| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.4 LAdmitted-Fee/PreQual/Technical/Finance EAST KANCHANBARI G P KUMARGHAT UNAKOTI TRIPURA PIN 799264 | UNAKOTI | TRIPURA | 799264 | +5.10% | ₹25.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹26.4 L+₹96,903.17 (3.82%)Admitted-Fee/PreQual/Technical/Finance GOMATI DISTRICT TRIPURA | +9.11% | ₹26.4 L+₹96,903.17 (3.82%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.2 L
EMD Value
₹48,331
Closing Date
7 Sept 2026, 3:00 pmClosed
Executive Engineer PWD R and B Kumarghat Division
Executive Engineer PWD R and B Kumarghat Division
Development of different roads within the Jurisdiction of Ganganagar P W D R and B Sub Division Under Special Assistance for capital investment during the year 2026 27 SH Repair of pot holes by soling patch repairing Carpeting Seal coat et
2026_CEPWD_76601_1
17/EE/KD/2026-27
Open Tender
Civil Works - Roads
Percentage
90 days
Ganganagar
As per DNIT
4 documents required · 4 mandatory
₹1,000
₹48,331
8 Sept 2026
1 Sept 2026
7 Sept 2026
1 Sept 2026
7 Sept 2026
1 Sept 2026
1 Sept 2026 - 7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying brick edging on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. | 1,038.2 | mtr | 252.36 | ₹2,62,000.15 |
| 2 | Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412.. | 989.76 | sqm | 579.1 | ₹5,73,170.02 |
| 3 | Providing and laying brick on edge soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with sand, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. | 167.73 | Sqm | 991.7 | ₹1,66,337.84 |
| 4 | Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or
any appropriate method, filled with 75 mm B.M, after applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per MoRD technical specification Clauses 1900, 502, 503 and 504. | 0.2 | Cum | 17,862.7 | ₹3,572.54 |
| 5 | Single bamboo palasiding/walling of whole 2nd class bamboo (Jati or Bethua) 65 to 75 mm dia and closely packed & driven @ 150 mm c/c including fitting fixing with half bamboo kamis horizontally in three rows with cane or tying with wire complete and struts 1.5 m apart longitudinally and providing bitumen drum sheet walling fixed with nails as per drawing and MoRD technical specification Clause 1302.5. A) Driven at least 900 mm below ground and 1200 mm above ground on average | 152 | mtr | 1,149.4 | ₹1,74,708.8 |
| 6 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5. | 247.05 | Cum | 245.4 | ₹60,626.07 |
| 7 | Providing and applying tack coat using hot straight run bitumen of grade VG-30, including heating the bitumen, spraying the bitumen, cleaning and preparing the existing road surface as per
specifications: On bituminous surface @ 0.50 Kg/ Sqm. | 657.36 | sqm | 41 | ₹26,951.76 |
| 8 | 20 mm thick Open-Graded Premix Carpet using Bituminous (Viscosity grade/ modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using Viscosity grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508.Case - II : By Manual Means (i) Bitumen of VG-30 | 657.36 | sqm | 336.8 | ₹2,21,398.17 |
| 9 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 510. Type D (premix with fine sand)ii.Bitumen (60/70 Grade) VG-30 | 657.36 | sqm | 77.1 | ₹50,682.46 |
stage.html
html • 0.02 MB
finance_77975.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.92 MB
17DNIT_merged.pdf
Tender Documents • 3.13 MB
BOQ_77975.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .