Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC 0 ANUJ SADAN POSTAL PARK PATNA CHAURAHA RAMVILASH CHOWK PATNA BIHAR 800001 | PATNA | BIHAR | 800001 | ₹1.6 L Quoted ₹1.4 L | L1 | Accepted-AOC AWARDED |
| 2 | L2₹1.4 LRejected-Finance 78 PHUSBANGLOW BHAGA SHALIMAR DHANBAD DHANBAD 828301 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828301 | ₹1.4 L | L2 | Rejected-Finance HIGHER THAN L1 RATE |
| 3 | L2₹1.4 LRejected-Finance AT BANIYAHIR P O IHARIA DIST DHANBAD 828111 | DHANBAD | DHANBAD | JHARKHAND | 828111 | ₹1.4 L | L2 | Rejected-Finance HIGHER THAN L1 RATE |
Tender Value
₹1.6 L
EMD Value
₹2,016
Closing Date
12 Mar 2026, 10:00 amClosed
Area Manager (EnM) Lodna Area
Office of the General Manager Lodna Area
Partial Repairing Loading /Un-Loading Transporting and Installation of 500 KVA 11KV/440V for Lighting Transformer Make EEF Sl.No. 4015088 Dhanbd Koyla Nagar to near Lodna Sushee Camp at Lodna Colliery of Amal.Joyrampur Colliery under Lodna Area.
2026_BCCL_355263_1
BCCL/LA/EnM/F-19/25-26/185
Open Tender
Electrical and Maintenance Works
10 days
Lodna Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,016
30 Mar 2026
2 Mar 2026
13 Mar 2026
2 Mar 2026
12 Mar 2026
3 Mar 2026
2 Mar 2026 - 6 Mar 2026
Loading of Transformer at Koyla Nagar S/S to Sushree Camp
Placing of Transformer ( man Power) to Sushree Sub-Station
Transformer Connection Connector Supply and Fitting Incoming and Outgoing
Cable End Joining Kit Heat Shrinkable with all Materials 150 Sq.mm2 Cable 11 KV
Installation of transformer with Labour and Insulating Materials
Cable Laying HT and Connection at D.P. and Transformer
Connection of transformer HT OCB ITCP with Insulating Materials
LT Cable Laying 185 Sqmm2
Supply and Installation of Maintenance Free Chemical Earth Pit Electrode with back Filling Compund 3
Supply and Erection 25 X 5 mm G.I. Streep and Connection to all Body and Neutral
Earth Pit Chamber Making with all materials
Supply and Erection of Switch Disconnector Fuse Unit-320 Amps
3 Phase Energy Meter (10 Amps)
CT :(500:5) Molded Type
4 mm Sq copper wire
Installation Charge
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.63 MB
BOQ_368102.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid