Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹44.0 CrAccepted-AOC FATHIMA COMPLEX VELLIYAMTHODE MALAPPURAM | VELLIYAMTHODE | MALAPPURAM | KERALA | 1 | Accepted-AOC L1 | |
| 2 | 2₹44.3 Cr+₹34.4 L (0.78%)Rejected-Finance MANI MADOM AMBALAPUZHA PO ALAPPUZHA 688011 | ALAPPUZHA | ALAPPUZHA | KERALA | 688011 | 2 | Rejected-Finance L2 |
Tender Value
₹40.8 Cr
EMD Value
₹5 L
Closing Date
27 Nov 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer, KIIDC
Parvathy, tc 36/1, nh 66 bypass service road, eanchakkal jn, chackai p.o., thiruvananthapuram- 695024.
Construction of Regulator Across Vamanapuram River
2023_KIIDC_619986_1
IRR/KIIDC/TR/4239/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
540 days
Thiruvananthapuram
Please refer Tender Document
4 documents required · 4 mandatory
₹19,518
₹5 L
KIIDC Office, Trivandrum
24 Jan 2024
7 Nov 2023
30 Nov 2023
7 Nov 2023
27 Nov 2023
7 Nov 2023
14 Nov 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A- Construction of Regulator | |||||
| 1.001 | 2.3.1.B:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle -By Manual Means | - | Hectare | - | - |
| 1.002 | OD9378/2023-2024:Construction of cofferdam for the construction of RCB with required breadth and height, maintaining the cofferdam during construction and removing after construction etc complete ( contractor should submit the working drawing with necessary details of cofferdam and get approval of Engineer in charge before construction). | - | metre | - | - |
| 1.003 | OD9379/2023-2024: Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection, cost of fuel, lubrication oil and other stores, including all operation cost etc. | - | hour | - | - |
| 1.004 | OD9380/2023-2024: 60.2.4 BAILING OUT WATER USING PUMP ABOVE 10HP AND UP TO 20HP - Bailing out water with engine and pump set above 10HP and up to 20HP, including conveyance to site and erection, cost of fuel, lubrication oil and other stores, including all operation cost etc. | - | hour | - | - |
| 1.005 | OD9381/2023-2024: Bailing out water using pump above 30 HP and up to 40 HP -Bailing out water with
engine and pump set above 30 hp and up to 40hp ,including conveyance to site and erection, cost of fuel
,lubrication oil and other stores, including all operation cost etc.
Data as per OD irrigation 60.2.6 | - | hour | - | - |
| 1.006 | 12.25.3:Bored cast-in-situ M35 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Pile diameter-1200 mm | 1 | metre | - | - |
| 1.007 | OD24038/2023-2024:Boring Providing and installing bored cast insitu reinforced cement concrete piles of M35 grade of specified diameters and length into hard rock, to carry a safe working load not less than specified excluding the cost of steel reinforcement but including the cost of boring with bentonite solution including removal of excluded earth with all lifts and leads-1200mm dia piles | - | metre | - | - |
| 1.008 | OD9382/2023-2024:Integrity testing of pile using low strain/sonic energy test/sonic eco test method in accordance with IS 14893 including surface prepearation of pile top by removing soil ,mud,dust and chipping lean concrete lumps etc and use of computerised equipment and high skilled trained personal for conducting the test and submission of results all complete a per direction of engineer in charge | - | no | - | - |
| 1.009 | 12.1.B.2:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removal of stumps and other deleterious matter, only for dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth 3 M to 6 M- Mechanical Means | 0.2 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ_931433.xls
BOQ Document • 0.43 MB
132987589.pdf
Tender Document • 0.05 MB
132987591.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .