Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
13 May 2026, 2:00 pmClosed
Registrar KSU
Construction of STP, Pond development and CD work in KSU main campus at shilaj
299334
1 / 2026-27/KSU
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹3,600
The Registrar, Kaushalya – The Skill University
₹1.7 L
28 Apr 2026
28 Apr 2026
28 Apr 2026
13 May 2026
28 Apr 2026
Name of Work:- Construction of STP, Pond development and CD work in KSU main campus at shilaj.
Bill of Quantities
Estimated Total Amount
Estimated Total Amount
ITEM Rates According to
Item of Work Quantity Unit
Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful
1 materials and disposing off the excavated stuff includng shoring, strutting and dewatering 1259.00 Cumt. 117.08
of any kind of soil upto any lead and lift. (a) Loose or soft Soil
Excavation for foundation for depth from 1.5 m to 3.0 m including sorting out and
2 stacking of useful materials and disposing off the excavated stuff includng shoring, 777.00 Cumt. 162.38
strutting and dewatering of any kind of soil upto any lead and lift. (a) Hard Soil
Excavation for foundation for depth from 3.0 m to 5.0 m including sorting out and
3 stacking of useful materials and disposing off the excavated stuff includng shoring, 352.00 Cumt. 182.94
strutting and dewatering of any kind of soil upto any lead and lift. (a) Hard Soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc.
4 in layers not exceeding 20 cm. in depth consolidating each deposited layer by ramming and 1038.00 Cumt. 130.39
watering upto optimum moisture content level.
Providing and laying cement concrete 1:4:8 (1-Cement : 4- coarse sand : 8- hand broken stone
5 aggregates 40 mm nominal size) and curingcomplete excluding cost of formwork in (A) 16.00 Cumt. 2680.21
Foundation and Plinth
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- hand broken stone
6 aggregates 40 mmnominal size) and curing 334.00 Cumt. 3005.76
complete excluding cost of formwork in (A)Foundation and Plinth
Providing and laying in position Ready Mixed M-300 grade concrete for reinforced cement
conctere work , using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit mixer for a lead up to
kms having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cementconcrete work including pumping of R.M.C. from transit mixer to site of
7 laying, including the cost of centering shuttering finishing and reinforcement including cost of 49.00 Cumt. 5199.26
admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and durability as per direction ofthe
Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall
bemaintained) (Cement level 475 kg )(A) Foundations, footings, Base of columns and Mass
Providing and laying in position Ready Mixed M-300 grade concrete for reinforced cement
conctere work , using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit mixer for a lead up to
kms having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cementconcrete work including pumping of R.M.C. from transit mixer to site of
8 laying, including the cost of centering shuttering finishing and reinforcement including cost of 113.00 Cumt. 6211.78
admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and durability as per direction ofthe
Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall
bemaintained) (Cement level 475 kg ) (B) Walls, from top of foundationlevel upto floor two
Providing and laying in position Ready Mixed M-300 grade concrete for reinforced cement
conctere work , using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit mixer for a lead up to
kms having continuous agitated mixer, manufactured as per mix design of specified grade for
reinforced cementconcrete work including pumping of R.M.C. from transit mixer to site of
9 laying, excluding the cost of centering shuttering finishing and reinforcement including cost of 35.00 Cumt. 7158.51
admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of
concrete, improve workability without impairing strength and durability as per direction ofthe
Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall
bemaintained) (Cement level 475 kg ) ©Slabs,landing,shelves,Balconies Lintels, Beams,
Girders and Cantilever upto floor two level.
Providing TMT Bar FE 550D reinforcement for R.C.C. work including bending, binding and
placing in position complete upto floor two level
Masonary work using Aerated light weight concrete block having crushing strength not less
11 than 35kg/sqcm for super structure above plinth level upto floor two level in cement mortar 57.00 Cumt. 4528.57
1:5 ( 1 cement : 5fine sand ) complete as per Technical Specification
Estimated Total Amount
Estimated Total Amount
ITEM Rates According to
Item of Work Quantity Unit
Providing 15mm thick cement plaster in single coat on Rough (Similar)side of single or half
12 brick walls for interior plastering upto floor two level and 210.00 Sqmt. 176.58
finished even and smooth in (i) Cement mortar 1:3(1-cement:3-sand)
Providing 20 mm thick double coat mala cement plaster on interior brick / concrete work for
plastering comprising of base coat of 12 mm thick cement plaster in cement mortar (1
Cement : 4 coarse sand) in rough finishing and 8 mm thick top coat of cement mortar 1:2 (1
Cement : 2 Coarse sand) finished with trovel including scaffolding curing etc. complete.
Providing 20 mm thick water proof cement plaster using water proofing powder 1Kg/1bag of
cement for all floors on brick / concrete wall work using water proofing materials in C M 1: 4 (
1 cement 4 coasrse sand) including finishing with a flooting coat of neat cement slurry etc
complete for all floor. and shall be guaranteed for minimum period of 10 years after handing
over the completed building by the main contractor to be finished as directed. Stamp paper
guarantee 10 years to be furnished before receiving any payment from the client.
Finishing wall with weather proof low velocity ultima exterior emulsion paint on wall surface
15 (two coats) to give an required shape even shade after thoroughly brushing the surface to 380.00 Sqmt. 114.53
remove all dirt, and remains of loose powdered materials.etc complete for all height
Structural steel work ( Confirming to IS 4923-1997) riveted, bolted or welded in builtup for all
type sections, in framed work, including cutting,
hoisting, fixing in position and applying a priming coat of approved steel primer all complete
as per the structural designs and directions of Engineer incharge.
Constructing brick masonry chamber for underground C.I. Inspection chamber and bends
with briocks having croshing strength not less than 35Kg. Cm2 in C.M. 1:5 C.I. cover with
frame (Light duty) 455mm x 610mm intenal dimensions total weight of cover with frame to
be not less than 38Kg. (Wt. of cover 23 Kg.) and Wt. of frame 15Kg. ) (R.C.C. top slabe with
1:2:4 mix (1-cement :2- coarse sand :4-graded stone aggregate 20mm size) foundation
concrete 1:5:10 inside plaster 15mm thick with cement mortar 1:3 finished smooth with a
floating coat of neat cement on walls and bed concrete etc. complete.(iii) Inside dimensions
600mm x mm and 450mm deep for pipe lines with three or more inlets. (upto 10 ton)
STP on MBBR_Technology(75_KLD) PART -A, MEP WORK Planning, Designing, Detailing,
Manufacturing, Supplying,Erection, Testing and Commissioning of Sewage Treatment Plant
(STP) of 75 cu mt per day , including all electrical ,mechanical equipment, interconnected
piping, valves,pumps,instruments. Design and construction of RCC tanks i.e. oil & greace
chamber , collection tank, bio reactor tank , tube settler , chlorine contact tank and final
treated water tank with manhole cover & all other civil structure of the pump room of the
plant to complete the job. Connection of the underground sewage line to STP as well as
connection of treated water of STP to nearest drain and Bypass connection of STP to the
drain point with required civil,piping work & accesories all included in the scope of work.
Suitable size of Shade to be provided to cover up the entire STP plant. Aeration should be
provided in both Collection as well as Bio-Reactor Tank. All wetted parts should be in SS304.
18 STP should be based on MBBR Technology including primary treatment secondary treatment 1.00 Each 1916475.00
and tertiary treatment of having Multi Grade Filter, Activated Carbon Filter with necessary
chlorine contact system , Poly Electrolyte Dosing system complete to treat raw seawge from
Domestic liquid waste with output characteristics as follows : Parameter
B.O.D. (mg / Lit) : < 5 to 20 mg/Lit
C.O.D. (mg / Lit) : < 10 to 30 mg/Lit
Suspended Solids : < 25 mg/Lit
Oil & Grease (mg / Lit) : < 5 mg/Lit. It also includes operation and maintenance cost of STP
for 3 years form the actual date of completion without any extra cost
Supplying and fixing reinforced concrete heavy duty non-pressure pipes with collars for
culverts including setting and joining the pipes in C.M. 1:2 watering and laying (To level of
slops of I.S. 458 / 1971 Class NP3 of following internal diameter. 1800 mm dia.
Estimated Total Amount
Estimated Total Amount
ITEM Rates According to
Item of Work Quantity Unit
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced cement
conctere work , using cement content as per approved Design Mix manufactured in fully
automatic batching plant and transported to site of work in transit mixer for a lead up to
kms having continuous agitated mixer, manufactured as permix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from transit mixerof laying
20 ,excluding the cost of centering shuttering finishing andreinforcementincluding cost of 778.00 cmt 4841.03
admixtures i recommendedproportions as per IS: 9103 to accelerate/ retard setting of
concrete, improve workability withoutimpairing strength and durability as per direction of the
Engineer - in - charge. Without Fly Ash (Min cement level as per latest IS 456 shall
bemaintained)(B) Walls, from top of foundationlevel upto floor two level
Providing formwork of sheathing steel foamwork so as to give a rough finish including
centering shuttering strutting and propping etc. height of propping and centering below
supporting floor to ceiling not exceeding 4 M. and removal of the same for in situ reinforced
concrete and plain concrete work in.
(C) Vertical surface such as walls (any thickness) partitions and the like including attached
buttresses & string course & the like.
Providing & laying weep hole in Aburtments, and returns by using A.C. pipe of 100mm
22 including laying in proper grede and jointing the completed as per detailed specification. 20.00 no 89.20
Providing and fixing M.S. grills of required pattern to wooden frames of windows etc. with
23 M.S. flats at required spacings and frame alround, square or round bars with round headed 900.00 KG 106.23
bolts and nuts or by screws (A) Plain Grill.
Earthwork in cuting in all sorts of soil and soft murrum including conveying and spreading the
24 stuff, embankment as and where directed within 200meters from the end of the cutting with 1578.00 Cumt. 127.74
all required lead and lift.
Providing and fixing post and pipe railing as per detail drawing including 3(three) coats of
painting to steel works complete.
Providing & Filling farm clay or selected soil (Outside earth) in including watering with any
lead & lift as directed by EIC etc. complete
Providing pure doob (dharo )grass including watering and maintenance of the lawn for
year or more till the grass forms a thick lawn, freefrom weeds and fit for mowing including
27 supplying necessary farm clay , sludge, manure, pesticides , extra earth, disposal of rubbish, 1860.00 Smt 209.07
trench excavation and all labour with lead and lift etc. complete as directed by EIC.
I/We am/are willing to carry out the work at………………….% above/below percent(Should be written in
figures and words) of the estimated rate mentioned above. Amount of my /our tender works out as
Estimated amount put to tender
Estimated amount put to tender Deduct………% above
Deduct………% below Net
The Contractor shall exhibit a board with detailed specification and details of work as directed
1 by the Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
In alland Income
R.C.C. Itemstax
Ratewill be deducted
Analysis at Cement
Standard a sourceConsumption
while makinghas
payments of bills
been taken as per Govt. G.R.:
4 PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C.
items where there is a change as per actual mix design the cost of difference of cement consumption
have been deducted from the rate of original item at the rate of input rate mentioned in all the
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01_BOQ - KSU STP POND CD WORK.pdf
02_SBD for KSU STP POND CD R1.pdf
02A_R2a PRE QUALIFICATION - STP CD POND.pdf
03b_INDEX OF SPECIFICATION - KSU STP POND CD WORK.pdf
04_Civil _General Specification.pdf
04a_addictional Specification STP POND CD.pdf
05_Make List_Civil Work R1.pdf
06_Schedule for testing of material.pdf
07_HSE - Safety Aggrement.pdf
75 KLD STP FOR KAUSHALYA UNIVERSITY BASIC LAYOUT 20.04.2026.pdf
D-02-CULVERT DETAIL-R1-20.04.2026.pdf
FARM CLAY WITH GRASS FOR POND DETAIL 20.04.2026.pdf
00_Index for GR_KSU.pdf
01_2002-08-17_Site Board Placing.pdf
02_2008-11-27_Higly Unbalanced Rate.pdf
03_2009-12-31_10 Testing in GERI.pdf
04_2013-05-03_Imbalance Rate.pdf
05_2013-05-10_Bid Validity Period.pdf
06_2013-11-20_Regarding Acceptance of SD.pdf
07_2014-08-08_Royalty Payment.pdf
08_2016-05-12_Change in Defect Liability Period.pdf
09_2016-09-03_Tender to be Opened only for Registered Contractor.pdf
10_2017-02-15_TMT Lap Length Mesurement GR.pdf
11_2017-02-16_Star Rate in Case of Delay.pdf
12_2017-02-18_Single Tender to be Reinvited GR.pdf
13_2017-05-11_Cement Consumption.pdf
14_2017-07-11_Excess Quantity GR 10.pdf
15_2017-08-29_Tax according to GST Bill GR.pdf
16_2017-09-11_GST instead of VAT GR.pdf
18_Contractor Registration Paripatra.pdf
20_G. R_2.pdf
21 22_GR-3.pdf
23_Liability period G.R.pdf
24_Terms Conditions GR.pdf
25_ BUILDING GR.pdf
AMC GR CamScanner 07-06-2020 13_38_52-3 (2) (2).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .