprehensively referred to as Tender Document, are issued to every tenderer. The
details of the Tender Document referred above are as follows:
Volume –I : Technical Bid
Part –I: (Section – ‘A’, ‘B’, ‘C’) – Tender Notice,
General Conditions of Contract etc.
Part – II: (Section – ‘D’,) – Technical Specifications
Volume–II: Financial Bid
Schedule of Quantities and Rates (Section – ‘F’)
Each tender must be accompanied by a receipt for Earnest Money Deposit as
Demand Draft/Bank Guarantee/Pay Order in the prescribed form, from a bank
acceptable to the Corporation. Tender deposit is accepted as detailed out in Section-
Tenders not accompanied by Earnest Money as required shall be rejected as
non-responsive.
In case of Bank Guarantee/Demand Draft, the same shall be valid for 120 days from
the price bid opening date.
If during the tender validity period, the tenderer withdraws his tender or the
successful tenderer fails to accept the contract within 10 calendar days after
receiving notice of the award of contract and fails to submit contract deposit, the
earnest money in the form of D.D/ bank guarantee/Pay Order shall be forfeited
and the tenderer may be disqualified from tendering for further works with
the Municipal Corporation of Ahmedabad.
A list of banks from whom guarantees will be acceptable by the Corporation is
attached to these Instructions. Tenderers are requested to verify from the
Corporation the wording of the Tender Guarantee if they consider any modification
is necessary and also to enquire about acceptability of the bank by whom the
guarantee will be given, as possible during the tender period.
After the award has been finalized, the Earnest Money will be returned to the
respective tenderers, with the exception of the successful tenderer.
The successful tenderer’s earnest money will be retained as security after signing
the contract and for making of the contract deposit. In case of Bank
Guarantee/Demand Draft, successful tenderer’s Bank Guarantee/Demand Draft will
be returned after furnishing the contract deposit.
No interest will be paid on any tender deposit /guarantee.
Income Tax Clearance Certificate
In case of domestic tenderers, the tender must be accompanied by an Income-Tax
Clearance Certificate for the last three financial years in the form attached (Form
‘B’). In case it is not possible to furnish such a certificate, the tenderers should
submit with the tender, information regarding the Income-Tax, circle or ward of the
district in which he is assessed for Income Tax, reference number of the assessment
and the assessment year in the form attached (Form ‘C’). If a tender is submitted
without complying with these requirements, it is liable to be rejected outright.
Submission of Tenders
Tenders shall be submitted online in three (3) stages as prescribed on website
amc.nprocure.com. In the event of a Contract, the tender and the documents
attached thereto shall be considered as forming part of the Contract Documents.
EMD & Tender Fees, Affidavits, Registration Certificate Undertaking and Addenda
only submitted to AMC in sealed envelope, so as to reach by up to 16.00 hrs. on
30/11/2023 at the following address
Assistant Manager (Projects),
Ahmedabad Municipal Corporation
Sardar Patel Bhavan
Ahmedabad – 380
The sealed envelopes shall show on the outside, the name of the tenderer and
his address. In addition, the lower left hand corner of the envelope or other
container should indicate the Contract number and the tender opening date.
Tenders which are opened before the due date with no indication having been given
on the outside of the envelope or container to indicate that it is a tender liable to be
No tender shall be accepted unless both the envelope is sealed. Tenderers shall
not be allowed to fill in or seal their tenders at the Municipal Office. Tenderers are
requested to present the tenders in good time on the stipulated day so as to
avoid rush at the closing hours.
Envelope of the tender document shall be accompanied by the following documents
(a) Vol. I of the tender with duly signed.
(b) A receipt for a deposit as earnest money as detailed in item A.4.6, above.
(c) In case of domestic contractor, an income-tax clearance certificate as
detailed in item A.4.7,above
(d) A certificate of registration as approved Contractor should be attached
with the tender.
Time being the essence of the contract; the tenderers should indicate the tender
completion date(S). The desired completion requirements of the Corporation are
indicated in the specifications attached.
Erasures and other changes shall be noted over by the initials of the person
signing the tender.
General Performance Data
Tenderers shall present the following information online / hard copy:
(a) Evidence of financial capacity to execute a contract of this magnitude in
terms of solvency certificate, annual turnover.
(b) The bidders are requested to furnish requisite information as described in
Section: A-5 so as to enable the competent authority to decide the
technical and financial capability of the bidder, based on which, the
bidder shall be evaluated.
(c) Experience of similar works with names of authorities for which the
works were executed.
Tenders will not be considered if the above information is not provided or is
considered to be unsatisfactory.
Signing of Tender Document
Tenderers are requested to sign the Bank Guarantee Form – A, placed in
Section : A-4 of Volume I. Schedule of Quantities in Volume–II etc. after making
appropriate enquiries wherever necessary.
If the tender is made by an individual, it shall be signed with his full name above his
current address.
If the tender is submitted by a proprietary firm, it shall be signed by the proprietor
above his name and the name of his firm with its current address.
If the tender is made by a firm in partnership, it shall be signed by all the partners of
the firm above their full names and current addresses, or by a partner holding the
power of attorney for the firm signing the tender in which case a certified copy
of the power of attorney shall accompany the tender. A certified copy of the
partnership deed, current address of the firm and the full name and the
current address of all the partners of the firm shall also accompany the tender.
If the tender is made by a limited company or a limited Corporation, it shall be
signed by a duly authorized person holding the power of attorney for signing the
tender, in which case, a certified copy of the power of attorney shall accompany the
tender. Such limited Company or Corporation may be required to furnish
satisfactory evidence of its existence before the contract is awarded.
All witnesses and sureties shall be persons of status and probity and their full
names, occupations and addresses shall be stated below their signatures.
The tenders from Contractors shall be accompanied by an attested copy of income-
tax clearance certificate from the Income-tax Officer of the Circle for the previous
financial year.
All signatures in the tender documents shall bedated.
Interpretation of Documents
Tenderers shall carefully examine the Tender Documents and fully inform
themselves as to all the conditions and matters which may in any way affect the
work or the cost thereof. Should a tenderer find discrepancies in or omission from
the specification or other documents, or should be in doubt as to their meaning, he
should at once address a query to the Addl. City Engineer (Water Project) as
provided for in Clause A.4.8.8. Any resulting interpretation of the Tender
Documents will be issued to all tenderers as an Addendum. Verbal clarification
and/or information given by the Addl. City Engineer (Water Project) shall not be
binding on the Corporation.
Errors and Discrepancies in Tenders
Should the Schedule of quantities and Rates (Vol. II) submitted with the tender be
found to contain errors, or discrepancies the owner / engineer will not permit any
bidder to change the substance or price of his bid after the bid opening. In case of
discrepancyinthequotedpercentageandthecorrespondingamountthepercentagequoted
in words in all cases shall govern. Also the bidder will not be permitted to correct or
withdraw material deviations or reservations once bids have been opened.
Modification of Documents
Any Modification in the tenders, if required, will be made by an Addendum and on
https;//tender.nprocure.com AMC’s website. These shall be signed and returned
by the tenderers and shall from a part of the tender document.
The tenderer shall not add to or amend the text of any of the documents except in so
far as may be necessary to comply with the Addendum.
Evaluation of Tenders
For evaluation and comparison of bids, the following factors shall be considered
in addition to the points mentioned in Clause A.4.22.1 of Section: A-4 of
i) Technical competence.
ii) Relative quality of previous jobs.
iii) Organization setup.
iv) Financial Capability.
Policy for tenders under consideration
Tenders shall be deemed to be under consideration from the opening of tenders,
until such time as an official announcement of award is made.
While tenders are under consideration, tenderers and their representatives, or other
interested parties, are advised to refrain from contacting by any means any
Corporation personnel or representatives on matters relative to the tenders
under study. The Engineer’s Representative, if necessary, will obtain clarification
of tenders by requesting such information from any or all the tenderers either in
writing or through personal contact, as may be necessary. The tenderer will not be
permitted to change the substance of his tender after tenders have been
Cost of Tendering
The Corporation will not defray the expenses incurred by tenderers in tendering and
will not be bound to accept the lowest or any tender.
Award of Contract
Notification of award will be made in writing to the successful tenderer.
The contract will be awarded to the technically and financially qualified and
responsive tenderer offering the lowest overall evaluated tender or tenders in
conformancewithspecificationssubjecttotheprovisionsinClauseNo.A.4.14andA.4.15
i.e. Evaluation of tenders and policy for tenders under considerations, mentioned earlier.
A responsive tender is one which accepts all the terms and conditions of the Tender
Documents without any major modifications. A major modification is one which
affects in any way the price, quality, quantity or completion of works or which
limits in any way, any responsibilities or liabilities of the tenderer or any rights of
the Corporation, as specified in the Tender Documents. The Corporation may
waive any minor informality in a tender which does not constitute a major
modification. However, the failure of successful bidder to pay ‘Security
Deposit’ and signing the contract shall constitute sufficient grounds for
annulment of the award of contract and forfeiture of the earnest money
deposit, in which case the Owner/Engineer may award the contract to the next
lowest evaluated responsive bidder. In the event of not finding any such
bidders, the employer is empowered to call for new bids.
In case, the tender is found technically responsive, tenderer will be intimated
accordingly. Financial bid of only technically qualified tenderer will be opened.
Financial bid of the technically not qualified tenderer will be returned un-opened.
Signing of Contract
The successful tenderer shall be required to execute the Contract within 15 days of
receipt of intimation to execute the Contract, failing which the Corporation will be
entitled to claim discount offered for payments of bills in spite of non-payment of
the bills within the stipulated time, if such non-payment is the result of non-
execution of the contract by the tenderer. Moreover if the contractor will not pay
security deposit and do the agreement within 15 days after issuing the first letter
from the authority or corporation, for that the registration will be kept in abeyance
for three years.
The person to sign the contract documents shall be the persons as detailed in Clause
No. A.4.10 i.e. signing of tender documents.
Stamp Duty and Legal Charges
It shall be incumbent on the successful tenderer to pay stamp duty on the contract
and legal charges for preparation of the contract agreement.
Solvency Certificate
Solvency Certificate of an amount 20 % of the tender estimated cost shall be
enclosed with technical bid. Bank Solvency shall not be older than one-year period
as on the last day of the month previous to the one in which Tender are invited. If
he fails to produce such certificate his tender will not be considered.
Documents / Information to be submitted along with Volume – I (Technical
The following documents/information must be submitted by the tenderer in
duplicate along with Volume-I of the tender.
i. A certificate of registration as approved Contractor.
ii. A receipt for a deposit as earnest money or bank guarantee.
iii. An Income-tax clearance certificate for the last three financial years.
iv. A solvency certificate.
v. Details of the work of similar type and magnitude carried out by the
tenderer including names of the authorities for which works were
Bidders not submitting the above mentioned information along with their tenders as
per clause above, the tender will not be considered for evaluation and the bid will be
outright rejected.
Bidder to note that the time being essence of contract, mechanical means of
excavation will have to be used to the maximum extent and quote accordingly.
Contractor to read this clause carefully:
Department of Labour and Employment, Government of Gujarat, Sachivalaya,
Gandhinagar, Vernacular Resolution No.RGR-102003-966- 2 (2) dated 04-07-
As required under the above resolution bidders are requested to give assurance
about how many Skilled, Unskilled and other categories of personnel / workers
they will employ on this work. If the bidders fail to give assurance about this,
his tender will not be considered. Contractor will have to submit quarterly
report to AMC, which will be submitted to Department of Labour and
Employment regarding the employment given to different categories of
personnel under this work based on the details submitted by the tenderers. (As
per Schedule B.6.9attached)
All Circular relating to the works published on the AMC web sites will be
Signature of Contractor Additional City Engineer (Water Project)
Name : Ahmedabad Municipal Corporation
Company’s seal :
A.4.23 FORMS FORM ‘A’
FORMATE FOR BANK GUARANTEE FOR EARNEST MONEY
[1] In consideration of the Terms and Conditions of the tender invited by
Commissioner, Ahmedabad (hereinafter called” Ahmedabad Municipal
Corporation”) and ………………………….(Contractor) (hereinafter Called
“Contractor” for the work of ………………………… (Name of Work) for
the ……………………….deposit for the due fulfillment by the Contractor of
the terms and condition contained in said tender, We bank of
………………(Hereinafter referred to as the bank) at the request of
…………………………… (Name of Contractor) do hereby undertake to Pay the
Ahmedabad Municipal corporation an Amount not exceeding Rs…………………… (
Total Earnest Money Deposit Amount) against any loss or damage casual to or
suffered by Ahmedabad Municipal Corporation by reason of any breach of any terms
or condition contained in the said tender by the said Contractor.
[2] We bank of ………………………………. Do hereby undertake to pay the
amount due and payable under this Guarantee without any demur merely on a
demand from the Ahmedabad Municipal Corporation stating that the amount
claimed in due by way of loss of damage caused to or would be caused to or
suffered by the Ahmedabad Municipal Corporation by the reason of breach by
the said contractor’s failure to perform. Any such demand made on the Bank
shall be conclusive as regards the amount due and payable by the Bank under
this guarantee shall be restricted to an amount not exceeding
Rs………….……… (Total of Amount of Earnest Money Deposit).
[3] We undertake to pay the Ahmedabad Municipal Corporation any money to
demanded notwithstanding dispute or dispute raised by the contractor. In any
suit of proceeding Pending before any court or Tribunal relating thereto, our
liability under this presents being absolute and unequivocal. The payment so
made by under and the contractor shall have no claim against us for making
[4] We bank of …………………….., ……………………… further agree that the
guarantee herein contained shall remain in full force and effect during the
period that would be taken for the final award of contract of the said work and
that under or by virtue of said tendered work have been fully finalized and its
claim satisfied or discharged or till Commissioner, Ahmedabad Municipal
Corporation, Ahmedabad clarified that the terms and conditions of the said
tender have been fully and properly finalized by the said contractor and
accordingly discharge this guarantee. Unless a demand or claim under this
tender is made on to us in writing on or before (dt.) ……………….. we shall
be discharged from all liability under this Guarantee thereafter.
[5] We bank of ……………………………………………….. further agree with
the Ahmedabad Municipal Corporation that the Ahmedabad Municipal
Corporation Shall have the fullest liberty without our consent and without in
any manner our obligations hereunder to vary any of the terms and condition
of the said tender or to extend the time of performance by the said contractor
from time to time or to postpone for any time or time to time any of the power
exercisable by the Ahmedabad Municipal Corporation against the said
contractor and to force or enforce any of the terms and conditions relating to
the said agreement and we shall not be relieved from our liability by reason of
any variation or extension being granted to the said contractor or for any
forbearance, act or omission on the part of the Ahmedabad Municipal
Corporation or any indulgence by the Ahmedabad Municipal Corporation to
the said contractor or by any such matter or thing whatsoever which under the
law relating to sureties would but for this provision would relieve us.
[6] This guarantee will not be discharged due to the change in the constitution of
the bank or the contractor.
[7] We bank of ……………………………………………… lastly under take not
to revoke during its currency except with the previous consent of the
NOT WITH STANDING ANYTHING CONTAINED HERE IN ABOVE:
[1] Our liability under this bank guarantee is restricted to Rs. ………….. (Amount
of …………………….Deposit)
[2] This Bank guarantee is valid up to …………………
[3] Our liability to make payment shall arise and we are liable to pay the
guarantee amount or any part there in under this guarantee, only if served upon
us a written Claim or demand in terms of the guarantee on or before
THIS BANK GUARANTEE IS ENCASHABLE AT OUR BRANCH OFFICE
[4] In written of bank has executed this present the day and year first written.
Dated …………Day of ………………2023.
For …………….. (Bank Name)
Seal, stamp and signature of
Bank‘s authorized Signatory
FORMATE FOR BANK GUARANTEE FOR SECURITY DEPOSIT
[1] In consideration of the terms and condition of the tender invited by
Commissioner, Ahmedabad Municipal Corporation, Ahmedabad (hereinafter
called “Ahmedabad Municipal Corporation” ) and ………………(Contractor)
(hereinafter Called “Contractor” for the work of………………………
………………………(Name of Work) for the ……………………….deposit
for the due fulfillment by the Contractor of the terms and condition contained
in said tender, We bank of ………… (Hereinafter referred to as the bank) at
the request of …………………………… (Name of Contractor) do hereby
undertake to Pay the Ahmedabad Municipal corporation an Amount not
exceeding Rs…………………… ( Total Earnest Money Deposit Amount)
against any loss or damage casual to or suffered by Ahmedabad Municipal
Corporation by reason of any breach of any terms or condition contained in
the said tender by the said Contractor.
[2] We bank of ………………………………. Do hereby undertake to pay the
amount due and payable under this Guarantee without any demur merely on a
demand from the Ahmedabad Municipal Corporation stating that the amount
claimed in due by way of loss of damage caused to or would be caused to or
suffered by the Ahmedabad Municipal Corporation by the reason of breach by
the said contractor’s failure to perform. Any such demand made on the Bank
shall be conclusive as regards the amount due and payable by the Bank under
this guarantee shall be restricted to an amount not exceeding Rs…………. (
Total of Amount of Earnest Money Deposit).
[3] We undertake to pay the Ahmedabad Municipal Corporation any money to
demanded notwithstanding dispute or dispute raised by the contractor. In any
suit of proceeding Pending before any court or Tribunal relating thereto, our
liability under this presents being absolute and unequivocal. The payment so
made by under and the contractor shall have no claim against us for making
[4] We bank of …………………….., ……………………… further agree that the
guarantee herein contained shall remain in full force and effect during the
period that would be taken for the final award of contract of the said work and
that under or by virtue of said tendered work have been fully finalized and its
claim satisfied or discharged or till Commissioner, Ahmedabad Municipal
Corporation, Ahmedabad clarified that the terms and conditions of the said
tender have been fully and properly finalized by the said contractor and
accordingly discharge this guarantee. Unless a demand or claim under this
tender is made on to us in writing on or before (dt.) ……………….. we shall
be discharged from all liability under this Guarantee thereafter.
[5] We bank of ……………………………………………….. further agree with
the Ahmedabad Municipal Corporation that the Ahmedabad Municipal
Corporation Shall have the fullest liberty without our consent and without in
any manner our obligations hereunder to vary any of the terms and condition
ofthesaidtenderortoextendthetimeofperformancebythesaidcontractor
from time to time or to postpone for anytime or time to time any of the power
exercisable by the Ahmedabad Municipal Corporation against the said
contractor and to force or enforce any of the terms and conditions relating to
the said agreement and we shall not be relieved from our liability by reason of
any variation or extension being granted to the said contractor or for any
forbearance, act or omission on the part of the Ahmedabad Municipal
Corporation or any indulgence by the Ahmedabad Municipal Corporation to
the said contractor or by any such matter or thing whatsoever which under the
law relating to sureties would but for this provision would relieve us.
[6] This guarantee will not be discharged due to the change in the constitution of
the bank or the contractor.
[7] We bank of ……………………………………………… lastly under take not
to revoke during its currency except with the previous consent of the
Ahmedabad Municipal Corporation in Writing.
NOT WITH STANDING ANYTHING CONTAINED HERE IN ABOVE:
[1] Our liability under this bank guarantee is restricted to Rs. ………….. (Amount
of …………………….Deposit)
[2] This Bank guarantee is valid up to …………………
[3] Our liability to make payment shall arise and we are liable to pay the
guarantee amount or any part there in under this guarantee, only if served upon
us a written Claim or demand in terms of the guarantee on or before
THIS BANK GUARANTEE IS ENCASHABLE AT OUR BRANCH OFFICE
[4] In written of bank has executed this present the day and year first written.
Date the…... Month…... Year……….… for …………. (Bank Name).
Seal, stamp and signature of
Bank‘s authorized Signatory
INCOME-TAX CLEARANCE CERTIFICATE
1. Names and style (of the Company, Firm, HUF or Individual) in which the applicant is
assessed or assessable to Income-tax and the addresses for the purpose of assessment:
2. Names and addresses of all Companies, Firms or Associations or persons in which the
applicant is substantially interested in his individual or fiduciary capacity.
3. The Income-tax Circle/Ward/District in which the applicant is assessed to income-tax.
4. The following particulars are to be furnished concerning the Income Tax Assessments
for the preceding four years:
(a) The total contract amount received during the preceding four accounting years
(give date of the closing day of the year being previous year).
(b) Year Total Income Tax demanded, Tax paid, Balance due Tax assessed.coy of
last income tax filed by the bidder.
(i) Tax in Columns 3 and 4 should include all items viz. Income-tax, Sales
Tax, Surcharges, Excess Profit Tax and Port Tax, etc.
(ii) If any tax remains unpaid, the reasons should be explained in an
attached statement.
(c) In case there has been no income-tax assessment in any year, whether returns
have been submitted under Section 22 (1) or 22(2) or tax has been paid in
advance under Sections 18(A) (3) of the Act and if so, the amount of income
returned for each year and tax for each of the four years mentioned above and
the name of Income-tax Circle/Ward/District concerned where such returns
have been paid. Give reasons why the income-tax is not assessed.
(d) Whether any attachment or certificate proceedings pending in respect of the
(e) The name and address of Branch(es), if any.
I declare that the above information is correct and complete to the best of my
information and belief.
Signature of the Contractor
Registered No. Signature
In my opinion, the assesses mentioned above has been doing everything possible to pay the
tax demanded promptly and regularly and to facilitate the completion of the pending
This will remain valid for one year from the date of issue.
Signature of the Income-tax officer
INCOME TAX CLEARANCE CERTIFICATE
1. Name of style (of the Company,
Firm, HUF or Individual) in which
The tenderer is assessed or
Assessable to Income-tax and the
Addresses for the purpose of assessment
2. Name of address of all Companies,
Firms or Associations of persons
In which the applicant is substantially
interested in his individual
Fiduciary capacity.
3. The Income-Tax Circle/Ward/District
In which the tenderer is assessed to
4. Reference number of the assessment
and assessment year
Address: Signature of the Firm
Names and private residential
Addresses of the partners
Constituting the firm:
(Tenderer to strike out whichever is not applicable)
PERFORMANCE BOND
(See Clause No.1(b))
(The date of this bond must not be prior to the date of the instrument in connection with
which it to given)
Principal (Consultancy)
Sum of bond (Express in words and figures)
Contract No. And Date Of Contract
KNOW ALL MEN BY THESE PRESENTS, THAT WE,
THE PRINCIPALS AND SURETY
above mentioned are held and firmly bound unto the Municipal Commissioner, AMC,
Ahmedabad, owner of the work of Misc. Repair and Maintainance works of Different
Water Distribution Station of South West Zone and other zones in under Water Project
Dept. A.M.C called the "employer" in the amount stated for payment of which sum, well and
truly to be made, we bind ourselves, our heirs, executors, administrators and successors
jointly and severally, firmly by these presents subject to the provisions of which the afore
said contract on demand and without demand on a claim being made by the "employer".
THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the principals herein
after called contractor viz. have entered into a contract with the Employer numbered and
dates as shown above and hereto attached for the execution of work.
NOW THEREFORE, if the principal shall well and truly perform and fulfill all the under
takings, covenants, terms, conditions and agreements, of said contract during the original
terms of the said contract and any extensions thereof, they may be granted by the employer
with or without notice to the surety and during the lift of any guarantee required under the
contract and shall also well and truly perform, and fulfill all the undertakings, contract, terms,
conditions and agreements of any and all duly authorized modifications of said contract that
may hereafter be made, notice of which modifications to the surety being hereby waived or
shall pay over, make good and reimburse to the employer all losses and damages which the
employer may sustain by reason of failure or default on the part of said principal so to do.
We further agree that guarantee
herein contained shall remain in full force and affect during the period that would be
taken for the validity of the said contract and that it shall
continue to be enforceable till all the dues of the employer under or by virtue of the
contract have been fully paid and its claims satisfied of discharged or till the
Employer certifies that the terms and conditions of the contract have been fully and
properly carried out by the said contractor and accordingly discharges the guarantee.
Unless a demand or claim under this guarantee is made on us in writing on or before
the we shall be discharged from all liability
under this guarantee thereafter.
IN WITNESS WHEREOF the above bounded parties have executed this instrument
under their several on the date indicated above the name and corporate seal of each
corporate party being hereto affixed and these presents duly signed by its
undersigned representative, pursuant to authority of its governing body.
In the presence of witness Individual Principal
1. as to (Seal)
2. as to (Seal)
3. as to (Seal)
4. as to (Seal)
Attested Corporate Surety
Business Address
For and on behalf of the employer
AHMEDABAD MUNICIPAL CORPORATION
LIST OF APPROVED BANKS
A-5: QUALIFICATION CRITERIA FOR TENDERERS
Eligibility Criteria
Qualification will be based on meeting all the following minimum pass/fail criteria
regarding the bidder’s general and particular experience, personnel and equipment
capabilities, and financial position, as demonstrated by the bidder’s responses in the
forms attached. The bidder should be registered in ‘D’ class with AMC, State and
Central Government and other Corporations / Boards. The AMC reserves the right
to waive minor deviations, if they do not materially affect the capability of a bidder
to perform the contract. Sub-contractor’s experience and resources shall not be
taken into account in determining the bidder’s compliance with the qualifying
Financial Criteria:
(1) The bidder shall have the financial capability and having an average annual turnover
of last three years of minimum 30% of the estimated cost. Bidder also to enclose
reports on its financial standing, such as profit and loss statements and auditor’s
reports, for the past three years.
Note: Financial turnover of previous years shall be given weightage of 10% per year
based on rupee value to bring them to 2023-24 price level.
(2) The audited balance sheets for the last three years shall be submitted.
(3) The net worth shall be positive as of last financial year ending 31st March.
(4) Bid capacity – Bidders, who meet the minimum qualification criteria, shall be
qualified only if their available bid capacity is more than the total estimated value of
the works for which he has offered his bid (Appendix-C). The available bid capacity
will be calculated as under:
Assessed available bid capacity = (2*A*N - B)
A = Maximum value of works executed in any one year during the
last three years (updated to 2023-2024 price level) taking into account
the works completed as well as works in progress.
N = Number of years prescribed for completion of the works for
which bids are invited.
B = Value, at 2023-2024 price level, of existing commitments and
on going works to be completed during the ‘N’ years. i.e. 2 years
Note: The statements/certificate showing the value of existing commitments and ongoing
works as well as the stipulated period of completion remaining for each of the works
listed should be provided. The bidder shall submit an undertaking on Rs. 300/-
Stamp Paper declaring that the details submitted by bidder are correct.
(5) Contractor should have registration with employees provident fund organization.
Note: Financial turnover and cost of completed works of previous years shall be
given weightage of 10% per year based on rupee value to bring them to 2023-
24 price level.
Following enhancement factors will be used for the cost of works executed and the
financial figures to a common base value for works completed in India. For works
completed abroad the latest currency conversion rate will be applied Enhancement
factor will be applied from the next year of completion of work.
Financial Years Multiplying
Base year of inviting Last date of submission
tender (2023-2024)
One year 2025-2026
Two year 2024-2025
Three year 2023-2024
Four year 2022-2023
Five year 2021-2022
Six year 2020-2021
Seven year 2019-2020
Applicant will indicate actual figures of costs and amounts in the schedule without
accounting for the above mentioned factors.
Solvency Certificate of an amount 20 % of the tender estimated cost shall be
enclosed with technical bid. Bank Solvency shall not be older than one-year period
as on the last day of the month previous to the one in which Tender are invited. If
he fails to produce such certificate his tender will not be considered.
General Experience
The bidder shall meet with following minimum criteria:
i) The bidders shall have the financial capability and having annual average turnover
for last 3 years should be minimum 30% of the estimated cost.
ii) Experience of having successfully completed similar works (Maintenance and
Miscellaneous Repairing work in Water Distribution Stations & Building work ) in
last 7 (seven) years as under:-
a. Three similar completed works ((Maintenance and Miscellaneous Repairing
work in Water Distribution Stations & Buildings work ) each costing not less
than the amount equal to 40% of the estimated cost.
b. Two similar completed works ((Maintenance and Miscellaneous Repairing
work in Water Distribution Stations & Buildings work ) each costing not less
than the amount equal to 50% of the estimated cost.
c. One similar completed works ((Maintenance and Miscellaneous Repairing
work in Water Distribution Stations & Buildings work ) each costing not less
than the amount equal to 80% of the estimated cost.
Please note that only tender fees, EMD, registration certificate, Affidavits,
Undertaking / MOU and Addenda shall be submitted in hard copy with
bidder forwarding letter in sealed envelopes.
Copies of Similar type of works carried, works on hands, details of technical
Personnel, financial capacity, bidding capacity and required details in
Schedules(Format) given in Section–B6 and all other required tender
documents for tender evaluation duly filled as specified in tender must be
uploaded Online.
Technical Bid in Hard copy shall be submitted only by Successful bidder’s
upon intimation from AMC.”
The Technical envelop (comprising of EMD & Tender Fees, registration
certificate, Affidavits, Undertaking and Addenda only) shall be submitted in
sealed envelopes as described, so as to reach on or before the date and time
mentioned in tender notice by Registered AD Post/ Speed Post/ Hand
Delivery/ Courier.
Solvency Certificate
Solvency Certificate of an amount 20 % of the tender estimated cost shall be
enclosed with technical bid. Bank Solvency shall not be older than one-year period
as on the last day of the month previous to the one in which Tender are invited. If
he fails to produce such certificate his tender will not be considered.
Joint Ventures -Delete
LITIGATION HISTORY:
The bidder should provide accurate information on any litigation history or
arbitration resulting from contracts completed or under execution by him over the
last ten years. This should also include such cases, which are in process / progress.
A consistent history of awards against the bidder may result in failure of the bid. In
case the bidder has not provided such information and has come to the notice of the
authority, the tender will be rejected at what so ever stage and in such case all the
losses that will arise out of this issue will be recovered from the tenderer /
contractor and he will not have any defense for the same .
Municipal Commissioner, AMC reserves the right to accept or reject any or all the
tenders without assigning any reasons and also reserves the right to ask the agency
for submission of any data which requires after bidding.
THE BIDDER SHALL HAVE TO FULFILL THE ENTIRE MINIMUM
REQUIREMENTS AS MENTIONED ABOVE FOR ALL THE CRITERIA
OF FINANCE, EXPERIENCE AND TECHNICAL. TECHNICAL
EVALUATION WILL BE MADE ON PASS / FAIL BASIS.
ONE BID PER BIDDER
a) Each bidder shall submit only one bid. A bidder who submits or participates
in more than one bid will cause all those bids to be rejected.
COST OF BIDDING:
a) The bidder shall bear all costs associated with the preparation and submission
of its bid and the Employer will in no case be responsible or liable for those costs.
a) The bidder is advised to visit and examine the Site of Works and its
surroundings and obtain for itself on its own responsibility all information
that may be necessary for preparing the bid and entering into a contract for
the design-build and completion of the Works. The costs of visiting the Site
/ testing if required or any other cost shall be at the bidder's own expense.
b) The bidder and any of its personnel or agents will be granted permission by
the Employer to enter upon its premises and lands for the purpose of such
inspection, but only upon the express condition that the bidder, its personnel
and agents, will release and indemnify the Employer and its personnel and
agents from and against all liability in respect thereof and will be
responsible for death or personal injury, loss of or damage to property and
any other loss, damage, costs and expenses incurred as a result of the
c) The Employer may conduct a site visit concurrently with the pre-bid
meeting, if possible.
Contractor’ Sign Additional City Engineer
Date:- (Water Project)
DETAILS OF SKILLED, UNSKILLED AND OTHER CATEGORIES
OF PERSONNEL / WORKERS
TO BE EMPLOYED FOR THIS CONTRACT
(QUARTERLY PROGRESS REPORT TO BE SUBMITTED
BY THE CONTRACTOR)
Description of Category No. Remarks
3. Other Personnel / Workers
B-1: SPECIAL INSTRUCTIONS TO TENDERERS
B-2 : GENERAL CONDITIONS OF CONTRACT
B-3 : SCHEDULE – ‘B’
B-4 : GENERAL INSTRUCTIONS
B-5 : ANNEXURES
B-6 : SCHEDULES
SECTION - B : GENERAL CONDITIONS OF CONTRACT
Sr. Description Page No.
B.1 Special Instructions to Tenderers B-1/1
B.1.1 Notice inviting tender B-1/2
B.1.2 Additional instructions to persons tendering B-1/4
B.1.3 Declaration Form B-1/5
B.1.4 General rules and directions for the guidance of Tenderers B-1/6
B.1.5 Tender for works B-1/10
B.1.6 Memorandum B-1/10
B.2 General Conditions of Contract
B.2.1 Security Deposit B-2/1
B.2.2 Liquidated damages for delay B-2/1
B.2.3 Default by Contractor B-2/2
B.2.4 Action when the progress of any particular portion of the work B-2/3
isunsatisfactory
B.2.5 Contractor remains liable to pay compensation if action not B-2/3
taken under Clauses B.2.3 and B.2.4.
B.2.6 Extension of time limit B-2/5
B.2.7 Final certificate B-2/5
B.2.8 Payments on intermediate certificate to be regarded as advance B-2/6
B.2.9 Payment at reduced rates on account of items of work not B-2/6
accepted as completed to be at the discretion of the Engineer-
B.2.10 Bills to be submitted monthly B-2/6
B.2.11 Bills to be on printed forms B-2/6
Sr. Description Page No.
B.2.12 Stores supplied by Municipal Corporation B-2/6
B.2.13 Works to be executed in accordance with specifications, B-2/8
drawings, orders etc.
B.2.14 Alterations in specifications and designs not to invalidate B-2/9
B.2.15 No claim to any payment or compensation for, alteration in or B-2/10
restriction of work.
B.2.15A No claim to compensation on account of loss due to delay in B-2/10
supply of materials by Municipal Corporation
B.2.16 Time limit for unforeseen claims B-2/10
B.2.17 Action and compensation in case of bad work B-2/11
B.2.17A Defect Liability Period B-2/11
B.2.17B Maintenance and repairs of the road during guaranteed period B-2/12
B.2.18 Works to be open to inspection, contractor or responsible agent B-2/12
B.2.19 Notice to be given before work is covered up B-2/13
B.2.20 Contractor liable for damage and for imperfections for three B-2/13
months after completion certificate.
B.2.20A Force Majeure B-2/13
B.2.21 Contractor to supply plant, ladders, scaffoldings etc. and is B-2/13
liable for damage arising from non-provision of lights, fencing
B.2.22 Measures for prevention of fire B-2/16
B.2.23 Liability of Contractor for any damage done in or outside work B-2/16
B.2.24 Deleted B-2/17
B.2.25 Deleted B-2/17
B.2.26 Work not to be sublet, contract may rescinded and security B-2/17
deposit forfeited for subletting it without approval or for
bribing a public officer or if contractor becomes insolvent.
Sr. Description Page No.
B.2.27 Sum payable by way of compensation to be considered as B-2/17
reasonable compensation without reference to actual loss.
B.2.28 Changes in the constitution of firm to be notified. B-2/17
B.2.29 Works to be under direction of Dy. Municipal Commissioner B-2/17
B.2.30 Disputes B-2/18
B.2.31 Deleted B-2/19
B.2.32 Lump sum in estimates B-2/19
B.2.32A Access to site B-2/19
B.2.33 Action where no specifications B-2/19
B.2.34 Definition of work B-2/19
B.2.35 Contractor's percentage whether applied to net or gross amount B-2/19
B.2.36 Non refund of quarry fees and royalties B-2/20
B.2.37 Compensation under the workmen’s compensation act B-2/20
B.2.37A Medical aid to workmen B-2/20
B.2.37B Safety and first aid B-2/20
B.2.38 Claim for quantities of work entered in the tender or estimate. B-2/20
B.2.39 Employment of famine or other labour. B-2/21
B.2.40 Claim for compensation for delay in starting the work. B-2/21
B.2.41 Claim for compensation for delay in the execution of work. B-2/21
B.2.42 Entering upon or commencing any portion of work. B-2/21
B.2.43 Minimum age of persons employed, the employment of B-2/21
donkeys and or other animals and the payment of fair wages.
B.2.44 Method of payment B-2/22
B.2.45 Deleted B-2/22
B.2.46 Employment of scarcity labour B-2/22
Sr. Description Page No.
B.2.47 Deleted B-2/23
B.2.48 Rates inclusive of sales tax B-2/23
B.2.49 Local labour from employment exchange. B-2/23
B.2.50 Fair wages B-2/23
B.2.51 Deleted B-2/23
B.2.52 List of machinery B-2/23
B.2.53 Power roller on rental basis B-2/23
B.2.54 Local labour on normal rates B-2/23
B.2.55 Deleted B-2/23
B.2.56 Vaccination B-2/24
B.2.58 Gumboots B-2/27
B.2.59 Distinction between Harijan B-2/27
B.2.60 Price variation B-2/27
B.2.60A Price variation for cement, steel and asphalt B-2/27
B.2.61 Fencing and lighting B-2/28
B.2.62 Liability of accidents to persons B-2/29
B.2.63 Access to site and work on site B-2/29
B.2.64 Reports regarding labour B-2/29
B.2.65 Treasure trove B-2/30
B.2.66 Indemnity B-2/30
B.2.67 Insurance of labourers B-2/30
B.2.68 Setting out B-2/31
B.2.69 Cement register B-2/31
Sr. Description Page No.
B.2.70 Materials and works test registers B-2/31
B.2.71 Progress schedule B-2/31
B.2.72 Secured advance to contractor B-2/32
B.2.73 Advance payment B-2/32
B.2.74 Advance against machineries B-2/32
B.2.75 Mobilization advance B-2/32
B.2.76 Deleted B-2/32
B.2.77 Deleted B-2/32
B.2.78 Deleted B-2/32
Schedule – A B-2/32
Schedule – B B-2/33
Schedule – C B-2/35
B.3 Schedule – B B-3/1
B.4 General instructions B-4/1 to B-4/2
B.5 Annexures-1 B-5/1
B.6.1 Details of the works of similar type and magnitude carried out B-6/1
by the Tenderers
B.6.2 Details of the works in hand and works tendered for as on the B-6/2
date of submission of the tender
B.6.3 Details of technical personnel with tenderer who are proposed B-6/3
for this contract (Deleted)
B.6.4 Information regarding financial capacity of the Tenderers B-6/4
B.6.5 Details of the equipment in possession of the contractor and the B-6/5
equipment, he proposes to bring to the site (Deleted)
B.6.6 Contractor’s schedule for execution of works (Deleted) B-6/6
B.6.7 Bidding capacity (Deleted) B-6/7
B.6.8 Structure and organization (Deleted) B-6/9
B.6.9 Quarterly Progress Report of Skilled, Unskilled and Other B-6/11
personnel / workers to be submitted by the Contractor
B-1: SPECIAL INSTRUCTIONS TO TENDERERS (FORM B – 2)
AHMEDABAD MUNICIPAL CORPORATION
Percentage Rate Tender and Contract for Works
Name of Work: Misc. Repair and Maintainance works of Different Water
Distribution Station of South West Zone and other zones in under Water
Project Dept. A.M.C
Division : AMC (Water Project)
Last date of acceptance of tender online: As per tender inviting Notice.
Opened by: AMC Date:
Additional City Engineer (Water Project)
Ahmedabad Municipal Corporation
NOTICE INVITING TENDERS
1. Tenders are invited for and on behalf of Municipal Commissioner (AMC) for Misc.
Repair and Maintainance works of Different Water Distribution Station of South
West Zone and other zones in under Water Project Dept. A.M.C
2. The works are required to be completed within 12 (Twelve) months including
monsoon period as per the terms of the contract conditions.
3. The Contractors whose names are borne of the approved list of Contractors with
AMC, State and Central Government and other Corporation and Boards in ‘D’ class
and above will be permitted to tender. Not more than one tender shall be submitted by
a Contractor or by a firm of Contractors. No two or more concerns in which an
individual is interested as a proprietor/or partner shall tender for the execution of the
same works. If they do so, all such tenders shall be liable to be rejected.
4. Tenderers are advised to visit the site sufficiently in advance of the date fixed for
submission of the tender. A tenderer shall be deemed to have full knowledge of all the
relevant documents, samples, site etc., whether he inspects them or not.
5. Submission of a tender by a tenderer implies that he has read this notice and all other
contract documents and has made himself aware of the scope and specification of the
work to be done and of conditions and rates at which stores, tools and plant etc., will
be issued to him by Government and local conditions and other factors bearing on the
execution of the works.
6. A tenderer should quote in figures as well as in words the percentage of rate tendered.
The amount should be worked out and the requisite total given.
7. Percentage shall be quoted online.
8. The tender for the works shall not be witnessed by a Contractor or Contractors who
himself/themselves has/have tendered or who may and has/have tendered for the same
works. Failure to observe this condition shall render the tender of the contractor
tendering, as well as of those witnessing the tender, liable to rejection.
9. Tender shall be received online as explained earlier.
10. The tender shall be accompanied by earnest money of Rs. 79665/-by Demand Draft /
Bank Guarantee/Pay Order issued in favour of Municipal Commissioner by a
scheduled bank or from banks as per the list attached of approved banks of
Ahmedabad Municipal Corporation the amount being credited to Ahmedabad
Municipal Corporation.
11. A tenderer shall submit the tender which satisfies each and every condition laid down
in this notice and tender documents, failing which, the tender will be liable to be
12. The Ahmedabad Municipal Corporation does not bind himself to accept the lowest or
any tender or to give any reasons for his decision.
13. This notice of tender shall form part of the contract documents.
For and on behalf of Ahmedabad Municipal Corporation
Date……….. Signature…………..
Designation…………….
ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING
1. Competency of Tenderer–
No contract will be awarded except to responsible bidders capable of performing the
class of work contemplated. Before the award of the contract, any bidder may be
required to show that he has the necessary facilities, experience, ability and financial
resources to perform the work in satisfactory manner within the time stipulated.
Contractor may be required to furnish the corporation with the statement as to their
experience and their financial status.
2. Tenderer will be deemed to have inspected the site and to have satisfied himself as to
the nature of all works, all existing roads, water-way and other means of
communication and access to and from the site and work and the building that may be
required for temporary purpose in connection with the construction, completion and
maintenance of the works and must make his own enquiries as to work, yard sites and
depot, and dumps and as to acquisition of such additional sites and areas as may be
necessary for temporary purpose for constructing, completing and maintaining the
The tenders shall be received under “Registered Post or Speed Post or Courier or Hand
(i) Late tenders (i.e. tender received after the specified time of opening), delayed
tenders (i.e. tenders received before the time of opening but after due date and
time of receipt of tenders) and post tender offers shall not be opened and
considered at all.
(ii) The tenders received (by registered post) after the time and the date specified
in the tender notice shall not be received by the concerned office from the
postmen, for which, date and time may be recorded on the cover of the tender
as to when tender was refused by the Assistant Manager or the Administrative
Head or any other person incharge.
(iii) Necessary records should be maintained for refusal of such tenders in the
registers for receiving tenders and should be initialed by the Addl. City
Engineer (Water Project)
The tenderer must understand clearly that the percentage rates quoted are for
completed works and include all costs due to labour, scaffolding plant, supervision,
service work, power, taxes, royalties and octroi etc. and to include all extras to cover
the cost of night work if and when required and no claim for additional payment
beyond the price/rates quoted will be entertained and the tenderers will not be entitled
subsequently to make any claim on the ground of misrepresentation or on the ground
that he was supplied with information given by any person (whether the member is
the employee of Ahmedabad Municipal Corporation or not). Any failure on his part to
obtain all necessary information for the purpose of making his tender and filling the
percentage rates therein shall not relieve him from any risks or liabilities arising out of
or consequent upon the submission of the tender.
4. Tender Forms–
Every ‘blank’ in the form of tender and in the schedule must be filled up by the
tenderer and must return the document sent herewith.
Persons tendering are informed that no erasures or alterations by them in the text of
the document sent herewith will be allowed and any such erasures or alterations will
be disregard. If there is any error in writing, no overwriting should be done, the wrong
word or a figure should be struck out and the correct one written above or near it in
unambiguous way. Each correction should be initialed.
Contractors to Please Read This Carefully:
1. The Percentage in Schedule ‘B’ must be given in words and figures. Amount thus
worked out must also be entered in column.
2. If the tender is taken in favour of the company, a power of attorney in favour of the
person who may have signed the tender for the company must accompany the tender.
3. Solvency certificate of a Bank or a Revenue Officer of an amount upto 20% of the
tendered cost plus the amount of works on hand still to be executed will have to be
produced by the Contractor.
4. Challan for earnest money of Rs. 79665/-must accompany the tender. The amount of
earnest money can be offered by the contractor, at his choice, in the form of Bank
Guarantee/Demand Draft of the scheduled bank or from banks as per the list attached
of approved banks by Ahmedabad Municipal Corporation.
If the contractor do not turn up to pay the Security Deposit and execute contract
agreement within specified (or extended) time after intimation to him amount
acceptance of his offer, the earnest money paid for this work will be forfeited and his
registration will be held in abeyance for three years.
DECLARATIONFORM
(i) I/ We hereby declare that I / We have visited the site and fully acquainted myself /
ourselves with the local situations regarding materials, labour and other factors
pertaining to the work before submitting this tender.
(ii) I / We hereby declare that I / We carefully studied the conditions of contract,
specifications and other documents of this work and agree to execute the same
Declaration Certificate
(iii) I / We hereby declare that my / our near relatives are not working in Ahmedabad
Municipal Corporation as an Additional City Engineer, Dy. City Engineer, Assistant
City Engineer, Assistant Engineer, Additional Assistant Engineer, Supervisor,
Overseer, Divisional Accountant, Store Keeper, Manager as on today.
GENERAL RULES AND DIRECTIONS FOR THE
GUIDANCEOFCONTRACTORS
1.0 All works proposed to be executed by the contractor shall be notified in a form of
invitation to tender pasted on a board hung up in the office of the Addl. City Engineer
(Water Project) and signed by him.
This form will state work to be carried out as well as the date of submitting and
opening tenders and the time allowed for carrying out the work also the amount of
earnest money to be deposited with the tender and the amount of the security deposit
to be paid by the successful tenderer and percentage, if any, to be deducted from bill.
It will also state whether a refund of quarry fees, royalties, octroi dues and ground
rents will be granted. Copies of the specifications, designs and drawings and
estimated rates, and any other documents required in connection with work which
shall be signed by the Addl. City Engineer (Water Project) for the purpose of
identification, shall also be open for inspection by contractors at the office of the
Addl. City Engineer (Water Project) during office hours.
Where the works are proposed to executed according to the specifications
recommended by a contractor and approved by a competent authority on behalf of the
Ahmedabad Municipal Corporation, such specifications with designs and drawings
shall form part of the accepted tender.
2.0 In the event of the tender being submitted by a firm, it must be signed separated by
each partner thereof or in event of the absence of any partner it shall be signed on his
behalf by person holding a power of attorney authorizing him to do so. Details of
partners will be furnished in Annexure – 1 along with the copy of partnership deed.
3.0 Receipts for payment made on account of any work, when executed by a firm, shall
also be signed by all the partners except where the contractors are described in their
tender as a firm in which case the receipts shall be signed in the name of the firm by
one of the partners or by some other person having authority to give effectual receipts
Tender will be submitted online.
(a) All preliminary & technical details required online shall be submitted. The
other documents required in hard copy shall be submitted to AMC in sealed
envelope before prescribed date.
(b) If any price bid contains any conditions the same shall have to be rejected
outright. Document of payment of earnest money or exemption certificate
should accompany the technical bid cover.
(c) The technical bids in sealed cover duly completed as above should be
submitted by the “Registered post Acknowledgement Due or by Speed Post or
by Courier or By Hand Delivery. (only for L-1 Tenderer when ask)
(d) The bidders shall clearly indicate deviations (s) form specifications or the
tender conditions very explicitly in the appropriate section and submit a copy
of the same with the technical bid. It should be very clearly understood by all
tenderers that the technical bid should be restricted only to technical matters
and stipulations of conditions, if any, by tenderer having financial
implications. The prices of main tender should not be disclosed in the technical bid.
(e) The technical bid will be opened first in the presence of those bidders who
remain present. The time and date of opening of price bids will be determined
by the officer who opens the tender, and the same will be intimated to the
bidders, if required after the technical bid proposals are opened and analyzed
and all clarifications / price variations, if any, obtained.
(f) The conditions specified in technical bid should invariably be accompanied by
proper financial evaluation with mode of calculation specifying assumptions,
quantities, rate and ceiling amounts for each condition and shall also
accompany the information in the form stating (a) Sr. No. (b) Description of
the condition (c) financial evaluation (vide R & B D.G.R. No. / TNC / 7777 /
281-C dated 30-09-92 (d) ceiling amount to be added in price bid, on case
condition is not accepted.
(g) Ceiling amounts shall be binding on the contractors and are liable to be added
to the tender amount.
(h) It is necessary that the contractor or his authorized representative remains
present at the time of opening of technical bid as specified in (e) above, so that
wanting details and clarifications in respect of conditions can be furnished by
him or conditions withdrawn on the spot by him. If the technical bid is
incomplete in respect of any of the details referred to in sub-clauses 2 (f)
above, and the contractor does not furnish the wanting details as required
above on the spot in the presence of other bidders after opening the technical
bid, the tender would be liable to rejection.
(i) The evaluation as given by the contractor as modified by tender opening
authority with the ceiling limit will then be intimated to all the bidders who
remain present and then, if convenient, the price-bid shall be opened on the
same day and the combined evaluation of the tender of price bid and the
technical bid would be worked out. No further opportunity shall be given to
the Contractors to modify / withdraw conditions at that stage as the price bid
would be known to all. Ahmedabad Municipal Corporation however, reserves
the right to negotiate about the tender (s) further with any or all the
contractors. In case the price bids cannot be opened on the same day then
another date will be intimated to the tenderers as in para (e) above.
5.0 The Addl. City Engineer (Water Project) or his duly authorized. Assistant shall open
tenders in the presence of any intending contractors who have submitted tenders or
their representatives who may be present at the time and he will enter the amounts of
the several tenders in a comparative statement in an suitable form. In the event of a
tender being accepted, the contractor shall, thereupon, for the purpose of
identification, sign copies of the specifications and other documents mentioned in
this tender. In the event of tender being rejected, the Officer shall authorize the
Officer concerned to refund the amount of the earnest money deposited, to the
contractor making the tender on his giving a receipt for the return of the money.
6.0 The Officer competent to dispose of the tenders shall have the right of rejecting all or any
of the tenders.
7.0 No receipt for any payment alleged to have been made by a contractor in regard to
any matter relating to this tender of the contract shall be valid and binding on
Corporation unless it is signed by the Addl. City Engineer (Water Project)
8.0 The memorandum of the work to be tendered for and the schedule of materials to be
supplied by Ahmedabad Municipal Corporation and their rates shall be filled in and
completed by the office of the Addl. City Engineer (Water Project) before the tender
form is issued. If a form issued to an intending tenderer has not been so filled in and
completed, he shall request the said officer to have this done before he completes and
delivers his tender.
9.0 All works shall be measured net by standard measure and according to the rules and
customs of the Ahmedabad Municipal Corporation without reference to any local
10.0 Under no circumstances shall any contractor be entitled to claim enhanced rate for any
items in this contract.
11.0 Every contractor shall, unless exempted in writing by the Concerned Engineer,
produce along with his tender a solvency certificate of his financial ability from the
collector of the District within which he resides or a Banker’s certificate. If he fails to
produce such a certificate his tender will not be considered.
12.0 All Corrections and additions or pasted slips should be initialed.
13.0 The measurements of work will be taken according to the usual method in use in the
Ahmedabad Municipal Corporation and no proposals to adopt alternative methods
will be accepted. The Addl. City Engineer (Water Project) decision as to what is ‘the
usual method in use in the Ahmedabad Municipal Corporation’ wills be final.
13.0- A The Insurance Company’s bond will not be accepted against the security deposit.
14.0 The contractor shall have to attach to his tender Income – Tax Clearance Certificate to
be obtained from the Income-Tax Officer.
15.0 The Contractor will have to construct a shed for storing controlled and valuable
materials issued to him under Schedule ‘A’ of the agreement at work-site having
double locking arrangement. The materials will then be taken for use in the presence
of the AMC person. No materials will be allowed to be removed from the site of
16.0 No foreign exchange will be released by the Corporation for the purpose of plant and
machinery required for the execution of the work contracted for.
17.0 Controlled materials (Essentiality Certificate)
(1) As regards controlled materials, the Ahmedabad Municipal Corporation will help
to arrange for the permit as far as possible and help the Contractor in securing the
same. All incidental charges met with in procuring these materials shall be borne
by the Contractor himself. Though the Ahmedabad Municipal Corporation will
help to arrange for the permit as far as possible and help the Contractor in
Obtaining the materials, it shall not accept any responsibility for any delay or loss on
account of delay caused to the Contractor while obtaining the same.
(2) The contractor shall submit to the Addl. City Engineer (Water Project) on close of
every calendar month, the monthly returns in the prescribed forms as to the
receipts and actual use of the controlled materials during the month.
(3) The contractor shall permit the Addl. City Engineer (Water Project) or his
representatives to inspect the stock of the controlled materials stored by him at
any time whenever the Addl. City Engineer (Water Project) of his
representative(s) so desires(s).
18.0 The tender for the work shall remain open for a period of 120 days from the stipulated
date of receiving the tenders for this work and that the tenderer shall not be allowed to
withdraw or modify the offer on his own after handing over the tender to the postal
authorities for dispatch during this period. If any tenderer withdraws or makes any
modifications, or additions in the terms and conditions of this tender not acceptable to
the Ahmedabad Municipal Corporation then the Corporation shall, without prejudice
to any right remedy, be at liberty to forfeit in full the said earnest money absolutely.
In this connection G. R. R. and BD No. TNC-IIB-22-(10)-C dated 14-8-90 should be
19.0 The contractor shall employ only such labourer who shall produce a valid certificate
of having been vaccinated against small pox within a period of last three years.
20.0 (1) If the members of Labour Co-operative Societies do not work themselves and
obtain commission by subletting the work, as a whole or by dividing work in
groups and give work to piece workers, the very purpose of the scheme would
be defeated. Therefore the Labour Co-operative Societies will not sublet the
work and the work will be executed by the member labourers of the society
(2) In case where the works required to be carried out by the labourers other than
the members of the Labour Co-operative Societies with the man days more
than 25% prior permission of the Addl. City Engineer (Water Project) will be
(3) The Labour Co-operative Societies shall have to allow the officers of the
Corporation to examine for audit purpose the muster rolls as and when
(4) Labour Co-operative Societies shall have to submit a quarterly return stating
the monthly attendance of man days on the muster rolls of member labours on
each work to the Addl. City Engineer (Water Project)
(5) If the Labour Co-operative Society is found violating the terms and conditions
mentioned above the labour Co-operative Society will be liable for the
cancellation of work contract and or registration as decided by the Addl. City
Engineer (Water Project)
21.0 Immediately after issue of the work order for the said works the contract shall display
the board showing brief details of the specifications on the site of work (R & B D Gr.
22.0 The buildings under the contract will not be occupied by the contractor for use of the
labourers, staff or for any other purpose. In case of breach of this condition market
rent will be recovered for the area unauthorized occupied.
TENDER FORWORKS
I/We hereby tender for the execution for the Ahmedabad Municipal Corporation
(hereinbefore and hereinafter referred to as Corporation) of the work specified in the
underwritten memorandum within the time specified in such memorandum at
tendered percentage rates entered in Schedule ‘B’ (memorandum showing item of
works to be carried out) and in accordance in all respects with the specifications,
designs, drawings and instructions in writing referred to in this tender and in Clause
13 of the annexed conditions of contract and agree that when materials for the work
are provided by Corporation, such materials and the rates to be paid for them shall be
as provided in Schedule ‘A’here to.
1. Name of Work : Invitation of tenders (Two bid system)for
Misc. Repair and Maintainance works of
Different Water Distribution Station of South
West Zone and other zones in under Water
Project Dept. A.M.C.
2. Earnest Money : Rs.79665/-
3. Validity Period : 120 Days from the last date of Opening of Price
4. Security Deposit : 5%ofthecontractvalueintheformofBankGuarantee
/ Demand Draft Bank guarantee shall be issued from
Ahmadabad Branch Only as per paraA.4.24.
5. Time– Limit : 12 (Twelve)Months including of monsoon period
If the site is not cleared to start the work. The
time limit will be consider from the date of
possession given to start the work.
Delay due to Client Reason.
6. (i) Last date of submission
of the tender online : 29-11-2023 up to 18.00hours
ii) Mode of Sending : a)up to date: 24-06-2026(document fees, EMD
to be submitted in hardcopy person/RPAD/speed
post/courier up to16:00hrs.)
iii) Description essential to
be made on sealed cover: a) Name and No. of Work.
b) Date of receiving tender by corporations.
iv) Mode of quoting rates in
Schedule of rates : Percentage in figures as well as in words.
Should this tender be accepted, I/We hereby agree to abide by and fulfill all the terms and
provision of the conditions of contract annexed hereto so far as applicable and in default
thereof to forfeit and pay to Corporation in Office the sums of money mentioned in the said
(Receipt No _ dated from the Ahmedabad Municipal
Corporation office in respect of sum ofRs.* is forwarded
herewith representing the earnest money + (a) the full value of which is to absolutely for
fitted to Ahmedabad Municipal Corporation should I/We do not deposit the full amount of
security deposit in the above memorandum in accordance with Clauses 1(A) of the said
conditions, otherwise the said sum of Rs. shall be refunded.)
Dated the ……………………….day of …………………..2023
(Witness) ……………………………..
Address……………………………..
(Occupation) ………………………………….
The tender is hereby accepted by me on behalf of the Ahmedabad Municipal Corporation.
Dated the day of
Addl. City Engineer (Water Project) (or his duly authorized Assistant)………..Division
+ strike out (a) if no cash security deposit is to be taken
X Signature of the Contractor before submission of tender.
* Amount to be specified in words and figures
B-2: GENERAL CONDITIONS OF CONTRACT
TERMS & CONDITIONS OF CONTRACT
Clause - 1: Security Deposit
The person / persons whose tender may be accepted (here-in-after called the
‘Contractor’ which expression shall unless excluded by or repugnant to the context include
his heirs, executors, administrators and assignees) shall (within one day for a contract of Rs.
1,000 or less or 2 days for a contract of more than Rs. 1,000 but less than Rs. 2,000 and so on
up to a limit of ten days which can be extended up to 15 days by the Concerned Dy.
Municipal Commissioner, if he thinks it fit to do so for a contract of Rs. 10,000 or more of
the receipt by him of the notification of the acceptance of his tender), deposit with the
Municipal Commissioner in cash or Corporation securities endorsed to the Municipal
Commissioner. Provided always that in the event of the Contractor depositing a lump sum by
way of security deposit as contemplated above, then and in such case, if the sum so deposited
shall not amount to 5 percent of the total contract value of the work, it shall be lawful for
Municipal Corporation at the time of making any payment to the Contractor for work done
under the contract to make up the full amount of 5 percent by deducting a sufficient sum from
every such payment as last aforesaid until the full amount of the security deposit is made up.
All compensation or other sums of money payable by the Contractor to Municipal
Corporation under the terms of this contract may be deducted from, or paid by the sale of a
sufficient part of his security deposit or from the interest arising there from, or any sums
which may be due or may become due by Municipal Corporation to the Contractor on any
account whatsoever, and in the event of his security deposit being reduced by reason of any
such deduction or sale as aforesaid, the Contractor shall, within ten days thereafter, make
good in cash or Government securities endorsed as aforesaid any sum or sums which may
have been deducted from or realized by sale of his security deposit or any part thereof. The
security deposit referred to, when paid in cash may, at the cost of the depositor, be converted
into Interest Bearing Securities provided the depositor has expressly desired this inwriting.
If the amount of the security deposit to be paid in a lump within a period specified
above is not paid, the tender / contract already accepted shall be considered as canceled and
legal steps shall be taken against the contractor for recovery of the amounts. Security Deposit
shall be converted into the Performance Guarantee Bond Valid for the entire defect liability
period to be executed by the contractor after completion of the work and certificate of
completion issued by Engineer that effect after deducting there from the amount of expenses
if any due to Municipal Corporation under this agreement.
Clause - 2: Liquidated damages for delay
(i) If the Contractor fails to complete the work under contract by the stipulated date, he
shall pay liquidated damages of 10 percentage of the remaining value of work from the date
of delaying the said work up to the date of completion and handing over to the Ahmedabad
Municipal Corporation.
(ii) Delays for requiring payment of ten percentage liquidated damages of the
remaining amount of tender work for performance shall be sufficient for termination of
contract and forfeiture of security deposit including amount of performance bond in
respect of works estimated to cost more than Rs.15 lacs of performance and
registration of the contractor shall also be kept in abeyance for three years from the
date as fixed on all cases.
(iii) Further to above, AMC may take actions such as recovery by revenue ways
and / or else. Black listing the Contractor permanently and will inform all other Govt. /
Semi Govt. / Corporations / boards / Municipalities / Nagar palika departments
(iv) If the contractor has gone against AMC for litigation or Arbitration for any
reasons whatsoever, the contractor will not be considered for the works after that date
i.e. contractor will be disqualified for the works after that date. Before proceeding for
Black listing the contractor, AMC may consult Legal Department of AMC.
Clause - 3: Default by Contractor:
If the Contractor shall neglect or fails to proceed with the work with due diligence
or if he violates any of the provision of the Contract, the Engineer-in-Charge shall give
the Contractor a notice, identifying deficiencies in performance and demanding
corrective action. Such notice shall clearly state that it is given under the provision of
this clause. After service of such notice, the Contractor shall not remove any plant,
equipments and materials from the site. The Ahmedabad Municipal Corporation shall
have a lien on all such plant, equipments and materials from the date of such notice till
the said deficiencies have been corrected as mentioned in the said notice.
If the Contractor fails to take satisfactory corrective action within ten days after
receipt of such notice, the Engineer-in-charge on behalf of Ahmedabad Municipal
Corporation shall terminate the contract in whole. In case, the entire contract is
terminated, the amount of security deposit and performance bond if any together with
the value of the work done but not paid for, shall stand forfeited to the Ahmedabad
Municipal Corporation. The plants equipment and material held under this clause shall
then be at the disposal of the Ahmedabad Municipal Corporation to recover the amount
equivalent to the liquidated damages and registration of the Contractor shall be kept in
abeyance for three years from the date as fixed in all such cases.
The Engineer-in-Charge if necessary shall direct that a part or the whole of such
plant, equipment and material be removed from the site within a stipulated period. If
the Contractor fails to do so, the Engineer-in-Charge shall cause them or any part of
them to be sold holding the net proceeds of such sale to the credit of the Contractor.
After settlement of accounts, the lien by the Ahmedabad Municipal Corporation on the
Contractors remaining plant, equipments and balances of materials shall be released.
Termination of the contract in whole shall be adequate authority for the Engineer-
in-Charge to demand discharge of the obligations from the guarantors of the security
for the performance.
Clause – 4 :If the progress of any particular portion of the work under Contract is
unsatisfactory, the Engineer-in-Charge shall, notwithstanding that the general
progress of the work is satisfactory, in accordance with clause 2, be entitled to take
necessary action under Clause 3, after giving the Contractor ten day’s notice in
writing and the Contractor shall have no claim whatsoever for any compensation for
any loss caused to him due to such action.
(Clause 1, 2, 3 and 4 are substituted vide GR No. TNC – 1091/IB-10/(11)-C, dated
15-10-91 & modified by GR dated 29-10-91) and GR No. TNC-1088/1B/18/(B) –C
dated 31-8-94 and No. TNC /10 / 2002/14-C dat4d 28-4-2003.
Clause – 5 :In any case in which any of powers conferred upon the Engineer-in-
Charge by clause 3 hereof shall have become exercisable and the same shall not
have been exercised, the non exercise thereof shall not constitute a waiver of any of
the conditions hereof and such powers shall notwithstanding be exercisable at any
Clause 5(i): Valuation at date of forfeiture
The owner shall as soon as may be practicable after his entry consequent upon the
expulsion of the Contractor fix and determine expert or by or after reference to the
parties or after such investigations or inquiries as he may think fit to take or
institute and shall certify what amount (if any) which had at the time of such entry
and expulsion become reasonably due to the Contractor in respect of work then
actually done by him under the contract including the value of any unused or
partially used materials, any constructional plant and any temporary works which
are taken over by owner under his exclusive rights.
Clause 5(ii): Payment after Forfeiture
If purchaser shall enter and expel the Contractor under this clause, he shall not be
able to pay the Contractor any money on account of the contract as determined as
per the foregoing para together with the Contractor other dues until the expiry of
the defects liability period and thereafter until the costs of completion and
maintenance damages for delay in completion (if any) and all other expenses
incurred by Purchaser have been ascertained and the amount thereof certified by
the Architect, the Contractor shall then be entitled to receive only such sum of
sums, (if any) as owner may certify. But if such amount due from the contractor
exceeds the sum payable to the Contractor, the Contractor shall upon demand pay
to Purchaser the amount of such excess and it shall be deemed as debt due by the
contractor to Purchaser and shall be recoverable accordingly.
Clause 5(iii): If the Contractor dies
Without prejudice to any of the rights or remedies under this contract, if the
Contractor dies owner shall have option of terminating the contract without any
compensation to the Contractor.
Clause 5(iv) : Insolvency and breach of contract
The AMC may at any time, by notice in writing, summarily terminate the contrast
without compensation to the contractor in any of the following events:
a) If the contractor, a firm or any partner thereof, shall be at the time adjusted
insolvent or shall have a receiving order for administration of his estate
made against him or shall take any proceedings for composition under any
insolvency act for the time being in force to make any conveyance or
assignment of his assets or enter into any arrangement or composition with
his creditors or suspend of payment if the firm is dissolved under the
partnership Act.
b) If the contractor being a company is wound up voluntarily by the order of
a court or receiver, liquidator or Manager on behalf of the debenture
holders is appointed or circumstances shall have arisen which entitled the
court or Debenture holders to appoint a receiver liquidator or Manager.
c) If the contractor commits any breach of the contract not herein specifically
provided any right of action or remedy which shall have occurred or shall
occur thereafter and provided also the contractors be liable to pay the
AMC for any extra expenditure he is thereby put to and the contractor
shall under no circumstances be entitle to any gain in repurchase.
A Clause – 5A : In the event of the Engineer-in-Charge taking action under Clause
3, he may, if the so desires, take possession of all or any tools, plants, machineries,
materials and stores in or upon the work or the site thereof or belonging to the
Contractor or procured by him and intended to be used for the execution of the work
or any part thereof, by paying or allowing for the same in account at the contract
rate or in case of contract rates not being applicable at such reasonable rates, as may
be comparable to current market rates where ascertainable of similar articles and
comparable condition, to be certified by the Engineer-in-Charge. In the alternative
the Engineer-in-Charge may by notice in writing to the Contractor or his clerk of
the works, foreman or other authorized agent, require him to remove such tools,
plants, machineries, materials or stores from the premises within a time to be
specified in such notice and in the event of the Contractor failing to comply with
any such requisition, the Engineer-in- Charge may remove them at the Contractor’s
expense or shall remove them by auction or private sale at the risk and cost of the
Contractor in all respect, and the certificate of the Engineer-in-Charge as to the
expenses of any such removal and
The amount of the proceeds and expenses of any such removal shall be final and
conclusive against the Contractor.
Clause - 6 : Extension of time : If the Contractor shall desire an extension of the
time for completion of the work on the ground of his having been unavoidably
hindered in its execution or any other ground, he shall apply in writing to the
Concerned Dy. Municipal Commissioner before the expiration of the period
stipulated in the tender or before the expiration of 30 days from the date of which he
was hindered whichever is earlier Concerned Dy. Municipal Commissioner may, in
his opinion, believe that there are reasonable grounds for granting an extension,
grant such extension, as he thinks necessary or proper. The decision of the
Concerned Dy. Municipal Commissioner in this matter shall be final.
Clause – 7: As soon as the work is completed, the Contractor shall give a notice of
such completion to the Engineer-in-Charge and on receipt of such notice, the
Engineer-in-Charge shall inspect the work, and if he is satisfied that the work is
completed in all respects then:–
(i) For all works costing up to Rs. 50 lakhs (amount put to tender), the final
measurements shall be recorded within 90 days from the date of physical
completion of the work and the final bill shall be prepared within 45 days
from the date of recording final measurements. The completion certificate
shall be issued within one month from the date of final measurements
subject to the Contractor fulfilling his obligation as provided in the
contract and subject to the work being complete in all respect.
(ii) In respect of works costing more than Rs. 50 lakhs (amount put to tender),
the final measurements shall be recorded within 180 days from the date of
physical completion of the work and the final bill shall be prepared within
75 days from the date of final measurements subject to the Contractor
fulfilling his obligation as provided in the contract and subject to the work
being complete in all respects.
When separate periods of completion have been specified for items or groups of
items, the Engineer-in-Charge shall issue separate completion certificate for such
items or groups of items.
No certificate of completion shall be issued nor shall the work be considered to be
complete till the contractor shall have removed from the premises, on which the
work has been executed, all scaffoldings, sheds and surplus materials, except
such, as are required for rectification of defects, rubbish and all huts and sanitary
arrangements required for his workmen on the site in connection with the
execution of the work, as shall have been erected by the Contractor for the
workmen and cleared all dirt from all parts of the building(s) in, upon or around
which the work has been executed or of which he may have possession for the
purpose of the execution thereof and cleared floors, gutters and drains, cased
doors and sashes, oiled locks and fastenings, labeled keys clearly and handed them
over to the Engineer-in-Charge or his representative and made the whole premises
fit for immediate occupation or use to the satisfaction of the Engineer-in-Charge.
If the Contractor shall fail to comply with any of the requirements of these
conditions as aforesaid, on or before the date of completion of the work, the
Engineer-in-Charge may, at the expense of the Contractor, fulfill such
Requirements and dispose of the scaffolding, or surplus materials and rubbish
materials except for any sum actually realized by the sale thereof less the cost of
fulfilling the requirement and any other amount that may be due from the
Contractor. If the expenses of fulfilling such requirement pay such excess. The
Engineer-in-Charge shall also have the rights to adjust the amount of excess
against any amounts that may be payable to the Contractor.
Clause – 8 : No payment shall be made for any work, estimated to cost less than
rupees one thousand till after the whole of the said work shall have been completed
and a certificate of completion given. But in the case of works estimated to cost
more than rupees one thousand, the Contractor shall, on submitting a monthly bill
therefore, be entitled to receive payment proportionate to the part of the work then
approved and passed by the Engineer-in-Charge, whose certificate of such approval
and passing of the sum so payable shall be final and conclusive against the
Contractor. All such intermediate payments shall be regarded as payments by way
of advance against the final payments only and not as payments for work actually
done and completed and shall not preclude the Engineer-in-Charge from requiring
bad, unsound, imperfect or unskilled work to be removed and taken away and
reconstructed, or re-erected, nor shall any such payment be considered as an
admission of the due performance of the contract or any part thereof if any other
way very or effect the contract. The final bill shall be submitted by the Contractor
within one month of the completion of the work, otherwise the Engineer-in-
Charge’s certificate of the measurements and of the total amount payable for the
Charge’s certificate of the measurements and of the total amount payable for the
work shall be final and binding on all parties.
Clause – 9: The rates for items of works shall be valid only when the item
concerned is accepted as having been completed fully in accordance with the
sanctioned specifications. In cases where the items of work are accepted as not so
completed, the Engineer-in-Charge may make payment on account of such items at
such reduced rates as he may considered reasonable in preparation of final or on
Clause – 10: Bills to be submitted monthly
For the works costing above Rs.10,00,000 payment will be made once in a month.
However, another payment will be made as desired by contractor and as agreed by
Clause – 11: The Contractor shall submit all the bills on the printed forms to be had
on application at the office of the Engineer-in-Charge. The charges to be made in
the bills shall always be entered at the rates specified in the agreement or at the
part/reduced rates subject to the approval by the Engineer-in-Charge in the case of
items not completed/executed as per agreements or in the case of any extra work
ordered in pursuance of these conditions and not mentioned or provided for in the
tender, at the rate hereinafter provided for such work.
Clause – 12 :If the specification of estimate of the work provides for the use of any
special description of materials to be supplied from the Departmental Store of
Ahmedabad Municipal Corporation or if it is required that the Contractor shall use
certain stores to be provided by the Engineer-in-Charge (such materials and stores
and the prices to be charged therefore as hereinafter mentioned being so far as
practicable for the convenience of the Contractor but not so as in any way to
control the meaning or effect of this contract specified in the schedule or
memorandum herein annexed) the Contractor shall be supplied with materials and
stores as may be required from time to time to be used by him for the purpose of
the contract only, and the value of the full quantity of materials and stores so
supplied shall be set off or deducted from any sum then deposit, or thereafter to
become due to the Contractor under the contract, or otherwise, or from the
security deposit, or the proceeds of safe thereof; if the deposit is held in
Ahmedabad Municipal Corporation securities/Bank Guarantee/ Cash/ Bank Draft
the same or a sufficient portion thereof, shall, in that case be sold for the purpose.
All materials supplied to the Contractor shall remain the absolute properly of
Ahmedabad Municipal Corporation and shall, on no account, be removed from the
site of the work, and shall at all time, be open to inspection by the Engineer-in-
Charge. Any such materials, unused and in perfectly good condition at the time of
completion or termination of the contract, shall be returned to the Departmental
store if the Engineer-in-Charge so requires by a notice in writing given under his
hand, but the Contractor shall not be entitled to return any such materials except
with the consent in writing of the Engineer-in-Charge and he shall have no claim
for compensation on account of any such material supplied to him as aforesaid but
remaining unused by him or for any wastage in or damage thereto.
For materials provided in Schedule-A and consumed in excess quantities, the rates
provided in Schedule – A shall be increased / decreased corresponding to the
increase/decrease in the new rate payable for excess quantity as compared to the
tender rates. The rate for materials provided in extra items will be the issue rates
plus storage charges ruling on the date of issue of such quantity of materials.
B.2.12A Clause – 12A : The Contractor shall be entitled to use the materials supplied by
the Corporation only to the extent of quantities of such materials required for
execution of the work as per theoretical calculations. The Engineer-in-Charge
may, however, on being satisfied that a large quantity of such materials is required
for the execution of the work, permit the Contractor to use such larger quantity of
the materials. Such permission shall be given in writing.
The Contractor is bound to return in good condition such materials issued in
excess of the requirements so worked out or in excess of the quantities so
permitted to be used by the Engineer-in-Charge. If the Contractor fails to return
such extra materials within a period of 15 days from the date of demand in writing
of such materials being made by the Engineer-in-Charge, he shall be changed for
the excess materials at double the issue rate for such materials specified in
“Schedule A” of the contract Agreement.
B Clause – 12B: All stores and materials such as cement, if the total consumption of
which exceeds 25 tons, and steel etc, supplied to the Contractor by Ahmedabad
Municipal Corporation shall be kept by the Contractor in separate godown provided
with a double lock. The key of one of the lock shall remain with the Engineer-in-
Charge or his agent. The godown shall be accessible to the Engineer- in-Charge or
his agent at all times. No materials shall be allowed to be removed from the site of
the work, and any material required for the execution of the work
Shall be taken out from the godown only in the presence of a duly authorized
agent of the Engineer-in-Charge.
(1) The Contractor shall execute the whole and every part of the work in the
most substantial and workman-like manner and both as regards materials
and in other respect in strict accordance with specifications.
The Contractor shall also conform exactly, fully and faithfully to the
designs, drawings and instructions in writing to the work signed by the
Engineer-in-Charge. The design and the drawings shall be lodged in the
office of the Engineer-in-Charge to which the Contractor shall be entitled
to have access for the purpose of inspection at such office during office
Where the instructions referred to above are not contained in separate
letters addressed to the Contractor the same shall be recorded in the work
order book, which shall be maintained and kept on the site of the work.
The Contractor shall be required to sign such entries in the work-order
book in token of having noted the instructions. However, if the Contractor
fails to sign the work-order book for any reason whatsoever, the entry of
the instructions in the work-order book shall be deemed to be due notice to
him of the said instructions. The work-order book shall be open for
inspection to the Contractor on the site of the work during office hours.
(2) The Contractor will be entitled to receive the certified copy of the accepted
tender along with the work order free of cost and will also be entitled to
receive, on request, two sets of contract and working drawings according
to the progress of work, as and when needed, free of cost.
(3) The several documents forming the contract are essential parts of the
contract and a requirement occurring in one is a binding as through
occurring in all. They are intended to be mutually explanatory and
complementary and to describe and provide for a complete work. Further
copies of the contract drawings and working drawings if required by them
shall be supplied at a rate of Rs. 2500/- per set of contract drawing for the
work and Rs. 500/- per working drawings except where otherwise
In the event of any discrepancy in the several documents forming the
contract or in any one document, the following order of precedence should
(a) Dimension and quantities:
(i) Drawings (ii) Schedule B of the Tender form
(iii) Specifications. On drawings, figured dimensions, unless obviously
incorrect, will be followed in preference to scaled dimensions.
(b) Description:
(i) Schedule – B of the ‘Tender Form’ (ii)Drawings.
(ii) Specifications. In the case of defective description or ambiguity,
the Engineer-in-Charge is entitled to issue further instructions
directing in what manner the work is to be carried out. The
Contractor cannot take any advantage of any apparent error or
omission in drawings or specifications and the Engineer-in-
Charge shall be entitled to make corrections and interpretations
as necessary to fulfill the plans and specifications.
Clause – 14.1 : The City Engineer (W R M ) shall have power to make any
alterations in or addition to the original specifications, drawings, designs and
instructions that may appear to him to be necessary or advisable during the progress
of the work and the Contractor shall be bound to carry out the work in accordance
with any instructions in this connection which may be given to him in writing
signed by the City Engineer (W R M) and such alteration shall not invalidate the
contract and additional work which the Contractor may be directed to do in the
manner above specified as part of the work shall be carried out by the Contractor on
the same conditions in all respect on which he agreed to do the main work and at
the as are specified in the tender for the main work
Clause – 14.2 :Deleted
Clause – 14.3 :Deleted
Clause – 14.4: If the additional or alternation work includes any class of work for
which no rate is specified in this contract when such class of work shall be carried
out at the rate entered in the Schedule of Rates of the Department or, at the rates
mutually agreed upon between the City Engineer (W R M) and Contractor,
whichever are lower. If the additional or altered work, for which no rate is entered
in the Schedule of Rates of Department is ordered to be carried out before the rates
are agreed upon, then the contractor shall within seven days of the date of receipt by
him of the order to carry out the work, inform the City Engineer (WRM) of the rate,
he shall by notice in writing, be at liberty to cancel his order to carry out such class
of work and arrange to carry it out in such manner as he may consider advisable,
provided always that if the contractor shall commence work or incur any
expenditure in regard thereto before the rates shall have been determined as lastly
herein before mentioned, then in such case, he shall only be entitled to be paid in
respect of the work carried out or expenditure incurred by him prior to the date of
the determination of the rate as aforesaid according to such rate or rate as shall be
fixed by the City Engineer (W R M). In the event of a dispute, the decision of the
Concerned Dy. Municipal Commissioner of the Municipal Corporation shall be
Where, however, the work is to be executed according to the designs, drawings
and specifications recommended by the Contractor and accepted by the competent
authority, the alterations above referred to shall be within the scope of such
designs and specifications appended to the tenders.
The time limit for the completion of the work shall be extended in the proportion
that the increase in the cost occasioned by alteration bears to the cost of the
original contract work, and the certificate of the Engineer-in-charges as to such
proportion shall be final and conclusive.
Clause – 14.5: Deleted
Clause -15 : No claim to any payment or compensation or for restriction of
work : If any time after the execution of the contract documents the Engineer-in-
charge shall for any reason whatsoever, require the whole or part of the work, as
specified in the tender, be stopped for any period or shall not require the whole or
part of the work to be carried out at all or to be carried out by the Contractor, he
shall give notice in writing, stating the fact to the Contractor who shall thereupon
suspend or stop the work totally or partially, as the case may be. In any such case,
except as provided hereunder, the Contractor shall have no claim to any payment or
compensation whatsoever except as provided hereunder on account of any profit or
advantage which he might have derived form the execution of the work in full but
which he did not so derive in consequence of the full amount of the work not having
been carried out, or on account of any loss that he may be put to on account of
materials purchased or agreed to be purchased or for unemployment of labour
required by him. He shall not have also any claim for compensation by reason of
any alterations having been made in the original specifications, drawings, designs
and instructions which may involve any containment of the work as originally
A Clause – 15A : The Contractor shall not be entitled to claim any compensation
from Municipal Corporation on account of delay by Municipal Corporation in the
supply of materials entered in Schedule “A” where such delay is caused by the (i)
Non-supply due to short allotment of quota in case materials available under quota
regulations (ii) Difficulties relating to the supply of railway wagons (iii) Force
majeure (iv) Act of God (v) Act of the country’s enemies or any other reasonable
cause beyond the control of Corporation.
In the case of such delay in the supply of materials, Municipal Corporation shall
grant such extension of time for the completion of the works as shall appear to the
Engineer-in-Charge to be reasonable to accordance with the circumstances of the
case. The decision of the Engineer-in-Charge as the extension of time shall be
accepted as final by the Contractors. (As modified Vide R & B D.G.R. No. TNC –
Clause – 16: Time-Limit for unforeseen claims: The Contractor shall not be
entitled to any compensation from Municipal Corporation on any account unless
where allowed by the conditions of this contract. In such case, the Contractor shall
have to submit a claim in writing to the Engineer-in-charge within one month of the
cause of such claim occurring.
Clause – 17 : Action and compensation in case of bad work : If, at any time
beforetheexpiryofdefectsLiability,period,asdetailedinClause17-A,itshall
appear to the Engineer-in-charge or his sub-ordinate in charge of the work, that
any work has been executed with unsound, imperfect or unskilled workmanship or
with materials or inferior quality or that any materials or articles provided by him
for the execution of the work are unsound, or of a quality inferior to that
contracted for or are otherwise not in accordance with the contract, it shall be
lawful for the Engineer-in-Charge to intimate this fact in writing to the Contractor
and then notwithstanding the fact that the work, materials or articles complained
of, may have been passed, certified and paid for, the Contractor shall be bound
forthwith to rectify, or remove and reconstruct the work so specified in whole or
in part as the case may require, or if so required shall remove the materials or
articles so specified in whole or in part and provide other proper and suitable
materials or articles at his own charge and cost, and in the event of his failing to
do so within a period to be specified by the Engineer-in-charge in the written
intimation aforesaid, the Contractor shall be liable to pay compensation at the rate
of one percent on the amount of the estimate of the rectification for every day not
exceeding ten days during which the failure so continues, and in the event of any
such failure as aforesaid continuing beyond ten days, the Engineer-in-charge may
rectify or remove, and re-execute the work or remove and replace the materials
complained of, as the case may be at the risk and expense in all respects of the
Contractor should the Engineer-in-charge consider that any such inferior work of
materials as described above may be accepted or made use of, it shall be within
his discretion to accept the same at such reduced rates as he may fix therefore,
However, the contractor shall be responsible for normal maintenance of the work
till the final bill for the work is prepared by the corporation officer.
A Clause – 17A: Defect Liability Period : The Contractor shall be responsible to
make good and remedy at his own expense any defect which may develop or may
be noticed before the period mentioned hereunder from the certified date of
completion. The Engineer-in-charge shall give the Contractor a notice in writing
about the defects and the Contractor shall make good the same within 15 days of
receipt of the notice. In the case of failure on the part of the Contractor, the
Engineer-in-charge may rectify or remove or re-execute the work at the risk & cost
of the Contractor. The Engineer-in-charge shall be entitled to appropriate the whole
or any part of the amount of the security deposit towards the expenses, if any,
incurred by him in rectification, removal or re-execution. The Defects Liability
period shall be as under:-
(a) for all works costing up to Rs. 50,000/- (amount put to tender) the period shall
be 3 months from the certified date of completion.
(b) for all works more than Rs. 50,000 and up to Rs. 1 crore (amount put to
tender) the period shall be 12 months from the certified date of completion or
one monsoon, whichever is later.
(c) for major projects costing more than Rs. 1 Crore, the period shall be
months from the certified date of completion which should include one
monsoon. For the purpose of deciding the monsoon period the 30th September
may be treated as the last date.
(d) for buildings works, the period specified in (a), (b) or (c) above OR elapse of
monsoon period following the certified date of completion, whichever is later.
For the purpose of deciding the monsoon period, the 30th September may be
treated as the last date.
B Clause – 17 B : Maintenance and repairs of the road during guaranteed
period : The contractor shall maintain and keep on proper condition and repair, at
his cost the surface of the road for 1 year from the date from which the final
finishing coat is laid to the satisfaction of the Concerned Dy. Municipal
Commissioner. The decision of the Concerned Dy. Municipal Commissioner as to
the necessity of repairs to the surface of the road shall be final and binding on the
contractor. If the contractor fails to maintain and keep in proper condition and repair
the surface of the road during the stipulated period of 1 year, the Concerned Dy.
Municipal Commissioner shall be entitled to carry out the necessary repairs
departmentally at the cost of the contractor. The decision of the Concerned Dy.
Municipal Commissioner as to amount of the expenses incurred in carrying out the
repairs shall be final and binding on the contractor. The Concerned Dy. Municipal
Commissioner shall be entitled to appropriate the whole or any part of the amount
of the security deposit towards the expenses, if any, incurred by him in repairing the
(This will apply to a contract where the works are to be executed by the contractor
according to the specifications).
Clause – 18 : Work to be open to inspection Contractor or responsible agent to
be present : All works under or in course of execution or executed in pursuance of
the contract shall at all times, be open to the inspection and supervision of the
Engineer-in-charge and his subordinate and the Contractor shall, at all times during
the usual working hours, and at all other times at which reasonable notice of the
intimation of the Engineer-in-charge or his subordinate to visit the works shall have
been given to the Contractor, either himself be present to receive orders and
instructions or have a responsible agent duly accredited in writing present for that
purpose. Orders given to the Contractor’s duly authorized agent shall be considered
to have the same force and effect as if they had been given to the Contractor
Clause – 18 (a) : Employment of a qualified Site Engineer by the Contractor :
(Vide G.R.B& CD No. RGN-6090-UO 24 (42)-C, Dated 26-11-90). The
Contractor shall employ full-time technically qualified staff during the execution
of work as per requirement and as directed by Engineer in charge.
The Engineer so employed for the Municipal Corporation work must have
sufficient experience to handle the work independently. Such an Engineer shall
have to stay at the site of work an he shall not be entrusted with any other duty
except of this work.
In case the contractor or a partner of the contractor Firm is a Civil graduate
engineer, employment of a separate Engineer will not be necessary provided that
the Engineer partner himself attends the execution of the work on site.
Clause – 19 : Notice to be given before work is covered up : The Contractor
shallgivenotlessthanfiveday’snoticeinwritingtotheEngineer-in-chargeor
his subordinate in charge of the work before covering up or otherwise placing
beyond the reach of measurement any work, in order that the same may be
measured and correct dimensions thereof taken before the same is so covered up
or placed beyond the reach of measurement and shall not cover up or place
beyond the reach of measurement any work without the consent in writing of the
Engineer-in-charge or his subordinate in charge of the work and if any work shall
be covered up or placed beyond the reach of measurement without such notice
having been given or consent obtained, the same shall be uncovered at the
Contractor’s expense and in default thereof, no payment or allowance shall be
made for such work or for the materials with which the same was executed.
Clause – 20 : If the Contractor or his workmen, or servants shall break, deface
injure or destroy any part of the building or work in question or work in question
in/on which they may be working or any building, road, fence, enclosure or grass-
land or cultivated ground contiguous to the premises on which the work or any part-
thereof is being executed or if any damage shall be done to the work from any
cause whatever before completion of the work or before the completion of the
maintenance period whichever is later or any damage occurred / caused due to
normal flood or rain or if any imperfections become apparent in it within three
months from the grant of a certificate of completion, final or otherwise by the
Engineer-in-charge the Contractor shall make good the same at own expenses or in
default, the Engineer-in-charge may cause the same to be made good by other
contractor and deduct the expenses (of which the certificate of the Engineer-in-
charge shall be final) from any sums that may thereafter become due to the
contractor or from his security deposit or the proceeds of sale thereof or a sufficient
portion thereof.
A Clause – 20A : Force Majeure : Neither party shall be to liable to the other for
any loss or damage occasioned by or arising out of acts of god, and in particular,
unprecedented Floods, volcanic eruption, earth quake or other convulsion of nature,
and other acts such as but not restricted to general strike, invasion, the act of foreign
countries, hostilities or war like operations before or after declaration of war,
rebellion, military or usurped power which prevent performance of the contract and
which could not have been for seen or avoided by a prudent person.
NOTE :“Unprecedented flood” means the flood crossing the high flood level of
the past 50 years which is on the available record. (Modified Vide R & B
Clause – 21 : Contractor to supply plant, ladders, scaffolding etc., and is liable
for damage arising from non-provision of lights, fencing etc., : The Contractor
shall supply at his own cost all materials (except such special materials if any, as
may, in accordance with the contract of be supplied from the Public Works
Corporation Stores), plant, tools, appliances, implements, ladders, cordage, tackle,
scaffolding and any temporary works which may be required for the proper
execution of the work whether in the original, altered or substituted from and
whether included in the specifications, or other documents forming part of the
contract or referred to in these conditions or not and which may be necessary for the
purpose of satisfying or complying with requirements of the Engineer-in- charge as
to any matter or to which under these conditions he is entitled tobe
satisfied or which he is entitled to require together with carriage there for to and
from the work. The Contractor shall also supply without charge the requisite
number of persons with the means and material necessary for the purpose of
setting out works and counting, weighing and assisting in the measurement or
examination at any time and from time to time, of the work or the materials.
Failing this, the same may be provided by the Engineer-in-Charge at the expense
of the Contractor and the expenses may be deducted from any money due to the
Contractor under the contract or from his security deposit, or proceeds of sale
thereof, or of a sufficient portion thereof. The contractor shall provide all
necessary fencing and lights required to protect the public form accident and shall
also be bound to bear expenses of defense of every suit, action or other legal
proceeding at law that may be brought by any person for injury sustained owing to
neglect of the above precautions and to pay any damages and costs which may be
awarded in any such suit, action or proceedings to any such person, or which may,
with the consent of the Contractor, be paid in compromising any claim by any
A Clause – 21A: The contractor shall provide suitable scaffolds, working platforms,
gangways and stairways and shall comply with the following regulations in
connection therewith–
(a) Suitable scaffolds shall be provided for workmen for all work that cannot
be safely done from a ladder or by other means.
(b)(i) Under the supervision of a competent and responsible person,
(b)(ii) Appointed by Contractor and by competent workers possessing adequate
experience in this kind of work.
(c) All scaffolds and appliances connected therewith and all ladders shall–
(i) Be of sound material.
(ii) Be of adequate strength having regard to the loads and strains to
which they will be subjected and
(iii) Be maintained in proper condition.
(d) Scaffolds shall be so constructed that no part thereof can be displaced in
consequence of normal use.
(e) Scaffolds shall not be overloaded and so far as practicable the load shall be
evenly distributed.
(f) Before installing the lifting gear on scaffolds, special precaution shall be
taken to ensure strength and stability of the scaffolds.
(g) Scaffolds shall be periodically inspected by a competent person
(h) Before allowing a scaffold to be used by his workman, the Contractor shall,
whether the scaffold has been erected by his workmen or not, take steps to
ensure that is complies fully with the regulations herein specified.
(i) Working platforms, gangways shall–
(j) be so constructed that no part thereof can dag unduly or unequally.
(ii) be so constructed and maintained having regard to the prevailing
conditions as to reduce as far as practicable risks of persons tripling or
(iii) be kept free from any unnecessary obstruction.
(k) In the case of working platforms, gangways working places and stairways
at a height exceeding 3.25meters.
(i) Every working platform and every gangway shall be closely boarded
unless other adequate measures are taken to ensure safety.
(ii) Every working platform and every gangway shall have adequate
(iii) Every working platform, gangway, working place and stairway shall
be suitably fenced.
(l) Every opening in the floor of a building or in working platform shall,
except for the time and to the extent required to allow the access of person
or the transport or shifting of materials be provided with suitable means to
prevent the fall of persons or material.
(m) When persons are employed on a roof where there is danger of falling from
a height exceeding 3.25 meters, suitable precaution shall be taken to
prevent the fall of persons or material.
(n) Suitable precautions shall be taken to prevent persons being struck by
articles which might fall from scaffolds or other working places.
(o) Safe means of access shall be provided to all working platforms and other
working places.
B Clause – 21B: The Contractor shall comply with the following regulations as
regards the Hoisting Appliances to be used by him–
(a) Hoisting machines and tackle, including their attachments anchorages and
supports shall–
(i) be of good mechanical construction, sound material and adequate
strength and free from patent defect; and
(ii) be kept in good repair and in working order
(b) Every rope used in hoisting or lowering materials or as a means of
suspension shall be of suitable quality and adequate strength and free from
(c) Hoisting machines and tackle shall be examined and adequately tested
after erection on the site and before use and be re-examined in position at
intervals to be prescribed by Engineer-in-Charge.
(d) Every chain, ring, hock, shackle, swivel and pulley block used in hoisting
or lowering materials or as a means of suspension shall be periodically
(e) Every crane driver or hoisting-appliance-operator shall be properly
(f) No person who is blow age of 15 years shall be in control of any hoisting
machine, including any scaffold, nor shall give signals to he operator.
(g) In the case of every hoisting machine and of every chain, ring hook,
shackle, swivel and pulley block used in hoisting or lowering or as a
means or suspension, the safe working load shall be ascertained by
adequate means.
(h) Every hoisting machine and all gears referred to in proceeding regulation
shall be plainly marked with the safe working load.
(i) In the case of hoisting machine having a variable safe working load, each
safe working a load and conditions under which it is applicable shall be
clearly indicated.
(j) No part of any hoisting machine or any gear referred to in regulation ‘g’
above shall be loaded beyond the safe working load except for the purpose
(k) Motors, gears, transmissions, electric wiring and other dangerous parts of
hoisting appliance shall be provided with sufficient safeguards.
(l) Hoisting appliances shall be provided with such means as will reduce to a
minimum the risk of the accidental descent of the load.
(m) Adequate precautions shall be taken to reduce to minimum the risk of any
part of a suspended load becoming accidentally displaced.
Clause – 22: Measures for Prevention of Fire: The Contractor shall not set fire to
any standing jungle, trees, bush wood or grass without a written permit from the
Engineer-in-charge.
When such permit is given, and also in all cases when destroying cut or dug up
tress, bush wood, grass etc., by fire, the Contractor shall take necessary measures
to prevent such fire spreading to or other-wise damaging surrounding property.
Clause – 23 : Liability of Contractors for any damages done in or outside work
area : Compensation for all damage done intentionally or unintentionally by
contractors labourers whether in or beyond limits of Municipal Corporation
property including any damage caused by the spreading of fire mentioned in the
clause 22, shall be estimated by the Engineer-in-charge, or such other officer as he
may appoint, and the estimates of the Engineer in charge, subject to the decision of
the Concerned Dy. Municipal Commissioner, on appeal, shall be final and the
Contractor shall be bound to pay the amount of the assessed compensate on
demand, failing which the same will be recovered from the Contractor as damages
in the manner prescribed in clause 1 or deducted by the Engineer-in-Charge from
any sums that may be due or become due from Municipal Corporation to the
Contractor under this contract or otherwise.
The contractor shall bear the expenses of defending any action or other legal
proceeding that may be brought by any person for injury sustained by him owing
to neglect of precautions to prevent the spread of the fire and he shall also pay the
damages and cost that may be awarded by the court in consequences.
Clause – 24:Deleted.
Clause – 25:Deleted.
Clause – 26: Work not to be sublet. Contract may be rescinded and security
deposit forfeited for subletting it without approval or for bribing a public
officer or if contractor becomes insolvent: The contract shall not be assigned or
sublet without the written approval of the Engineer-in-charge. And if the contractor
shall assign or sublet his contract or attempt to do so or become insolvent or
commence any proceeding to get himself be adjudicated an insolvent or make any
compromisation with his creditors, or attempt of do so, the Engineer- in-charge
may, by notice in writing rescind the contract. Also if any bribe, gratuity, gift, loan,
perquisite, reward or advantage, pecuniary or otherwise, shall either directly or
indirectly be given, promised or offered by the contractor, or any of his servants or
agents to any public officer or person in the employ of Municipal Corporation in
any way relating to his office or employment, or if any such officer or person shall
become in any way directly or din directly interested in the contract, the Engineer-
in-Charge may thereupon by notice in writing rescind the contract. In the event of
contract being rescinded, the security deposit of the Contractor shall thereupon
stand forfeited and be absolutely at the disposal of Municipal Corporation and the
same consequences shall ensue as if the contract had been rescinded under clause
hereof and in addition the Contractor shall not be entitled to recover or be paid for
any work thereof actually performed under the contract.
Clause – 27: Sum payable by way of compensation to be considered as
reasonable compensation without reference to actual loss :All sums payable by a
Contractor by way of compensation under any of these conditions shall be
considered as a reasonable compensation to be applied to the use of Municipal
Corporation without reference to the actual loss or damage sustained and whether
any damage has or had not been sustained.
Clause – 28: Changes in the constitution of firm to be notified: in the case of a
tender by partners, any changes in the constitution of a firm shall be forthwith
notified by the contractor to Engineer-in-Charge for his information.
Clause – 29: Works to be under directions of Concerned Dy. Municipal
Commissioner: All works to be executed under the Contract shall be executed
under the direction and subject to the approval in all respects of the Concerned Dy.
Municipal Commissioner of the Circle for the time being, who shall be
entitled to direct at what point or points and in what manner they are to be
commenced and from time to time carried on.
Clause – 30 (1): Dispute referred to Arbitrator / Tribunal / Court of law:
The disputes relating to this contract, so far as they relate to any of the following
matters, whether such disputes arise during the progress of the work or after the
completion or abandonment thereof, shall be referred to the sole Arbitration
appointed by AMC of the persons who is holding or has held a post not below the
rank of Superintending Engineer /City Engineer / Dy. Municipal commissioner
(Engineering) as far as possible in the consultation with agency if it is necessary
and such dispute shall be settled in accordance with the arbitration and
conciliation Act 1996 ,under this Corporation of the State of Gujarat.
(i) The rates of payment under clause 5 for any tools, materials and stores in
or upon the works of the site thereof or belonging to the contractor or
procured by him and intended to be use for execution of the work or any
part thereof of which possession may have been taken by the Engineer-in-
Charge under the saidclause-5.
(ii) The reduction in rates made by the Engineer-in-Charge, under clause 9 for
the items of work not accepted as completed fully in accordance with the
sanctioned specifications.
(iii) The rates of payment for any class of work which is included in the
additional or altered work carried out by the Contractor in accordance with
the instructions of the Engineer-in-Charge under clause 14 and the rate for
which is to be determined under the said clause14.
(iv) The rates of payment for materials already purchased or agreed to be
purchased by the Contractor before receipt of notice given by the
Engineer-in-Charge under clause 15, and / or the amount of compensation
payable to the Contractor under the said clause for loss in respect of such
(v) The amount of compensation which the contractor shall be liable to pay
under clause 17 in the event of his failure to rectify, remove or reconstruct
the work within the period specified in the written intimation or the
amount of expenses incurred by the Engineer-in-Charge under the said
clause 17 in rectifying, removing, or re-executing the work or in removing
and replacing the materials or articles complained of.
(vi) The reduction of rates as may be fixed by the Engineer-in-Charge under
clause 17 for the inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the Contractor for damages as
estimated and assessed under clause23.
(viii) The amount payable to the Contractor for the work carried out under
clause 33 in accordance with the instruction and the requirement of the
Engineer-in-Charge in a case where there is no specifications.
(4a) the disputes will be referred to court of law and its jurisdiction will be
(5) In case of dispute leading to the contractor or Municipal Corporation
approaching to Court of Law, it shall be within the jurisdiction where the
site of work is situated.
(6) The reference to court proceeding under this clause shall not:
i) affect the right of the Engineer in charge under clause 5 to take
possession of all or any tools, plants, materials and stores in or upon
the works of site thereof belonging to the contractor or procured by
him and intended to be used for the execution of the work or any part
ii) Preclude the Engineer in charge from utilizing the materials purchased
by the contractor in any work or from removing such materials to other
places, during the period the work is stopped or suspended in
pursuance of notice given to the contractor under clause15.
iii) Entitle the contractor to stop the progress of the work or carrying out
the additional or altered work in accordance with the provisions of
clause 14 or as the case may be, of clause33.
Clause – 31: Deleted.
Clause – 32 : Lump sums in estimates : When the estimate on which a tender is
made includes lump sum in respect of part of the work, the contractor shall be
entitled to payment in respect of the items of work involved or the part of the work
in question at the same rates as are payable under this contract for such items or if
the part of the work in question is not in the opinion of the Engineer-in- charge
capable of measurement, the Engineer-in-Charge may, as his discretion, pay the
lump sum amount entered in the estimate and the certificate in writing of the
Engineer-in-charge shall be final and conclusive against the Contractor with regard
to any sum or sums payable to him, under the provisions of this clause.
A Clause – 32 A: Access to the Site: The Contractor shall arrange to construct,
maintain and afterwards remove and reinstate any temporary access required for and
in connection with the execution of the works. Reinstatement shall include restoring
the area of the access route to at least the degree of safety, stability, Water and
appearance that existed before the Contractor entered the site.
Clause – 33: Action where no specifications: In case of any class of work for
which there is no such specification, such work shall be carried out in accordance
with the IS specifications, and in the event of there being no IS Specifications, then,
in such case the work shall be carried out in all respects in accordance with the
instructions and requirements of the Engineer-in-Charge.
Clause – 34: Definition of work :The expression “work” or “works” where used
in these conditions shall, unless, there be something in the subject or context
repugnant to such construction, be construed to mean the work, or the works,
contracted to be executed under or in virtue of the contract, whether temporary or
permanent and whether original, altered, substituted or additional.
Clause – 35 : Contractor’s percentage whether applied to net or gross amount
of the bill: Percentage referred to in the tender shall be deducted from / added to the
gross amount of the bill before deducting the value of any stock issued. (This clause
shall be Applicable only for B-1 tender)–
Clause – 36: Non-refund of quarry fees and Royalties: The contractor shall pay
the royalty to the competent authority/local body as per rules. The contractor shall
furnish quarterly the statement showing quantity of quarried materials from whom
purchased (with full address of the seller) and copies of bill for purchase to the
district officer of the Geology and Mining Corporation or authority competent to
levy royalty in the area of work. Copy of such statement shall be furnished to the
Engineer in charge also. Contractor shall also furnish such additional information as
regards royalty payment of the Engineer in charge and the Royalty authority. The
royalty charges paid shall be borne by the Contractor and shall not be reimbursed by
the Ahmedabad Municipal Corporation (Authority: - R & BD. Circular No. TNC-
Clause – 37: Compensation under the Workmen’s Compensation Act: The
Contractor shall be responsible for and shall pay any compensation to his workman
payable under the Workmen’s Compensation Act, 1923 ( VIII of 1923) (hereinafter
called the said ACT) for injuries caused to the workmen. If such
compensationispaidbyMunicipalCorporationasprincipalundersub-section12
(1) of the said Act, on behalf of the Contractor, it shall be recoverable by
the Municipal Corporation from the Contractor under sub-section 12 (2) of the
said section. Such compensation shall be recovered in the manner laid down in
B.2.37A Clause – 37-A: The Contractor shall be responsible for and shall pay the expenses
of providing medical aid to any workmen who may suffer a bodily injury as a
result of an accident. If such expenses are incurred by Municipal Corporation, the
same shall be recoverable from the Contractor forthwith and be deducted, without
prejudice to any other remedy of Municipal Corporation, from any amount due or
that may become due to the Contractor.
B Clause – 37-B: The Contractor shall provide all necessary personal safety
equipment and first-aid apparatus available for the use of the persons employed on
the site and shall maintain the same in suitable condition for immediate use at any
time and shall comply with the following regulations in connection therewith:
(a) The workers shall be required to use the equipment so provided by the
Contractor and the Contractor shall take adequate steps to ensure proper
use of the equipment by those concerned.
(b) When work is carried out in proximity to any place where there is a risk of
drowning all necessary equipments shall be provided and kept for use and
all necessary steps shall be taken for the prompt rescue of any person in
(c) Adequate provision shall be made for prompt first-aid treatment of all
injuries likely to be sustained during the course of the work.
Clause – 38: The Quantities shown in the tender are approximate and no claim shall
be entertained for qualities of work executed being less than those entered in the
tender. In the case of increase in the quantities by more than 30 %, the new rate will
be paid to the Contractor for the quantities in excess of 30%. The rates for the
increased quantities as aforesaid will be fixed in the manner specified in clause –14.
Clause – 39: Employment of famine or other labour: The Contractor shall
employ any famine, convict or other labour of particular kind or class, if ordered in
writing to do so by the Engineer-in-charge.
Clause – 40: No compensation shall be allowed for any delay caused in the staring
of the work on account of delay in making available the full site of land at a time.
Clause – 41: Claim for compensation for delay in the execution of work :No
compensation shall be allowed for any delay in execution of the work on account of
water standing in borrow-pits or compartments. The rates are inclusive of hard or
cracked soil, excavation in mud, sub-soil water or water standing in borrow-pits and
no claim for an extra rate shall be entertained unless otherwise expressly specified.
Clause – 42: Entering upon or commencing any portion or work: The contractor
shall not enter upon or commence any portion of work except with the written
authority and instructions of the Engineer-in-charge or of his subordinate in charge
of the work. Failing such authority, the contractor shall have no claim to ask for
measurements of or payment for work.
Clause – 43: Minimum age of person employed: (i) No contractor shall employ
any person who is under the age of 14years.
A Clause – 43(I) (A): The employment of donkeys and/or other animals and the
payment of fair wages:
(i) For asphalt work(s), as far as possible only the adult persons should be
employed on Corporation OR the contracted work as the case may be. If
the adult persons are not available, then the children below the age of
(Fifteen years) should not be employed under any circumstances.
(ii) No contractor shall employ donkeys or other animals with breeching of
string or thin rope. The breeching must be at least three inches wide and
should be of tape (Nawar).
(iii) No animal suffering from sores, lameness or emaciation or which is
immature shall be employed on the work.
(iv) The Engineer-in-Charge or his agent is authorized to remove from the
work any person or animal found working which does not satisfy these
Conditions and no responsibility shall be accepted by Municipal
Corporation for any delay caused in the completion work by such removal.
(v) The Contractor shall pay fair and reasonable wages to the workmen
employed by him in the contract undertaken by him. In the event of any
dispute arising between he contractor and his workmen on the grounds that
the wages paid are not fair and reasonable, the dispute shall be referred
without delay to the Engineer – in – charge who shall decide the same.
The decision of the Engineer – in – charge shall be conclusive and binding
on the Contractor, but such decision shall not in any way affect the
conditions in the contract regarding the payment to be made by Municipal
Corporation at the sanctioned tender rates.
(vi) The Contractor shall provide drinking water facilities to the workers /
labourers employed on Municipal Corporation works. Amenities relating
to sanitation shall also be provided to the workers / labourers employed on
works (in urban areas). If the contractor fails to comply with these
provisions, the Engineer - in - charge shall give notice in writing and if the
contractor does not provide this facility to the workers /labourers within a
period of ten days from the date of the notice in writing, the Engineer in
charge shall there upon make the arrangement for drinking water at the
cost of the Contractor.
(vii) The Contractor shall provide the amenity of proper shade and shelter to the
workers / labourers and their children on Municipal Corporation works as
soon as the work starts. If the Contractor fails to provide shed and shelter,
the Engineer-in – charge shall provide the same at the cost of Contractor.
Clause – 44: Method of payment : Payment to Contractor shall be made by
cheque drawn on any treasury, accounts department of corporation, provided the
amount exceeds Rs. 10. Amount not exceeding Rs. 10 will be paid in cash.
A Clause – 44-A:Any sum of money due and payable to the Contractor (including the
security deposit returnable to the Contractor) executing any Municipal Corporation
work under this contract shall be appropriated by Municipal Corporation and shall
be set off against any claim of the Municipal Corporation for the payment of a sum
of money arising out or under any other contract made by the Contractor with the
Municipal Corporation. When no such amount for purpose of the recovery from the
Contractor against any claim of the Municipal Corporation is available, such a
recovery shall be made from the Contractor as arrears of land revenue.
Clause – 45: Deleted
Clause – 46 : Employment of scarcity labour : If Municipal Corporation declares
a state of scarcity or famine to exist in any village situated within 16 kilometers of
the work, the Contractor shall employ upon such parts of the work, as are suitable
for unskilled labour, any person certified to him by the Engineer in charge or by any
persons to whom, the Engineer in charge may have delegated this duty in writing to
be in need of relief and shall be bound to pay to such persons, wages not below the
minimum which Municipal Corporation may have fixed in this behalf. Any disputes
which may arise in connection with the
Implementation of this clause shall be decided by the Engineer in charge whose
decision shall be final and binding on the Contractor.
Clause – 47 -Deleted
Clause – 48: Rate Exclusive of GST and all other taxes
The rates to be quoted by the Contractor must be Exclusive of GST but inclusive of all
other taxes. However any subsequent changes in the tax structure by Government after
due date of bid submission will be compensated on availability of submission of actual
documentation. Contractor has to intimate Engineer in charge regarding changes
occurred in the tax structure after bid submission. If contractor fails to provide such
information and if may financial obligation may arise due to change in tax structure,
same will be recovered from the contractor. The Contractor shall apply fair means of
stock maintenance and shall adopt accounting standards as may be prescribed under of
GST. For arriving at the difference in procurement prices due to introduction of GST, it
will be open for the Government to ask for original invoice, L.R, weigh bridge slips;
payment details and such other document as may be required for the purpose. If there is
reduction in overall tax burden then proportional benefit of that shall be passed on the
NOTE: The rates to be quoted by the Contractor must be exclusive of GST but inclusive
of all other taxes. GST shall be paid extra on the admissible payment as per the
approved tender rates and condition of price variation; GST should be paid as per
prevailing rates at the time of payment.
Clause – 49 :The Contractor should as far as possible, obtain his requirement of
labourers, skilled and unskilled, from the nearest Employment Exchange so as to
utilize the local employment potential. If there are no local Employment Exchanges
or such Exchanges are not able to provide the required labourers locally. Suitable
labourers should be utilized to the maximum extent possible.
Clause – 50 : Fair Wages : If the Contractor fails to pay within 7 (Seven) days to
the labourer(s) / worker (s) the minimum wages prescribed by the Corporation
under the minimum wages Act, 1948 as in force from time to time, the Engineer in
charge shall be at liberty to deduct the amount payable to the labourer(s) worker(s)
from his (Contractor’s) bills or deposit(s) payable by the Contractor after making
due inquiries and establishing the claim(S) of the labourers(s) worker(s).
The Contractor shall not be entitled to any payment or compensation on account
of any loss that the Contractor may have to incur on account of the action as
aforesaid. Before the action as aforesaid, is enforced, a notice in writing to the
Contractor shall be issued by the Engineer-in-charge to pay the wages as per
Minimum Wages Act in force at the relevant time. If contractor does not act as
aforesaid within seven days, then the action contemplated as above shall be taken
Clause – 51: Deleted
Clause – 52: List of Machinery: The Contractor shall also give a list of
machineries in his possession and which he propose to use on the work.
Clause – 53 :(i) In case, the roller deployed by Corporation for the use on contract
work is kept idle by the Contractor for want of adequate labour and materials, the
Contractor will have to pay rental charges as per prevailing rules even through the
items of rolling and watering are to be carried out by the Corporation.
(ii) If the Contractor does not plan his programme so as to suit the requirement of
the Municipal Corporation, the proportionate rental charges on roller shall have to
be recovered from the Contractor.
Clause – 54: Local labour on normal rates : The Contractor shall have to engage
local labour and person seeking employment where available on normal rate.
Clause – 55: Deleted
Clause – 56: The Contractor shall employ only such labour who shall produce a
valid certificate of having been vaccinated against small pox within a period of last
Clause – 57 : (1) Huts : The Contractor shall build a sufficient number of huts on a
suitable plot of land for the use of the labourers according to the following
specifications:
(i) Huts of bamboos and grass may be constructed.
(ii) A good site shall be selected, high ground removed from jungle but well
provided with trees shall be chosen wherever it is available. The
neighborhood of rank jungle, grass or weeds should particularly be
avoided; camps should not be established close to large cuttings of earth
(iii) The lines of huts shall have open spaces of at least 10 m. between rows,
When a good natural site cannot be procured, particular attention should be
given to the Water.
(iv) There should be no overcrowding, Floor spaces at the rate of 2.8 sq.m. per
head shall be provided. Care should be taken to see that the huts are kept
clean and in good order.
(2) Drinking Water:
The Contractor shall, as far as possible, provide an adequate supply of
chlorinated pure potable drinking water for the use of labourers. This
provision shall be at the rate of not less than 45 liters per head, no provision
need be made where there is a suitable nalla, river or well within 0.4 km. of
the camp. However arrangement should, as far as possible, be made to
chlorinate water by chlorine tablets before it is allowed for drinking purpose.
(3) The Contractor shall construct semi permanent latrines for the use of
labourers on the following scale, namely:
a) Where females are employed, there shall be least one latrine for every
b) Where males are employed, there shall be at lease one latrine for every
Provided that where the number of males or females exceed 100, it shall be
sufficient if there is one latrine for every 25 males or females, at the case
may be, up to the first 100 and one for every 50 thereafter.
(4) Privacy in latrines:
Every latrine shall be under cover and so partitioned off as secure privacy, and
shall have a proper door and fastenings.
(5) Notice to be displayed outside latrines and urinals:
(1) Where workers of both sexes are employed, there shall be displayed
outsideeachblockoflatrineandurinalanoticeinthelanguageunderstood by
the majority of the workers “For Men only” or “For Women only”: as the
(2) The notice shall also bear the figures of a man or of a woman, as the
There shall be atleast one urinal for male workers up to 50 and the for female
workers up to 50 employed at a time. Provided that there where the number of
male or female workmen, as the case may be exceeds 500, it shall be sufficient
if there is one urinal for every 50 males or females up to the first 500 and one
for every 100 males or females or part thereof.
(7) Latrines and Urinals to be accessible:
(1) The latrines and urinals shall be conveniently situated and accessible to
workers at all times at the establishment. (2) (i) The latrines and urinals shall
be adequately lighted and shall be maintained in a clean and sanitary condition
at all time (2) (ii) Latrines and urinals other than those connected with a flush
sewage system shall comply with the requirements of the Public Health
(8) Water for latrines and urinals:
Water shall be provided by means of tap of otherwise, so also be conveniently
accessible in or near the latrines and urinals.
(9) Bathing and washing places:
1. The Contractor shall construct a sufficient number of bathing places,
every unit of 20 persons being provided with a separate bathing place.
2. Washing places should also be provided for the purpose of washing
clothes. Every unit of 30 persons shall have atleast one washing place.
3. Such bathing and washing places should be suitably screened and
separate places provided for male and female workers.
4. Such facilities shall be conveniently accessible and shall be kept in
clean and hygienic.
The Contractor shall make sufficient arrangements for draining away the
sewerage water as well as water form the bathing and washing places and shall
dispose of this waste in such a way as not to cause nuisance. The Contractor
should obtain a permission form the Gujarat Water Pollution Control Board,
Gandhinagar, if water is to be drained in river or near the well. The Contractor
would put material oil once in a week in stagnant water round about the
(11) Medical facilities:
The Contractor shall engage a medical officer with a travelling dispensary for
a camp having 500 or more persons if there is no Municipal Corporation or
other private dispensary situated with 6 Km. form the camp.
(12) Conservancy and cleanliness:
The Contractor shall provide the necessary staff for effecting the satisfactory
conservancy and cleanliness of the camp to the satisfaction of the Engineer in
charge. Atleast one sweeper per 200 persons should be engaged. Conservancy
staff should dump refuge in compost pit, away from the labour camp.
(13) Health Provisions:
The Health Officer of the Municipal Corporation of Health Services shall be
consulted before opening a labour camp and his instructions on matters, such
as, the water supply, sanitary convenience, the camp-site, accommodation and
food supply shall be followed by the Contractor.
(14) Precautions against epidemic:
(a) The authorities in charge of the colonies should get the labourers
inoculated against cholera and plague and vaccinated against smallpox at
the time of recruitment, if they are not inoculated or vaccinated within
months or 3 years respectively, prior to the date of recruitment.
(b) When, in any labour camp, there is a outbreak of an epidemic disease or
is threatened with such an outbreak, the authorities in charge of the labour
camps, should ensure that all the inmates of the labour colonies are
inoculated or vaccinated, at the case may be, depending on the diseases,
with 72 hours after the outbreak.
(c) The authorities in charge of the labour colony should arrange to
communicate by wire regarding the outbreak of the epidemic diseases on
the very day of the outbreak, to the Health Officer of Municipal
Corporation in charge of that area. Thereafter they should continue to
send daily reports to the above officers in the prescribed form regarding
the progress of the epidemic disease.
(d) When the authorities in charge of the labour colony suspect or have
reason to believe that any in mate of the labour colony it suffering form
the infections or contagious disease, they shall forthwith arrange for the
segregation of such persons to isolated huts to be specifically provided for
the purpose and also for their treatment.
(e) As regional malaria epidemic outbreaks are likely to occur in such project
areas, the authorities in charge of the labour colonies should report
promptly the occurrence of unusual incidence of cases of malaria and also
inform the Health officers of the Municipal Corporation and also arrange
to institute all necessary anti-malarial measures as may be advised by the
officials of the Public Health Corporation.
(f) The authorities in charge of the colonies should also arrange to carry out
any other measures that may be recommended by the officials of the
Public Health Corporation necessary to prevent or control the spread of
Clause – 58: Contractor shall have to arrange for the supply of gumboots, hand
gloves, mask etc., invariably to the labourers/workers engaged by the Contractor on
Clause – 59: The Contractor shall not show any distinction between Harijan and
other class of labourers/ workers employed to carry out the Municipal Corporation
Clause – 60: Price Variation clause: Deleted
Clause – 61: Fencing and Lighting:
(a) The Contractor shall, unless otherwise specified, be responsible for the proper
fencing, lighting, grading and taking of the necessary safety measures for all
works comprised in the contract and for the proper provision of temporary
road, way, foo-ways, guards, fences, caution notices etc., as the same may be
rendered necessary by reasons of the work for the accommodation of
workmen, foot passengers or other traffic and of owners and occupiers of
adjacent property and the public and shall remain responsible for any
Accidents that may occur on account of his failure to take proper & timely
(b) All the arrangements made for fencing and lighting shall be maintained by the
Contractor throughout the currency of the contract till the physical taking
over of the work by Municipal Corporation.
Clause – 62 : Liability of accidents to persons : Responsibilities and liabilities of
the contractor under Workmen’s Compensation Act.
(a) On the occurrence of an accident, which results in death of workmen
employed by the contractor or which is so serious as is likely to result in
death of any such workmen, the Contractor, shall within 24 hours of
happening of such accident(s) intimate, in writing, to the Engineer in
charge the fact of such accident(s). The contractor shall indemnify
Municipal Corporation against all loss or damage sustained by the
Municipal Corporation resulting directly form his failure to give intimation
in the manner aforesaid including the penalties or fines, if any, payable by
the Municipal Corporation as consequence of Municipal Corporation’s
failure to give notice under the Workmen’s Compensation Act or
otherwise to conform to the provisions of the said Act in regard to such
(b) In the case of an accident, in respect of which compensation may become
payable under Workmen’s Compensation Act, whether by the Contractor
or by the Municipal Corporation as principal Employer, it shall be lawful
for the Engineer-in-charge to retain out of money due and payable to the
Contractor, such sum or sum of money as may, in the opinion of the
Engineer in charge, be sufficient to meet such a liability. The opinion of
the Engineer in charge shall be final in regard to all matters arising under
Clause – 63 : Access to site and work on site : The Engineer may, if he considers
fit from time to time, enter upon any land(s), which may be in possession of the
Contractor this contract for the purpose of executing any work not included in this
contract and may execute such work not included in this contract by agent or by
other Contractors, at his opinion and the Contractor shall, in accordance with the
requirements of the Engineer-in-charge, afford all reasonable facilities for execution
of the work including occupation of lands by structure or otherwise for any other
contractor employed by the Municipal Corporation and his workmen or for the
workmen of the Municipal Corporation who may be employed in the execution on
or near the site of the work not included in the contract or of any contract in
connection with or ancillary to the work and in default, the Contractor shall be
liable to the Municipal Corporation for any delay or expense incurred by reason of
such default. Provided always that if the exercise of these powers shall cause any
damage to the contract, he may, within fifteen days of such damage arising, make a
statement of the same to the Engineer in charge who shall, from time to time, assess
the value in his judgment of such damage and the Municipal Corporation shall form
time to time pay to the Contractor the amounts (if any) accepted as justified by the
Engineer in charge.
Clause – 64 : Reports regarding labour : The contractor shall submit the
following reports to the Engineer in charge.
(a) (i) A daily report in the from as may be prescribed of the strength of labour
both skilled and unskilled employed by him on the work(s). The contractor
shall increase or decrease the strength, both skilled or unskilled, if directed
by the Engineer in charge. The submission of such report shall not,
however, relieve the contractor of his responsibilities and duties regarding
progress or any other obligations under the contract.
(ii) A classified weekly return in the prescribed form of the number of persons
employed on the works during the preceding week.
(iii)A weekly medical report in the prescribed form showing the health of the
Contractor’s camp, the number of persons ill or incapacitated and the
nature of their illness.
(iv)A report of any accident, which may have occurred, to be sent within
hours of the occurrence.
(v) Such other reports as may be prescribed.
Clause – 65 : Treasure trove : In the event of discovery by the Contractor or his
employees, during the progress of work of any gold, silver, oil or other minerals of
any description and precious stones, treasures, coils, antiquities, relic fossils or other
articles or value of interest whether geological, archaeological or any other such
treasure & other things shall be deemed to be absolute property of the Municipal
Corporation and the Contractor shall duly preserve the same to the satisfaction the
Engineer in charge, from time to time, and deliver the same to such persons as the
Engineer in charge may appoint.
The Contractor shall take all reasonable precautions to prevent his workmen or
any other person form removing or damaging any such articles or thins,
immediately after the discovery thereof and before removal acquaint Engineer in
charge with such discovery and carry out his orders for the disposal of the same.
Clause – 66: Indemnity : The Contractor shall identify the Municipal Corporation
against all actions, suits claims & demands through or made against the Municipal
Corporation in respect of work of this contract and against any loss or damage to
Corporation in consequence of any action or suit being brought against the
contractor for anything done or omitted to be done in execution of the work of this
Clause – 67 : Insurance of labourers : The Contractor shall be responsible to
arrange for insurance of all labourers. Skilled and unskilled, workers, supervisors
etc., employed by him as per labour regulations of the state.
Clause – 68 : Setting out : The Contractor shall be responsible for the true and
proper setting out of the works and the correctness of positions, levels, dimensions
and alignments of all parts of the work and for the provisions of all necessary
instruments, appliance and labour in connection therewith. If, at any time, during
the progress of the work, any errors, appear or arise in the positions, levels,
dimensions or alignments of any part of the work, the Contractor, on being required
to rectify such errors by the Engineer in charge shall at his own expense do so to the
satisfaction of the Engineer in charge, if however, such error is based on incorrect
data supplied in writing by the Engineer in charge, the expense of rectifying the
same shall be borne by the Corporation. The checking of and setting out of any line
or level by the Engineer in charge or his representative shall not in any way, relieve
the contractor of his responsibilities for the correctness of the error. The Contractor
shall carefully protect and observe all bench marks, site nails, pags and other thins
used in setting out of the work(s).
Clause – 69: cement register : A register in the prescribed form showing day to
day receipt, consumption and balance of cement on site of work will be maintained
by the Municipal Corporation, which shall invariably be signed daily by the
Contractor or his authorized representative in token of its correctness.
Clause – 70: Materials and works test register : A register in the prescribed
Performa showing test result of materials and work tests will be maintained at the
site of work by the Corporation and ever entry thereof shall invariably be signed by
the Contractor or his authorized representative in token of its correctness.
Clause – 71: Progress schedule: The Contractor shall furnish, within one month
(unless extended by the Engineer in charge) of the order to start the work, the
progress schedule in quadruplicate indicating the date of starting, the monthly
progress expected to be achieved and the anticipated completion date of each major
item of work to be done by him, also indicating dates of procurement and setting up
the materials plants and machinery. The Schedule should include a statement of
proposed general and detailed arrangements for carrying out works and of time,
order and manner in which it is proposed that these shall be executed. The schedule
should be farmed keeping requirements of the clause 2 of Tender form in view and
be such as in practice to the achievement towards completion of the work in the
time limit and of the particular items on the dates specified in the contract and shall
have the approval of the Engineer in charge. Further, the dates for the progress, as
in this schedule shall be adhered to.
(a) In case it is found necessary, at any stage, to alter the schedule, the
Contractor shall submit in good time. A revised schedule incorporating
necessary modifications proposed and get the same approved from the
Engineer - in – charge is further empowered to ask for more detailed
schedule or schedules, say, week by week, for any item or items and the
Contractor shall supply the same as and when asked for.
(b) The Engineer in charge shall have, at all times, the right, without in any
way vitlating this contract forming grounds for any claim, to alter the order
of the work or any part thereof and the Contractor shall also revise the
progress schedules accordingly and submit four copies of the revised
schedule to the Engineer - in – charge within seven days of the said
Engineer’s direction to alter the order of works.
(c) The Contractor shall furnish sufficient plant, equipment and labour and
shall work such hours and shifts as may be necessary to maintain the
progress of the work as per approved progress schedule. The working and
shift hours shall comply with all Corporation regulations in force and shall
be such, as may be approved by the Engineer - in – charge and the same
shall not be varied without the prior approval of Engineer - in –charge.
(d) The Contractor shall from time to time, as may be required by the
Engineer - in – charge, furnish the Engineer - in – charge with a statement
in writing of the arrangements he proposes to adopt for the execution of
this contract and the Engineer - in – charge may, if he considers necessary
at any time advise alteration in the same, which the Contractor shall adopt
on notice thereof.
(e) The progress schedule(s) shall be in the form of progress chart, forms,
statements and/or reports as may be approved by the Engineer - in –
(f) The approval of the progress schedules by the Engineer - in – charge shall
not relieve the Contractor of any of his duties and responsibilities under
the contract. The adoption of any modification in the schedule required by
the Engineer - in – charge shall not entitle the Contractor to any extra
Clause – 72: Secured advance to contractor :Deleted
Clause – 73 : Advance payment :Deleted
Clause – 74 : Advance against machineries :Deleted
Clause – 75 : Mobilization advance :Deleted
Clause – 76 :Deleted
Clause – 77 :Deleted
Clause – 78 :Deleted
Schedule Showing (approximately) the materials to be supplied from the
Municipal Corporation Store for Work Contracted to be executed and
The rates at which they are to be charged for
Particulars Approx- Rate at which the Place
imate materials will be delivery
Quantity charged to the
Note – 1 :The person of firm submitting the tender should see that the rates in the above
schedule are filled up by the Engineer - in – charge on the issue of the from
prior to the submission of the tender.
Note – 2 :Stores to be supplied to Contractors for a work free of cost should be mentioned
in Schedule ‘A’ in addition to Schedule ‘B’ and the specification attached to
the contract agreement form.
Note – 3 :All empty drums involved in the supply by Corporation to the Contractor under
this contract shall be returned in undamaged condition within the time
prescribed by the Concerned Addl. City Engineer (Water Project) by the
Contractor to the original place of delivery. No allowance on account of these
empty drums will be made to the Contractor and in the event of non-return,Rs.
65 will be charged to the Contractor for each unreturned drum or badly
Note – 4 :Empty bags of cement supplied by the Government will be the property of the
Contractor and no recovery for the non-return of the same will be made.
Memorandum Showing Items of Works to be carried out
Items No. Quantities Item of Tender Rate Unit Total
estimated work In figures In words amount
but may according
orless estimated
I/We am/are willing to carry out the work at_ % above/below (should be
written in figures and words) the tendered amount mentioned above. Amount of my / our
tender works out as under:
Tender amount Rs. Tender amount Rs.
Add % above Rs. Deduct %
Net Rs. below Rs. Net Rs.
Inwords Inwords
Note – 1 :All work shall be carried out as per Public Works Corporation Handbook and other
specifications of the Division or as directed.
Note – 2 :All the columns in the Schedule should be filled in, in ink and the total of the
entries in the last column should be struck by the Contractor under his
Note – 3 :Rates quoted include clearance of site (prior commencement of work and at its
close) in all respects and hold good for work under all conditions, site,
moisture, weather etc.
Note –4: To be continued on additional sheets, it found necessary.
B-3 : SCHEDULE – B
Item Quantities Item of work Estimated Unit Total amount
Item Quantities Item of work Estimated Unit Total amount
No. estimated but rates according to
may be more estimated quantities
AS PER SCHEDULE OF QUANTITIES AND RATES IN VOLUME – II.
Note1: All works shall be carried out as per specifications of Ahmedabad Municipal
Corporation or as directed.
Note2: Rates quoted include clearance of site (prior to commencement of work and at
its close) in all respects and hold good for work under all conditions, site
moisture, weather etc.
Note3: This is for further information of the bidder that schedule of quantities and
rates indicated here are in Volume -II of the tender.
Note4: The bidder should note that no separate payment, whatsoever shall be made
for dewatering by using any system and disposal of the pumped water at
suitable distance as directed by Engineer-in-charge, if required to be done
during excavation, laying, jointing and testing of pipes and excavation for
storage reservoirs or any other activity required to be done related to laying of
pipes, sump, construction of any kind of manhole, RCC Chambers and
excavation if required to be done under wet condition etc. and contractor shall
quote accordingly.
Signature of Contractor Additional City Engineer (Water Project)
Name : Ahmedabad Municipal Corporation
Company’s seal :
Note : To be continued on additional sheets, if found necessary
B-4 : GENERAL INSTRUCTIONS
The work shall be completed within 12 (Twelve) months including monsoon period
after the order to start the work. If the site is not cleared to start the work. The time
limit will be considered from the date of possession given to start the work. The
details of Misc. Repair and Maintainance works of Different Water
Distribution Station of South West Zone and other zones in under Water
Project Dept. A.M.C
It shall be as per design and instructions of Addl. City Engineer (Water Project) and
his order will be considered final. Concrete used for the work, shall be ready mix
concrete as per specification specified in volume I, part –II, Section – D6,
The Contractor shall have to maintain account of steel, cement and other materials
that may be brought by him on site. This account shall be regularly maintained and
kept open for inspection by Municipal staff. Watering of all the items shall be done as
per instructions. Mixing of concrete shall be done by reversible concrete mixer
machine having capacity of 10-12 cubic meter per hour. Arrangements of bringing
vibrator for R.C.C. work if required shall have to be made by the Contractor.
The Contractor shall remain responsible for workmen’s compensation, if any, when
such case occurs. The contractor shall arrange for red lamps at night and fencing and
pags and shall be responsible for any damage of life and limb or property, if any
happens, during the execution of work. In case of dispute for unseen or overlooked
items, the decision of Addl. City Engineer (Water Project) shall be final. The
Contractor shall have to give site clean of all rubbish on completion of work and hand
over the site with final finishing of the work as directed. All the rejected materials
shall be removed from site within 24 hours by Contractor at his risk and cost.
For mixing mortar either for masonry or for plaster or for any other purpose
contractor shall have to prepare trough of bigger size and mix the mortar in the trough
in required proportion. In no case he shall be allowed to mix the mortar either on floor
or any finished surfaces.
The Contractor shall have to make his own arrangement for water required for the
work and shall pay the water charges as per the prevailing rates of Corporation based
on water meter readings.
If any extra item crops up during the progress of works, the same shall be carried out by the
contractor, after approval of competent authority and he shall be paid at the rate fixed by the
City Engineer (WRM) as per the rate analysis based on current market rates or current SOR
(Year in which extra item executed) or tender SOR (after effect of tender premium / discount)
whichever is less.
If in the interest of the AMC it is necessary to change either any site or the design of
theproposedworktheContractorshallcarryoutthesameathisquotedrateswithout charging
any extra and he will be paid at the rates quoted by him and no claim for extra for
subsequent changes made will be entertained.
The cubical contents of the cement bag shall be taken as 0.03455 Cu.m. per bag and
the Contractor shall have to prepare the measure boxes according to thismeasures.
The R.C.C. or specified work shall not be done on Sunday and holiday except in
emergency or when technical requirements are such that continuity of work should be
maintained and that too will be with prior permission of the competent authority
All the materials required for the execution of works including cement, sulphate
resistance cement, TMT Reinforcement steel, including MS shall have to be brought
by the contractor from open market.
Retention money shall be deducted at a rate of 2% from current bills which will be
released on time of final bill and certification issued by Engineer in charge to that
Octroi exemption passes shall not be given for any material required for this work.
Contractor will be fully responsible for compliance of the various provisions under
Contract Labor Act, 1970 and the Rules frames there under. The Contractor should
obtain necessary permissions, license & registrations from labour commissioner, as
per labour law.
As per circular No. MGR.2176(96)(ii) dated 31.8.77 issued by Government of
Gujarat, Contractors are requested to procure their materials required for construction
work through legal sources i.e. Only from the quarry lease-holders, permit holders or
middle-man who satisfies the contractor as to the legality of the source of purchase by
him of these materials.
The bidder shall note that if the information required to be furnished by him either at
the stage of prequalification or at the stage of bidding are not provided in time and its
deliberated concealed and such information has come to the notice of AMC at any
stage prior to award of Work and whether or not negatively affecting bidders
competency the AMC reserve the right to out rightly reject the bid though he is
prequalified in the absence of such information.
All charges on account of Octroi terminal entry tax, sales tax, GST, excise duty,
royalty etc. and other duties on indigenous material obtained for the works from any
source shall be borne by the Contractor. As per the amendment of Sales Tax Act
which comes into force from August 1985, Sales Tax on works contracts shall be paid
by the Contractor and no reimbursement shall be made by AMC for the same.
Necessary testing of materials shall be carried out by the Contractor at the laboratory
approved by AMC. This does not relieve the Contractor from his contractual
obligations of making all arrangements for taking samples; take to the
laboratory and to keep the necessary records as directed.
The Contractor shall not employ any child below 14 years of age. It is prohibited by
Child Labour Prohibition and Regulation Act 1986. Hon’ble Supreme Court has given
guide lines and as per those guide lines, if child labour is employed on the work site,
the contractor shall have to deposit Rs. 20,000 (Rs. Twenty thousand only) in the
child labour welfare fund, and to submit the proof to AMC. If the contractor refuses to
deposit this sum, then the contractor shall be sole responsible for the action to be
taken for the contempt of Supreme Court judgment and shall be liable for prosecution
by the concerned Authority.
The Contractor shall be responsible for the quality and good status of work till the
final bill i.e. handover of the work is made to AMC.
The Contractor shall have to submit the running account bill in duplicate. On
certificate from the Engineer, the payment shall be released by AMC after proper
necessary checking. This procedure shall not absolve the Contractor from the
responsibility of timely completion of the work.
I/ We hereby certify that I /We noted the above Important General Instructions
and have quoted our rates taking into account these conditions.
Signature of Contractor Additional City Engineer (Water Project)
Name : Ahmedabad Municipal Corporation
Company’s seal :
B-5 : ANNEXURES
Annexures : The information in the following annexure specimens should be furnished on
separate letter pad if necessary.
(Referred to in Condition No. 2 General Rules and Direction for the guidance of contractors)
The Additional City Engineer Place:
Details regarding my / our partners / our company (in the case of limited company)
Names, Address(es), telephone numbers(s) Income Tax etc. are as under:
Sr. Name(s) of Full Telephone Residential Telephone Full
No. person/partner address No.(s) address(es) No.(s) address of
Director of the of the (Office) (Resi.) Income tax
Company place of office ward
(with pin Income tax
code) return is
I/We hereby agree to intimate to you about change if any, in the above mentioned
address(es) and telephone No.(s) within Fifteen days of its occurrence till my / our
deposit, for the said work paid by me/us is not returned to me/us.
Dated Signature of Tenderer
Signature of the contractor: Signature of the Dy. Municipal Commissioner
B-6 : SCHEDULES
SCHEDULE – B.6.1
DETAILS OF THE WORKS OF SIMILAR TYPE AND MAGNITUDE CARRIED OUT BY THE TENDERER
DURING LAST 7 YEARS PERIOD
Sr. No Name of Work Place and Tendered Cost Time in which Date of Principal
Country work completed Completion Features.
Signature of the Tenderer with
BIDDING CAPACITY
A) Existing commitments and on-going works
Description of work Place and State Contract No. & Name & Address Value of works Stipulated period Value of Works Anticipated
Date of Employer (Rs. in Lacs) of completion remaining to be date of
completed * (Rs. Completion
* Enclose certificate(s) from Employer or Employer’s authorized representative, not below the rank of an Executive Engineer or equivalent.
Signature of Contractor
Name of the Contractor
Stamp of Company
SCHEDULE – B.6.2
DETAILS OF THE WORKS IN HAND AND WORKS TENDERED FOR AS ON THE DATE OF SUBMISSION OF THE TENDER.
Sr. Name of Place and WORKS IN HAND WORKS TENDERED FOR Remarks
No Work Country Tendered Cost of work Anticipate Tender Date when Stipulated date
Cost remaining to d Date of Cost decision is & period of
be executed as Completio expected Completion
Signature of the Tenderer with
SCHEDULE – B.6.4
INFORMATION REGARDING FINANCIAL CAPACITY OF THE TENDERER.
Sr. No. Details Amount Remarks
1. Solvency Solvency Certificate of an amount 20 % of the tender estimated cost shall be
enclosed with technical bid.
2. Annual turnover for last three years: Details of major contracts executed during these years shall be
(a) 2024 – 2025 furnished.
3. Price of the biggest job carried out Certificate from the owner in support of successful completion of
work may be furnished.
Signature of the Tenderer with
C-1: GENERAL SPECIFICATIONS – NON TECHNICAL
C-2: ADDITIONAL GENERAL CONDITIONS
C-3: SAFETY PROVISIONS
SECTION - C : SPECIFICATIONS : NON-TECHNICAL
Sr. Description Page No.
C.1 General Specifications
C.1.1 Location and Description of Work C-1/1
C.1.2 Drawings C-1/1
C.1.3 Issue and return of contract documents C-1/1
C.1.4 Programme of work C-1/2
C.1.5 Progress C-1/2
C.1.6 Time for completion C-1/2
C.1.7 Certificates of completion C-1/2
C.1.8 Patents, rights and royalties C-1/3
C.1.9 The site C-1/3
C.1.10 Access to the site C-1/3
C.1.11 Geological information C-1/3
C.1.12 Setting out the works C-1/3
C.1.13 Temporary works C-1/4
C.1.14 Amenities to be preserved C-1/4
C.1.15 Works to be kept clear of water C-1/4
C.1.16 Discharge of water into existing water courses C-1/5
C.1.17 Preventive measures of pollution C-1/5
C.1.18 Effects of weather C-1/5
C.1.19 Site to be kept tidy C-1/5
Sr. Description Page No.
C.1.20 Safety measures and services C-1/5
C.1.21 Claims for damage to person or Property C-1/7
C.1.22 Assistance for the engineer’s staff` C-1/7
C.1.23 Publicity notice board C-1/7
C.1.24 Clearing site on completion C-1/8
C.1.25 Forms of monthly statements C-1/8
C.1.26 Production of vouchers, etc. C-1/8
C.1.27 Day work C-1/8
C.1.28 Claims C-1/9
C.1.29 Engineers representative C-1/9
C.1.30 Subsidence of road C-1/9
C.1.31 Qualification and experience of Tenderer C-1/9
C.1.32 Payment of items on lump sum basis C-1/10
C.1.33 Interpretation of documents C-1/10
C.1.34 Errors and discrepancies in tenders C-1/10
C.1.35 Information furnished C-1/10
C.1.36 Payment terms C-1/11
C.1.37 Brand names C-1/11
C.1.38 Equipment for excavation C-1/11
C.1.39 Aggregates C-1/11
C.1.40 Material testing C-1/11
C.1.41 Record of labour employed C-1/12
C.1.42 Extra item of work C-1/12
C.1.43 Disputes C-1/12
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01. Technical bid Volume-I - 06 .pdf
02. Finicial bid Volume -II -06 SWZ.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .