Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Outside_Halqa |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Outside_Halqa |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
11 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BARAMULLA
EXECUTIVE ENGINEER REW BARAMULLA
C/O R/Wall on link road near H/o Farooq Ahmad Ganie and Ab Majeed wani at w-7 at shirpora B ,Pyt Shirpora B, Block Khore Sherabad, Scheme ADP-PRI,Year 2026-2027.
2026_RDPR_317429_29
148/Xen/Rew/Bla/2026-27 Dated 23/07/2026
Open Tender
Civil Works
Percentage
30 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹4,000
5 Sept 2026
23 Jul 2026
12 Aug 2026
23 Jul 2026
11 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto1.5 m, including getting out excavated earth and disposal of surplus excavated earth as. All kinds of soils. | 1 | cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) crushedWith 20% plum. | - | cum | - | - |
| 3 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand) Quarry | - | cum | 1 | - |
| 4 | Dry random rubble masonry with hard stone in foundation and plinth:Quarry | - | cum | - | - |
| 5 | carriage of stones lead 15KM | - | cum | - | - |
| 6 | carriage of Sand lead 20 KM | - | cum | - | - |
| 7 | carriage of Aggregate lead 18 KM | - | cum | - | - |
| 8 | Provision for signboard and photograph & other unforseen items | - | No. | - | - |
stage.html
html • 0.02 MB
finance_1040538.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_1040538.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .