| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.9 LAccepted-AOC | ₹54.9 L | L1 | Accepted-AOC Agreement executed vide agreement no.363/25-26 |
| 2 | L2₹55.0 LRejected-Finance VALIYA VEED THRIKKAKARA P O LSGD THRIKKAKARA MUNICIPALITY KAKKANAD | THRISSUR | KERALA | 680667 | ₹55.0 L | L2 | Rejected-Finance Agreement executed by L1,hence L2 is rejected |
| Sl No | Description | Qty | Unit | POTHUMARAMATH NIRMANA THOZHILALI CO OPERATIVE SOCIETY LIMITED L2 | sirajudheen L1 |
|---|---|---|---|---|---|
| 1.00Retarring | |||||
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material | 126.8 | cum | 3,337.88 ₹4.2 L | 3,337 ₹4.2 L |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 99 | cum | 3,750.64 ₹3.7 L | 3,750 ₹3.7 L |
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 970.4 | sqm | 323.59 ₹3.1 L | 323.5 ₹3.1 L |
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 886.59 | sqm | 418.33 ₹3.7 L | 418 ₹3.7 L |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 660 | sqm | 80.37 ₹53,044.20 | 80.37 ₹53,044.20 |
| 1.01 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 8,000 | sqm | 15.79 ₹1.3 L | 15.7 ₹1.3 L |
| 1.01 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 660 | sqm | 18.9 ₹12,474 | 18.9 ₹12,474 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 8,660 | sqm | 302.65 ₹26.2 L | 302.5 ₹26.2 L |
| 1.01 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 951.8 | sqm | 16 ₹15,228.80 | 16 ₹15,228.80 |
Tender Value
₹55.0 L
EMD Value
₹50,000
Closing Date
29 Sept 2025, 12:30 pmClosed
THE ASSISTANT EXECUTIVE ENGINEER
O/o THE ASSISTANT EXECUTIVE ENGINEER,THRIKKAKARA MUNICIPALITY
Proj.283/2025-26-Thrikkakara Muni-Maintenance of Various road in ward- 26 32 34 35 36 41 42 43
2025_LSGD_800445_1
LIDEW/AEE/ET/32/2025
Open Tender
Civil Works - Roads
180 days
THRIKKAKARA
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹50,000
Yes
23 Jan 2026
22 Sept 2025
30 Sept 2025
22 Sept 2025
29 Sept 2025
22 Sept 2025
Amount
Retarring
4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material
4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates <br> Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502
75.5.2.1pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.2.3pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65)
3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
OD304314/2025-2026:Providing and Laying of Interlocking Concrete Block Pavements using 100 mm M40 hydraulic blocks of approved size, design & shape, laid in required pattern over and including a compacted bed of 6mm stone aggregate of 75mm average thickness, etc. all complete as per the direction of Engineerin- charge
OD304614/2025-2026:Providing and Laying of Interlocking Concrete Block Pavements using 80 mm M40 hydraulic blocks of approved size, design & shape, laid in required pattern over and including a compacted bed of 6mm stone aggregate of 50mm average thickness, etc. all complete as per the direction of Engineerin-charge.
POTHUMARAMATH NIRMANA THOZHILALI CO OPERATIVE SOCIETY LIMITED (BID ID -2356747)
Bidder Name
sirajudheen
POTHUMARAMATH NIRMANA THOZHILALI CO OPERATIVE SOCIETY LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1327941.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid