Tender Value
Refer Docs
EMD Value
₹13,929
Closing Date
9 Oct 2026, 6:00 pm
CHIEF ENGINEER (G)
Work of cleaning, maintenance and overhauling of various types of 6.6 KV HT Panel, LT MCC and charger panel during COH/AOH/ Shutdown of Unit 3, 4, 5 at GTPS
345196
EW-348
Open
Miscellaneous Works
Works
Gandhinagar
2 documents required · 2 mandatory
₹1,770
Gujarat State Electricity Corporation Limited Payable at Gandhinagar
₹13,929
17 Sept 2026
17 Sept 2026
17 Sept 2026
9 Oct 2026
17 Sept 2026
Date of opening of online Technical Bid, all
relevant documents submitted through online
process, Cover for Tender fee and EMD at 15:30
As per Tender Notice
Hrs (Online technical bid will be opened for
Bidders who have submitted Cover for Tender Fee
Tentative date of on-line opening of price bid (if Party has to be in touch with
possible) at 15.30 hrs. website
https://tender.nprocure.com
and also with e-mail sent by
EW- 348 PUR-F-006 RFQ-
Important Notes to Bidders:
(1) All the online Annexure and price bid, other tender documents (As per PQC) must be
submitted/attached through online form only. Bidder has to upload scanned copies of
original documents (Notarized / self-attested copies of original – as specified in tender
document) with bid. No physical documents to be submitted by bidder
(2) Payment of Tender Fee /Earnest Money Deposit (EMD):
Bidder shall have to pay Tender Fee & EMD as mentioned in the Tender Document either
in Demand Draft, Pay Order or Bank Guarantee (only for EMD) in favour of Gujarat State
Electricity Corporation Limited payable at Gandhinagar, Gujarat. The scanned copy of
original document shall have to be uploaded online with the bid and RPAD or Speed
Post only addressed to The Chief Engineer (G), Gujarat State Electricity Corporation
Limited, Thermal Power Station, Gandhinagar-382041.
(3) Being three part Bid, bidder shall have to submit their tender in three stages i.e.
PRILIMINARY STAGE (EMD Details- scan copy(online) & Original document- Hard Copy
submission), TECHNICAL STAGE (on line submission only) and COMMERCIAL STAGE
(on line submission only).
First preliminary stage will be opened and if the documents submitted by bidder
towards payment of Tender Fee & EMD are found ok, then only Technical Bid will be
opened (On-line). Tenders submitted without Tender Fee & EMD by the firms, will be
rejected without entering into further correspondence. Submission of required
documents for exemption of Tender Fee and EMD is mandatory.
The exemption in payment of Tender Fee and EMD shall be given to the,
1. Micro & small-scale enterprises which participate directly in tendering process for
the product which they are manufacturing / service which they are providing and
have Udyam registration for items / service under procurement.
2. Start-ups which participate directly in tendering process for the product which they
are manufacturing/service which they are providing and re-cognized by DPIIT
under the Start-up India Program and has obtained Udyam registration.
3. Organization which has registration certificate for the manufacturing product of the
tender, from Gujarat Khadi Gramodyog Board or Khadi and Village Industries
Commission(K.V.I.C)or Commissioner of Cottage Industries.
4. Board/Corporations/PSUs of the Central/State Government for their own
manufactured items.
5. State Government recognized organizations like(i) organizations for blinds, dumb
and deaf, disabled, mentally disabled persons;(ii)women's self-help group
recognized by Gujarat Livelihood Promotion Company; which participate directly in
tendering process for the product which they are manufacturing / service which
/they are providing.
6. OEM and service providers rendering services directly or by its own and having
annual turnover of INR 500 Crore or more
7. Sellers/Service Providers holding BIS license for the Primary Product Category
whose credentials are validated through BIS database.
1. Micro & Small Enterprises (MSEs) who participates directly in the tendering
process as Manufacturers or Service Providers, and holds a valid Udyam
Registration, are eligible for exemption from payment of Earnest Money Deposit
2. Agencies registered under Udyam in the capacity of Traders, Re-sellers, or similar
categories (i.e. other than Manufacturers/Service Providers) are not eligible for
3. Migration period for Reclassification of MSMEs: - In case of an upward change in
terms of investment in plant and machinery or equipment or turnover or both, and
consequent re-classification, an enterprise shall continue to avail of all non-tax
benefits of the category (micro or small or medium) it was in before the re-
classification, for a period of three years from the date of such upward change.
EW- 348 PUR-F-006 RFQ-
Vendor Registration with GSECL is not compulsory for submitting this tender.
(4) If any Bank Guarantee submitted against EMD/security deposit/PBG, same should be
valid one year from the date of expiry of BG. Bank Guarantee should be confirmed
through Structured Financial Messaging system (SFMS). SFMS allows intra/interbank
message transfer system of banking. Our bank details are as under.
ACCOUNT NAME GSECL
BANK NAME & BRANCH BOB, SECTOR-21, GANDHINAGAR
IFSC CODE BARB0GANDHI
(5) The tender received after time and date specified in the tender notice will not be
accepted. Once the offer Submitted by the Contractor before due date of
submission, the Contractor will not be allowed to submit revised/
additional/Modified/other after opening of bid. Any alterations/ modification to the
bids received after submission of offer shall not be considered unless carried for by the
Corporation in negotiation.
(6) Any deviation found in Data / Details / Documents between on line offer (e-tendering)
and physically submitted documents (Tender document fee, Technical offer of the bidder)
offer of the same bidder will not be considered and no any further communication in the
matter will be entertained.
Further bidders are requested to submit price – bid (Part-II) on-line only and not to
submit the price bid in physical form. This is mandatory. If price bid is submitted in
physical form, same will not be opened and only on-line submitted price bid will be
considered for evaluation. Further if the quantity quoted differs in the any of the technical
bid forms and in price bid forms, it is discretion of CE Committee –GSECL to consider the
quoted quantity.
(7) PLEASE MENTION:
(a) EPF Code No.: _________________ (The contractor shall have to submit in online the
attested copy of EPF code certificate issued by RPFC without fail otherwise tender will
not be considered )
(c) GSTIN Registration No. : _____________________________________ ( For Works & supply
(8) In case short submission of documents with bid and / or clarification if any required from
the bidder, The required details / documents may be asked from bidder.
(9) It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF
form) Remain legible and should not be password protected
(10) Tender will be evaluated on basis of Data / Details / Documents submitted by online
(11) It is mandatory for all the bidders to upload their tender documents by on line only (E-
tendering) in scheduled time. No documents shall be considered physically which are
mentioned for on-line submission only.
(12) The bidders are required to fill up all the online annexure / forms and shall be uploaded
invariably. This is intended for transparency and speedy evaluation of the bids. Instead of
simply confirming / attached in bid / refer physical offer, the Bidder shall fill in the
particulars against appropriate place in respect of each line appearing in each online
annexure. Wherever required, bidder shall invariably have to upload supporting authentic
documents in the online bid. (In the absence of required details in the online annexure,
the purchaser has every right to evaluate the bids accordingly and bidder cannot raise
any objection against any point during evaluation.
(13) Bidders are requested to remain in touch with the web-site for any amendment /
corrigendum or extension of due date etc
(14) EMD Fee Demand Draft with different purchaser or agency shall not be accepted. Tender
without EMD shall be rejected.
EW- 348 PUR-F-006 RFQ-
(15) The GSECL reserves the right to award the work to one or more bidders, considering their
technical and financial capacity OR to reject any or all tenders or accept any tender
without assigning any reason thereof.
(16) Once the offer Submitted by the Contractor before due date of submission, the Contractor
will not be allowed to submit revised/ additional/Modified/other after opening of bid. Any
alterations/ modification to the bids received after submission of offer shall not be
considered unless carried for by the Corporation in negotiation
(17) GSECL reserves the rights to reject any OR all tenders without assigning any reasons
(18) Vendor get to register in VMS System through vms.guvnl.com. For registration following
documents are required and mail to [email protected] and [email protected].
After registration vendor have to upload the invoice in the VMS system for smooth
functioning of payment.
Documents required for Registration:
(2) GST Certificate Copy
(4) Full Name of Vendor
Site : vms.guvnl.com
Username : PAN (PAN number)
Password : MyInvoice@123
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 348 PUR-F-006 RFQ-
BIDS FOR WORKS GENERAL CONDITONS
The tenderers should thoroughly read all the following clauses before submitting their tender.
online tender with Tender Fee & EMD Fee cover will be opened as per tender notice date
and time. and if the documents towards payment of Tender Fee & EMD are found OK then
only, offer of the bidder will be considered for further evaluation.
EMD will be forfeited (i) if the tender, which it covers, is withdrawn during the validity of
the offer and (ii) the Tenderer fails to furnish / deposit the security deposit.
“It shall be mandatory to submit security deposit within 10 days from the date of issue of
Letter of Intent before order placement. In case when successful bidder not at all
responding within notice period or withdraws his offer then his EMD shall be forfeited and
he will not be allowed to participate in the tenders invited from the same office for the
period of One year for that place from where tender is invited.”
1. TECHNICAL BID: (Online only not by physically)
1.1) The technical bid comprises scope and nature of works and quantity of works/jobs,
drawings (Refer Schedule-B), required technical qualification for execution of the
works/job etc. for which price are to be quoted. Also, all the technical details of the
stores/materials offered in accordance with the Corporation scope of work, specification
guaranteed technical particulars and conditions, etc
The supplier/contractor should mention separate HSN/SAC code and rate of GST and
cess as applicable for each item of goods/services. If no specifically mentioned then
company will have option to take the prices as exclusive of taxes and duties at maximum
higher slab rates for the evaluation of tenders.
1.2) The Technical Bid shall be opened as per Tender Notice (If possible).Please note that the
required documents should be invariably submitted in online only. If party has not
submitted tender in online is liable to be ignored.
1.3) Contractor has to submit all required documentary evidences thereof to qualify for
acceptance of their technical bid. The acquisition of the tender documents by any party
will not automatically qualify the party as to its capability to execute such or similar
orders. The Corporation shall assess the capability of the party at the time of evaluation of
the technical bids.
1.4) The submission of the offer by any contractor does not mean that the bidder is qualified
for execution of the works. After opening of the online technical bids, the competent
authority will evaluate on the basis of technical qualification criteria. If contractor’s bid
does not meet the technical qualification criteria, then his technical bid will be ignored.
Decision taken by the CE(G),GTPS will be binding to all in this regard.
2.1) The price bid comprises Schedule-B, in which the tenderer has to offer their rates in
accordance with the technical specification specified in technical bid with all commercial
terms and condition. The Price Bid must be submitted strictly as per Schedule-B and
shall be submitted online only, not by physically.
Incomplete bids and amendments and additions to bids after opening of the bids will be
ignored out rightly.
The price bid of those who are techno-commercially qualified shall be opened. After
technical bid is opened, for modification, if any, all shall be given equal chance.
2.2) Price bids of technically acceptable tenders shall be opened after analyzed &scrutiny of
the technical bid.
2.3) The ‘TECHNICAL” and ‘PRICE” Bids shall contain adequate cross-reference wherever
necessary to ensure clear and proper co-relation of the two bids without ambiguities
whatsoever. Any technical questions information and clarifications that may be required
pertaining to this Tender should be referred to the Chief Engineer (Gen), Gandhinagar,
TPS-382041 reserves the right to reject any OR all tenders without assigning any reasons
2.4) Bidders have to quote their rates online only as per GSECL’s given format of price bid.
2.5) The offered prices to be indicated in online mode of tender in the format given (i.e.
Schedule-B) the price bid submitted in physical mode shall not be considered.
EW- 348 PUR-F-006 RFQ-
CONDITIONS FOR PRICE BID
a) For Works & Supply GST rate will be paid with the applicable GST rules.
b) For Supply Portion Only:-“Party shall have to quote their rates in Schedule “B” of price
bid only along with commercial terms and conditions. The details of applicable GST,
service charges, packing & forwarding charges, freight, insurance, F.O.R. etc.
The supplier/contractor should mention separate HSN/SAC code and rate of GST and
cess as applicable for each item of goods/services. If no specifically mentioned then
company will have option to take the prices as exclusive of taxes and duties at maximum
higher slab rates for the evaluation of tenders.
It is mandatory to indicate GST NO in annexure 10a of tech. bid otherwise if no
specifically mentioned then company will have option to take the prices as exclusive of
taxes and duties at maximum higher slab rates for the evaluation of tenders.
3. Applicability of Goods and Service Tax (GST):-
(a) The tenders shall be evaluated on firm price and cost with GST and cess as applicable
unless otherwise mentioned in the tender documents.
(b) If the supplier/contractor have opted for the composition scheme of GST, the same
must be clearly specified with valid declaration and certificate from department. In the
event of withdrawal/ cessation of the supplier from composition scheme during the tenure
of the contract, the rate(i. e. price) mentioned in the price bid shall be final and any
additional GST will have to be borne by the tenderer himself, In no case additional
amount towards GST or otherwise will be paid/reimbursed to supplier/contractor.
(c) The bidder shall have to inform their GST no. of the registered place(s) where from the
bidder intends to supply the goods/services, meaning there by the bidder has to supply
the goods/services from the relevant declared/ registered place(s) of supply only.
(d) The bidder shall not include GST in their quoted rates; but the bidder has to separately
indicate the GST rate, amount in the price bid schedule.
(e) In-case Govt notification comes for change in GST , the same will be applicable.
(f) Bidder should indicate GST no.( copy of GST registration to be enclosed) and PAN NO.
(copy of PAN to be enclosed) Tenders submitted without GSTIN No by the firms, the
offer will be rejected without entering into further correspondence.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 348 PUR-F-006 RFQ-
Other Terms & Conditions
1. Contractor shall indemnify GSECL against for any injury and/or damage that may be
caused in his man or material. Moreover, the contractor shall be fully responsible for any
damage caused to the Corporation’s properties done by his man/materials while
executing the work. The Corporation will be entitled to recover the damage from the
2. At any time if GSECL feels that progress of work is unsatisfactory and work force of
contractor is inadequate, other agencies/ departmental personnel will be put in parallel
for expediting the work. Amount so incurred will be recovered from the contractor’s bill. In
this case decision of the Engineer-in-charge shall be final and binding to the contractor.
3. At any stage of the contract period, if the contractor fails to complete the job or his work
is not found satisfactory the same will be got done at his cost and risk and additional
expenditure incurred by the Corporation will be recovered from him by giving one week's
4. To sublet or transfer of contract without prior written approval of Corporation shall be
treated as breach of contract and it shall be punishable by forfeiting the S.D. as well as
termination of contract.
5. The Corporation reserves the right to forfeit the S.D. in case of any breach of contract and
in case of disputes. The decision of Chief Engineer (Gen), TPS GANDHINAGAR shall be
final, binding & acceptable to the Contractor. If contractor fails to start the Work as
Stipulated, the E.M.D. & S.D. Shall be forfeited.
6. Conditional tender will not be accepted. Withdrawal of tender condition unilaterally
by you before or after opening of tender will not be permitted.
7. The contractor has to carry out the required work strictly according to guidance given by
the Corporation's responsible officer.
8. The Corporation reserves the right whether the materials to be accepted, or not. Only
specified and scheduled materials are to be examined by Corporation's officer and then if
suitable will be accepted by the Corporation.
9. The contractor shall submit his bill in triplicate to the CE(G), GSECL, TPS, Gandhinagar
which will be paid after the certificate regarding correct receipt of the materials in good
10. The rates should be quoted without any condition. The rates be written in words and
figures legibly.
11. Revision of prices or any commercial terms affecting the price after opening of
technical bids shall not be considered and will be ignored.
12. The contractor shall have to execute an agreement with the Corporation on a non judicial
stamp paper, the cost of which will have to be borne by the contractor and will have to
sign the contract and tender booklet of the Corporation.
13. SECURITY DEPOSIT: In tender process for L1 bidder(lowest bidder) security deposit
will be charged as per table below:
Category of the Unit Security Deposit
Works up to Rs. 5 Works More than Rs.
Enterprise or Exempted 3% of Order Value
Organization which are
exempted from paying
For all other Enterprises 5% of Order Value 5% of Order Value
Note: Security Deposit will be collected from the successful tenderer at the rates mentioned
above. This may be recovered by deduction through running bills of the contractors and / or by
treating the Earnest Money Deposit (Bid Security) paid at the time of submission of the tender.
14. The Bank Guarantees will be executed on the standard form prescribed by the
corporation. In case of the Bank Guarantees furnished / submitted, they should have
clear one time validity till the completion of the order in all respects and up to the expiry
of Guarantee period from the date of the work completion. Bank Guarantee for Interim
period will not be allowed. If by any reasons the work period is extended then contractor
EW- 348 PUR-F-006 RFQ-
should undertake to renew the Bank Guarantee at least one month before the expiry of
the validity failing which GSECL will be at liberty to encash the same.
“It shall be mandatory to submit security deposit as per above table within 10 days
from the date of issue of Letter of Intent before order placement. In case when
successful bidder not at all responding within notice period or withdraws his offer
then his EMD shall be forfeited and he will not be allowed to participate in the
tenders invited from the same office for the period of One year for that place from
where tender is invited.”
If the Tenderer fails to pay the Security Deposit or defaults in execution of
the orders placed or if GSECL suffers any financial loss due to this, then GSECL will
be at liberty to adjust the amount from other orders of the same firm or by
encashing the Bank Guarantee.
All the costs of the stamp papers, other than required for payment is to be made
through SIDBI / ICICI by Board, are to be borne by you as per the Govt. of India’s latest
15. VALIDITES OF THE OFFERS:
The offers will have to be kept valid for a period of 180 days from the date of opening of
technical bids. In case of finalization of the tender is likely to be delayed, the tenderers
will be asked to extend the same without change in the prices or any terms and
conditions of the offer. If any change is made, original or during the extended validity
period, the offers will be liable for outright rejection without entering into further
correspondence in this regard and no reference will also be made.
16. If successful contractor fails to pay the required security deposit and does not come
forward to execute the work, the full value of EMD will be forfeited by the Corporation.
17. Any terms and conditions mutually agreed to writing shall be for a part of the contract.
18. Payment will be made as per GSECL’s rule.
19. The authorized officer/person of the Corporation will have the liberty to check the
material and work etc.
20. Regarding the quality and acceptance of the jobs the authorized officer's decision will be
binding and final and no dispute on this account will be entertained.
21. General terms and conditions of the Corporation for works contract will be made
applicable for this work also.
22. No material for the said work will be supplied by the GSECL except specified in schedule
23. WORK COMPLETION PERIOD: The Tenderers will have to confirm work completion
period as specified in this tender. Delay in execution of order on account of any other
reason will be subject to penalty.
24. PBG (Not Applicable) : “The supplier/contractor/party (i.e. tenderee) has to give Bank
Guarantee with validity period of additional 01 (one) month i.e. more than actual
Guarantee/Warranty period of 6/12/18/24/36/48/60 months (depending upon product)
to safeguard Company’s interest in case of any eventuality happening on the last day of
the Guarantee/Warrantee period after office hours of the Bank or Bank holidays.”
25. PENALTY Clause:
25.1 Penalty for work delay :- Any delay that may take place in execution beyond contractual
cutoff date / stipulated period in the order shall be subjected to penalty (not liquidated
damages) at the rate of ½% of the contract price / order price per week or part thereof subject
to a maximum of 10% of the total contract value / order value (i.e. End cost including taxes &
EW- 348 PUR-F-006 RFQ-
25.2 Penalty table for Minimum manpower to be engaged per job
Sr. Unit Minimum manpower Penalty per person per day
Description of Work
No. to be engaged per job
Cleaning and maintenance of 6.6 1.5 x ( Work order Job Rate )
01 JOB 1 skilled and 4 unskilled
KV US Bus of Unit-3/4/ 5
Cleaning and maintenance of 6.6 1.5 x ( Work order Job Rate )
02 JOB 1 skilled and 7 unskilled
KV Station Bus of Unit-3/4/ 5
Cleaning and maintenance of 1.5 x ( Work order Job Rate )
03 JOB 1 skilled and 4 unskilled
415 V SSS Bus of Unit-3/4/ 5
Cleaning and maintenance of 1.5 x ( Work order Job Rate )
415 V USS Bus of Unit-3/4/ 5 1 skilled and 4 unskilled
Cleaning and maintenance of
05 415 V Emergency Bus of Unit- JOB 1.5 x ( Work order Job Rate )
1 skilled and 4 unskilled
Cleaning, washing & power
06 connection tightness of UST & JOB 1.5 x ( Work order Job Rate )
1 skilled and 3 unskilled
SST Transformer of Unit-3/4/ 5
Cleaning & maintenance of 1-
07 Phase/ 3- Phase Transformer of JOB 1.5 x ( Work order Job Rate )
1 skilled and 2 unskilled
Cleaning & maintenance of 1-
08 Phase/ 3- Phase ACDB of Unit- JOB 1. x ( Work order Job Rate )
1 skilled and 2 unskilled
Cleaning & maintenance of 220V
09 DCDB of Unit-3/4/5 during JOB 1.5 x ( Work order Job Rate )
1 skilled and 2 unskilled
AOH/COH/ Shutdown period
Cleaning & maintenance of 26V
10 DCDB of Unit-3/4/5 during JOB 1.5 x ( Work order Job Rate )
1 skilled and 2 unskilled
AOH/COH/ Shutdown period
Cleaning & maintenance of
Battery Charger of Unit-3/4/5 1.5 x ( Work order Job Rate )
during AOH/COH/ Shutdown 1 skilled and 2 unskilled
Cleaning & maintenance of UPS
Charger and UPS ACDB of Unit- JOB 1.5 x ( Work order Job Rate )
12 1 skilled and 3 unskilled
3/4/5 during AOH/COH/
Shutdown period
26. Statutory variations:-any statutory increase or decrease on the taxes and duties
subsequent to your offer if it takes place within the original contractual delivery date will
be to the company’s account subject to the claim being supported by documentary
evidence. However if any decrease takes place after the contractual delivery date the
advantage will have to be passed on the company
27. If the work is not done as per specification given by the GSECL in stipulated time in all
respects, the penalty will be levied as per GSECL's rules.
28. The GSECL shall have the right to make any changes, additions / deletions or
modifications in any terms / conditions of the tender and / or specifications as may be
deemed necessary by the GSECL at its sole discretion at any time before the due date of
opening of the tender.
EW- 348 PUR-F-006 RFQ-
29. Tenderer should furnish a list of orders for similar work executed by them indicating the
name of the party and their order reference to whom they have worked, to be furnished in
Annexure- 6. Failure to do this will result on contractor’s tender being rejected without
30. GSECL does not accept the printed conditions of any Tenderer. It will be ignored without
any reference; hence tenderers should withdraw such printed conditions if they have any.
31. Tenders will be accepted only on or before due date and time of opening.
32. If technical deviations furnished by the Tenderer are not agreeable to the GSECL, the
offers may be ignored. However it will be solely at GSECL’s discretion to consider the
technical deviations OR not for considering the Tenderer. No correspondences of the
Tenderer after opening of the bid will be entertained in this matter.
33. The contractor will be responsible and liable for any damage to man and materials during
34. While execution of this job our plant and auxiliaries will be in running conditions. Hence
contractor has to take all precautions for safety etc. Safety belts etc. also to be used
wherever necessary while working.
35. GSECL reserve the right to terminate the contract if quantity shown in Schedule-B is
executed earlier.
36. All the terms and conditions specified in Industrial & safety laws are binding on the
37. Registration certificate under labor contract act will have to be obtained before execution
38. The laborers shall be supplied for 8 hours a day, so contractors shall arrange accordingly.
39. The following List of Annexures and Documents (available in this tender document)
should be invariably submitted along with the tender:
(i) Schedule–“A” Indicating the Description of work & quantities for the tender.
(ii) Schedule–“B” Price Bid to be submitted online ONLY”
(iii) Annexure-“A” - Technical Scope of Work
(iv) Form of Bankers undertaking Performa for E.M.D and S.D.
(v) Annexures – 1 TO
(vi) Certificate – “A”.
(vii) Document of Important Instructions.
All the above documents should be duly filled in, signed & stamped with company’s seal
should be submitted along with the Technical Bid in online only.
40. Please note that any additional conditions / deviations, if any, found in the Commercial
terms & conditions, then the Price Bids of such tenderers will not be opened and no
further correspondences in the matter will be allowed.
41. Tenderer should invariably fill up all the details of all the Annexure of this tender
document. This is mandatory. Also all the Annexures should be duly signed by authorized
signatories with their rubber stamp and along with Company’s Rubber (Round) seal /
stamp affixed on each paper.
42. All the tenderers must ensure that all the relevant documents / papers submitted with
the tender should be serially numbered, and properly documented. This must be adhered
43. All the above points should be complied by the Tenderers. If not, tenders are likely to be
ignored without making any further reference.
44. If participating bidder/agency have stake in one or more other agencies / bidder who are
participating in same tender and on account of submission of wrong information /
declaration in the tender / enquiry certificate – A, then the bidder will be declared as
disqualified automatically and EMD / SD will be forfeited. Further, GSECL shall take
stern action including stop dealing with their firms’
45. The CE(G),GSECL, Gandhinagar, reserves right to reject/accept any or all tenders without
assigning any reasons thereof and to split up the work between the parties as the case
46. Relationship of employee: - Every bidder should, at the time of submission of bid, give a
declaration as under.
“If in any bidder company/firm, the interest (i.e. Shareholding in company and share in
partnership firm) of any employee of the tendering Company or his/her relative as defined
EW- 348 PUR-F-006 RFQ-
in section 2(77) of the Company’s act. 2013 is 10% or more, the tendering Company will
not deal with such company/firm at all.
Tenderer therefore, must specifically disclose this fact in his technical bid. Non-disclosure
of such facts would immediately disqualify the tenderer for further dealing with the
tendering company.”
47. Conflict of interest among Bidders/Agents: A bidder shall not have conflict of interest
with other bidders. Such conflict of interest can lead to anti-competitive practices to the
detriment of Procuring Entity’s interests. The bidder found to have a conflict of interest
shall be disqualified. A bidder may be considered to have a conflict of interest with one
more parties in this bidding process, if:
a) they have proprietor/partner(s)/Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/financial stake from any
c) they have the same legal representative/agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties, that
puts them in a position to have access to information about or influence on the of bid
of another bidder; or
e) Bidder participates in more than one bid in this bidding process. Participation by a
bidder in more than one Bid will result in the disqualification of all bids in which the
parties are involved. However, this does not limit the inclusion of the
components/sub-assembly/assemblies from one bidding manufacturer in more than
f) in cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their
behalf in a particular tender enquiry. One manufacturer can also authorize only one
agent/dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf;
2. Indian/foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of the
design or technical specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing
units, or more than one unit having common business ownership/management, only
one unit should quote. Similar restrictions would apply to closely related sister
companies. Bidders must proactively declare such sister/common business/
management units in same/similar line of business.
i) Bidder shall not act in contravention/violation to the provisions of competition act,
as amended from time to time. Every bidder should, at the time of submission of
bid, give a declaration, that bidder shall not have conflict of interest with other
bidders, as above
48. All bidders shall submit the details/documents in support of Technical Qualification
Requirements duly certified and verified for authenticity from Specified Third-Party
inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm
along with a certificate regarding verification of authenticity of documents as per the format
placed at Annexur-1. All the documents submitted by the bidder in support of the meeting
Technical QR only shall be digitally signed by the Specified Third-Party inspection Agency
(TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm.
The verification and certification of authenticity of documents is acceptable from any of the
1. M/s Competent inspectorate and Consultants Pvt. Ltd, Hyderabad, India.
2. M/s Gulf Lloyds industrial Service India Pvt. Ltd.-Ahmedabad.
3. M/s international Certifications Services.
4. M/s Intertek India Pvt. Ltd.
5. M/s SGS India Pvt. Ltd.
6. M/s Moody International (India) Pvt. Ltd.
7. M/s TUV SUD South Asia (P) Ltd.
EW- 348 PUR-F-006 RFQ-
8. M/s TUV Rheinland (India) Pvt. Ltd.
9. M/s Bureau Veritas (India) Pvt. Ltd.
10. Hertz Inspection & Services Pvt. Ltd.
11. IRCLASS Systems and Solutions Pvt. Ltd.
Verification for authenticity shall not be applicable in following cases.
1: Bidders having proven track record or regular suppliers/contractors (i.e.
2: Past order copies of GSECL as these documents can be verified internally.
Bidders shall be responsible for getting their documents/ credentials verified & certified by
the Specified Third-Party inspection Agency (TPIA) or Statutory Auditor of their Company or
Practicing CA/CA Firm in support of Technical QR. All the costs pertaining to third party
verification and certification (including those by statutory auditors) shall be borne by the
Bidder. GSECL shall have no liability (financial or otherwise) towards the same and shall
not be liable for any claim/ dispute between the bidder and the Specified Third-Party
inspection Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm
Chief Engineer (G)
GSECL: Gandhinagar TPS
I/ We hereby agree for the terms & conditions laid down in Tender.
Contractor's Signature
With Seal & Date
EW- 348 PUR-F-006 RFQ-
Undertaking from Third Party Inspection Agency/Statutory Auditor or Practicing
(On letter head digitally signed by a person duly authorized to Sign on behalf of the firm)
Gandhinagar TPS.
Subject: Authentication of veracity of documents submitted by M/s …….. in support of
Meeting the Qualifying Requirements
Ref : Tender no.: ________________
M/s._______________________________________________(hereinafter called Bidder) having
Registered office at_____________________intend to participate in above referred tender of
The tender condition stipulates that the bidder shall submit supporting Documents
pertaining to Qualifying Requirement duly verified and certified by Third-Party Inspection
Agency (TPIA) or Statutory Auditor of their Company or Practicing CA/CA Firm as per the list
mentioned in the bidding documents.
In this regard, it is hereby confirmed that we have examined the following documents, which
are also attached with this letter. The same has been verified from the Original Documents
and / or Client for authenticity.
We hereby confirm that the following documents are found to be genuine and authentic.
1. Doc ref. no. _________________________ dated______________ (name of Documents)
2. Doc ref. no. _________________________ dated ______________ (name of Documents)
All the aforesaid documents have been digitally signed by us as a certificate of authenticity.
We further confirm that we neither have any vested interest in aforesaid tender nor have any
conflict of interest in respect of above tender.
This certificate is issued at the request of M/s._____________________________ (Bidder) for the
purpose of participating in the subject tender/s.
EW- 348 PUR-F-006 RFQ-
General Terms & Conditions
1. Contractor shall indemnify GSECL against for any injury and/or damage that may be
caused in his man or material. Moreover, the contractor shall be fully responsible for any
damage caused to the Corporation’s properties done by his man/materials while
executing the work. The Corporation will be entitled to recover the damage from the
2. At any time if GSECL feels that progress of work is unsatisfactory and work force of
contractor is inadequate, other agencies/ departmental personnel will be put in parallel
for expediting the work. Amount so incurred will be recovered from the contractor’s bill.
In this case decision of the Engineer-in-charge shall be final and binding to the
contractor. At any stage of the contract period, if the contractor fails to complete the job
or his work is not found satisfactory the same will be got done at his cost and risk and
additional expenditure incurred by the Corporation will be recovered from him by giving
one week's notice.
3. Subletting the contract to other agency is not permitted unless and otherwise approved
by the competent authority.
4. The contractor has to carry out the required work strictly according to guidance given by
the Corporation's responsible officer.
5. The Corporation reserves the right whether the materials to be accepted, or not. Only
specified and scheduled materials are to be examined by Corporation's officer and then if
suitable will be accepted by the Corporation.
6. The contractor shall submit his bill in triplicate to the CE(G), GSECL, TPS, Gandhinagar
which will be paid after the certificate regarding correct receipt of the materials in good
7. Any terms and conditions mutually agreed to writing shall be for a part of the contract.
8. The authorized officer/person of the Corporation will have the liberty to check the
material and work etc.
9. Regarding the quality and acceptance of the jobs the authorized officer's decision will be
binding and final and no dispute on this account will be entertained.
10. General terms and conditions of the Corporation for works contract will be made
applicable for this work also. The booklet is attached herewith.
11. No material for the said work will be supplied by the Corporation except specified in
schedule thereof.
12. Penalty Clause:
12.1 Penalty for work delay :- Any delay that may take place in execution beyond
contractual cutoff date / stipulated period in the order shall be subjected to penalty (not
liquidated damages) at the rate of ½% of the contract price / order price per week or part
thereof subject to a maximum of 10% of the total contract value / order value (i.e. End cost
including taxes & duties).
12.2 Penalty table for Minimum manpower to be engaged per job
Minimum manpower
Sr. Unit Penalty per person per day
Description of Work to be engaged per
Cleaning and maintenance of 6.6 1.5 x ( Work order Job Rate )
01 JOB 1 skilled and 4 unskilled
KV US Bus of Unit-3/4/ 5
Cleaning and maintenance of 6.6 1.5 x ( Work order Job Rate )
02 JOB 1 skilled and 7 unskilled
KV Station Bus of Unit-3/4/ 5
Cleaning and maintenance of 1.5 x ( Work order Job Rate )
03 JOB 1 skilled and 4 unskilled
415 V SSS Bus of Unit-3/4/ 5
Cleaning and maintenance of JOB 1.5 x ( Work order Job Rate )
04 1 skilled and 4 unskilled
415 V USS Bus of Unit-3/4/ 5
Cleaning and maintenance of
05 415 V Emergency Bus of Unit- JOB 1.5 x ( Work order Job Rate )
1 skilled and 4 unskilled
EW- 348 PUR-F-006 RFQ-
Cleaning, washing & power
06 connection tightness of UST & JOB 1.5 x ( Work order Job Rate )
1 skilled and 3 unskilled
SST Transformer of Unit-3/4/ 5
Cleaning & maintenance of 1-
07 Phase/ 3- Phase Transformer of JOB 1.5 x ( Work order Job Rate )
1 skilled and 2 unskilled
Cleaning & maintenance of 1-
08 Phase/ 3- Phase ACDB of Unit- JOB 1. x ( Work order Job Rate )
1 skilled and 2 unskilled
Cleaning & maintenance of 220V
09 DCDB of Unit-3/4/5 during JOB 1.5 x ( Work order Job Rate )
1 skilled and 2 unskilled
AOH/COH/ Shutdown period
Cleaning & maintenance of 26V
10 DCDB of Unit-3/4/5 during JOB 1.5 x ( Work order Job Rate )
1 skilled and 2 unskilled
AOH/COH/ Shutdown period
Cleaning & maintenance of
Battery Charger of Unit-3/4/5 1.5 x ( Work order Job Rate )
during AOH/COH/ Shutdown 1 skilled and 2 unskilled
Cleaning & maintenance of UPS
Charger and UPS ACDB of Unit- JOB 1.5 x ( Work order Job Rate )
12 1 skilled and 3 unskilled
3/4/5 during AOH/COH/
Shutdown period
13. Statutory variations:-any statutory increase or decrease on the taxes and duties
subsequent to your offer if it takes place within the original contractual delivery date will
be to the company’s account subject to the claim being supported by documentary
evidence. However if any decrease takes place after the contractual delivery date the
advantage will have to be passed on the company.
14. The contractor will be responsible and liable for any damage to man and materials
during his work.
15. While execution of this job our plant and auxiliaries will be in running conditions. Hence
contractor has to take all precautions for safety etc. Safety belts etc. also to be used
wherever necessary while working.
16. Corporation reserve the right to terminate the contract if quantity shown in Schedule-B
is executed earlier.
17. All the terms and conditions specified in Industrial & safety laws are binding on the
18. Registration certificate under labor contract act will have to be obtained before execution
19. The laborers shall be supplied for 8 hours a day, so contractors shall arrange
20. Payment Terms: Party has to accept payment terms as per GSECL rules only i.e. as per
actual work done. NO ADVANCE payment will be allowed. Net Payment will be released
within 30 days after completion of work and submitting their relevant invoices.
21. Dispute Resolution Mechanism: For works contracts and composite Contracts, the
arbitration mechanism shall be governed by the Gujarat Public Works Contracts
Disputes Arbitration Tribunal Act, 1992 as per below details.
(1) Amicable Settlement : "Any dispute, difference, controversy or claim between the parties
arising out of or relating to this contract with reference to the construction,
interpretation, breach, termination or validity thereof (herein after referred as "the
Dispute") shall, upon the written request of either party by referred to the authorized
representatives of the Disputing Parties for resolution. The authorized representatives
EW- 348 PUR-F-006 RFQ-
shall promptly meet and attempt to negotiate in good faith a resolution of the Dispute
within thirty days of the service of the request."
(2) Arbitration: If the Parties fail to amicably resolve the disputes or differences or contrary
claims as indicated herewith in sub clause (1) of Clause 21 arising under or in
connection with the present works contracts, whether pertaining to works contracts
alone or works and procurement both, the same shall be referred to arbitration under
the Gujarat Public Works Contracts Disputes Arbitration Tribunal Act, 1992."
22. For procedure for health check-up accordingly bill shall be reimbursed once during total
contract period (for as & when and AOH/COH contract) maximum up to Rs.1000 or
actual cost per worker/ labour /person, whichever is minimum after verification &
recommendation by concern doctor. In case any worker left the work in between than for
replacement Worker Company will not provide any reimbursement, however it is
compulsory to submit new report of replacement worker for fitness certificate at
contractor’s own expense.
23. For Periodic Medical examination, No reimbursement for periodic medical examination to
be given to contract employee for whom GSECL are conducting Periodic Medical
examination at company’s cost at GTPS. If a contractor fails to undergo periodic medical
examination, they have to undergo prescribed investigation as per hazard analysis from
outside, No reimbursement to be given for these investigations.
Chief Engineer (G)
GSECL: Gandhinagar TPS
I/ We hereby agree for the terms & conditions laid down in Tender.
Contractor's Signature
With Seal & Date
EW- 348 PUR-F-006 RFQ-
BID - QUALIFICATION CRITERIA FOR TECHNICAL BID
Work of cleaning, maintenance and overhauling of various types of
Sub: KV HT Panel, LT MCC and charger panel during COH/AOH/ Shutdown of
Unit 3, 4, 5 at GTPS.
Pre-Qualification Criteria (PQC) (To be submitted with Technical Bid):-
The bidders are requested to submit the technical bid with the following credentials for
technically qualifying criteria in soft ONLY.
Technical Bid Qualifying Criteria regarding
1 The bidder should produce certificate/ document as evidence of having an
experience for similar work* carried out satisfactorily in government / semi
government / state electricity board / corporation body / private limited
company / public limited company during last 7 years ending last day of
month previous to the one in which applications are invited should
be either of the following:
a. Three similar completed works costing not less than the amount equal to
Rs. 1,85,723/- of the estimated cost.
b. Two similar completed works costing not less than the amount equal to
Rs. 2,32,154/- of the estimated cost.
c. One similar completed work costing not less than the amount equal to
Rs. 3,71,446/- of the estimated cost. for similar work, means “Work of
Cleaning & off line maintenance of HT/LT switchgear panels OR off line and
external maintenance of HT/LT Motors OR External cleaning and
maintenance of transformer, switchyard equipment OR cleaning, shifting
erection of High voltage rectifier switch gear /transformer and panel off line
maintenance etc related work”
2 The Average Annual Turnover of the bidder, shall not be less than
Rs.1,39,292/- (Rupees One Lacs Thirty Nine Thousand Two hundred
ninety two only) during the preceding three (3) financial years as one
date of Techno-Commercial bid opening.
2) Net worth of bidder shall not be less than 100% of the bidder’s paid up
share capital as on the last day of the preceding financial year. In case
the Bidder meets the requirement of Net worth based on the strength of
its Subsidiary (ies) and/or Holding company and/or Subsidiaries of its
Holding Companies wherever applicable, the Net worth of the Bidder and
its Subsidiary (ies) and/or Holding company and/or Subsidiary (ies) of the
Holding Company, in combined manner should not be less than 100% of
their total paid up share capital. However individually, their Net worth
should not be less than 75% of their respective paid share capitals.
Net worth in combined manner shall be calculated as follows:
Net worth (combined )= (x1+x2+X3)/(y1+y2+y3) X 100, where x1,x2, x3
are individual net worth which shall not be less than 75 % of the
respective paid up share capitals and y1, y2, y3 are individual paid up
share capitals.
3) In case the bidder is not able to furnish its audited financial statements
EW- 348 PUR-F-006 RFQ-
on stand- alone entity basis, the unaudited unconsolidated financial
statements of the bidder can be considered acceptable provided the
bidder further furnishes the following documents for substantiation of its
• Copies of the unaudited unconsolidated financial statements of
the bidder along with copies of the Audited consolidated financial
statements of its Holding Company.
• A Certificate from the CEO/CFO of the Holding Company, stating
that the unaudited unconsolidated financial statements form part of the
Consolidated Annual Report of the company.
4) In cases where audited results for the last preceding financial year as
on the date of techno-commercial bid opening are not available, the
financial results certified by a practicing Chartered Accountant shall be
considered acceptable. In case, Bidder is not able to submit the
Certificate from practicing Chartered Accountant certifying its financial
parameters, the audited results of three consecutive financial years
preceding the last financial year shall be considered for evaluating the
financial parameters. Further, a Certificate would be required from the
CEO/CFO, stating that the Financial results of the Company are under
audit as on the date of Techno commercial bid opening and the
Certificate from the practicing Chartered Accountant certifying the
financial parameters is not available.
5) The bidder must submit Average Annual Turnover and Net worth
Certificate in support of Financial QR, duly certified and verified for
authenticity from Independent Statutory Auditor of their company /
Practicing Charted Accountant/ C.A. Firms / TPIA (Third-Party Inspection
Agency ) empaneled / approved by GSECL along with copy of Annual
Audited Accounts of last three years
Note for point No.1, 2, 3&4:
i. Other income shall not be considered for arriving at annual turnover.
ii. “Holding Company" and “Subsidiary Company” shall have the meaning
ascribed to them as per Companies Act of India, in vogue.
iii. Net worth means the sum total of the paid up share capital and free
reserves. Free reserve means all reserves credited out of the profits and
share premium account but does not include reserves credited out of the
revaluation of the assets, write back of depreciation provision and
amalgamation. Further, any debit balance of Profit and Loss account and
miscellaneous expenses to the extent not adjusted or written off, if any,
shall be reduced from reserves and surplus.
3 Details of P.F. code No. from the appropriate provident fund authorities and
registration certificate of provident fund account number.
4 Bidder shall have to submit the PAN card No for Income Tax with
documentary proof.
5 Details of registered partnership deed, incase of partnership firm and
activities of association and memorandum of association, in case of
6 Copy of the valid labour contract license (if applicable as per govt. guideline)
EW- 348 PUR-F-006 RFQ-
from the appropriate authorities and updated workman group insurance
policy covering labour engaged.
7 The contractor shall have to submit the valid Electrical Contractor License
along with the offer.
8 Bidder should indicate GST IN No. (Copy of GST registration to be enclosed)
9 Contractor shall follow the GSECL GENERAL SAFETY RULES/NORMS
10 The tender shall be opened of only those bidders who have paid Tender fee
1. The Chief Engineer (Gen.), GSECL, GTPS reserve right to reject any tender or all tenders without
assigning any reason thereof and to split up the work between more than one party as the case may
2. Non-compliance of above criteria the technical bid is liable to be rejected. After acceptance of
the Technical Bid, the Price Bid will be considered for opening.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 348 PUR-F-006 RFQ-
Sr. Details Confirmation
No. (Tick √ any one)
1 Annexure – 2 YES / NO
2 Firm’s details as per “Annexure –3” YES / NO
3 Copy of the un-priced schedule (Description and YES / NO
price). “Annexure - 4”.
4 Work Completion Period as per “Annexure- 5” YES / NO
5 Past experience details as per “Annexure-6” YES / NO
6 Performance certificates as per “Annexure-7” YES / NO
7 ANNEXURE – 8 YES / NO
8 ANNEXURE – 9 YES / NO
9 ANNEXURE – 10 YES / NO
10 ANNEXURE – 11 YES / NO
11 ANNEXURE – 12 YES / NO
12 Certificate of Important Instruction & certificate-A YES / NO
13 INTEGRITY PACT YES / NO
14 Schedule-“A” & Annexure-“A” (GSECL’s work/ Scope YES / NO
of work to be carried out by contractor specified duly
signed and with seal of firm.)
I / WE, confirm that following documents are attached with the technical bid of the
Signature of the Tenderer
Seal of the Firm
NOTE: ALL THE DOCUMENTS SHOULD BE PROPERLY FILED AND SHOULD BE GIVEN
FLAG MARKING FOR IDENTIFICATION.
EW- 348 PUR-F-006 RFQ-
Subject:- Work of cleaning, maintenance and overhauling of various types of 6.6 KV HT
Panel, LT MCC and charger panel during COH/AOH/ Shutdown of Unit 3, 4, 5 at GTPS.
Reference: Tender No. EW-348
Due on date: / /
In connection with the above subject and reference I/ We confirm the following:
1. I / We, the under signed have read and examined the Scope of Work & requirements
during execution of work in tender mentioned under reference along with the Commercial
terms and conditions.
2. I / We, declare that our Technical Bid is strictly in line with the Tender
specifications/work.
3. Further, I / We also agree that additional conditions / deviations, if any, found in the
Commercial terms & conditions, our offer shall be out rightly rejected without assigning
any reason thereof.
4. We hereby agree for the terms & conditions laid down in Tender.
All the bidders are requested to see and verify the documents of
a) General safety rules / norms” to be observed by the contractors
b) Additional terms and conditions regarding industrial law and other related matters for
the tender documents.
c) General rules and directions for the guidance of contractor booklet of GSECL, GTPS on
our website under heading of “Rules for Works”
And confirm that all the above documents you have verified & certify as below
“I/we hereby has read the above documents and agree for the Safety Rules, Industrial
Laws and Contract Booklet (a, b & c as above) and accordingly submitted my/our offer.”
Signature of the Authorized
Representatives of the firm
Seal of the Firm
Name of the Tendering Firm / Agency:
EW- 348 PUR-F-006 RFQ-
DETAILS OF THE FIRM
Tenderer may MANDATORILY fill all the details in this form.
(These details are necessary to create the database of Contractors)
Contractor Name
Within Gujarat / Outside Gujarat /GST
Pvt. Firm / Public Ltd. / State Govt. Under (Indicate the relevant status)
taking / Central Govt. undertaking
Vendor Registration Letter No. & Date
(If registered and Letter issued by Board) -
(If Applicable)
Vendor Registration Fee (If Applicable) Paid / Not Paid (Tick any one, for New
Vendor Registration Date (If Applicable) -
Vendor Registration Validity Period From Date___________ to Date___________
(If Applicable)
P.F NO (Also Physical Document is
required along with the Technical Bid)
PAN NUMBER (Also Physical Document is
required along with the Technical Bid)
Custom No. and Date (If applicable)
Electrical License Type(If Applicable) (Also
Physical Document is required along with
the Technical Bid)
License Validity Period (If Applicable) From Date___________ to Date___________
Account Number of Bidder
Type of Account of Bidder
Branch Name & Address
Contact Number of the Branch
Copy of Cancelled Cheque
COMPANY EMAIL ID FOR
CONFIRMATION OF PAYMENT
Address of Registered Office Factory Works Authorized
Contact person name
City & Pin code
Phone Nos.(Office)
Phone Nos.(Residence)
Web site address
EW- 348 PUR-F-006 RFQ-
UN – PRICED SCHEDULE (COPY WITHOUT PRICES)
Description Quantity Unit
EW- 348 PUR-F-006 RFQ-
Work Completion Period
EW- 348 PUR-F-006 RFQ-
DETAILS OF THE EXPERIENCE FOR SIMILAR TYPE OF WORK AS PER TENDER’S PRE-
QUALIFICATION CRITERIA.
Party should submit below executed detailed work order physically along with the
Technical Bid. This is mandatory.
Sr. NAME ORDER DESCRIPTION ORDER ORDER STATUS, IF REMARKS
No OF REFERENCE OF WORK AMOUNT FULLY ORDER
WORK No. & DATE EXECUTED. UNDER
YES/NO EXECUTION
A GUJARAT STATE ELECTRICITY CORPORATION LTD /SISTER COMPANY.
B OTHER STATE ELECTRICITY BOARD
C OTHER ORGANISATION.
EW- 348 PUR-F-006 RFQ-
LIST OF PERFORMANCE CERTIFICATES SUBMITTED WITH THE TECHNICAL BID.
Party should submit below executed work performance certificate physically along with
the Technical Bid.
Sr. No. Name of the Authority by Reference No. & Details of Works
whom certificate is issued date
EW- 348 PUR-F-006 RFQ-
ANNEXURE – 8 ( for Works )
Bidder must fill up below details & should place at the top of the Technical Bid.
1 PRICES: [FIRM ONLY]
(Please Specify YES / NO.)
2 TAX: [IN PERCENTAGE] ( GST )
3 The Last three-year Audited Annual Accounts, Positive
Net worth certificate, and Average Annual Turnover
certificate certified by charted accountant as Per
Qualification Requirement
4 Please quote your GST Registration No. (Also Physical
Document is required along with the Technical Bid)
5 Please quote your PF Registration No. & Date. (Also
Physical Document is required along with the Technical
6 PENALTY TERMS AGREED :
(Please Specify YES / NO.)
7 SECURITY TERMS AGREED:
(Please Specify YES / NO.)
8 DETAILS OF EMD PAYMENT (as applicable as below)
a) DD No & Date & Name of Bank
b) B.G. No. & Date & name of Bank
c) Cash details
9 Completion of Works
(Please Specify YES / NO.)
10 VALIDITY OF THE OFFER AGREED:
(Please Specify YES / NO.)
11 PAYMENT TERMS AGREED:
(Please Specify YES / NO.)
12 WORK OFFERED AS PER SCHEDULE-B: (YES/NO)
13 TELEPHONE NOS. & FAX NO:
14 Authorized person of the firm :
15 Name of the proprietor, partners, directors [as the case
may be], along with address, telephone, fax no. etc.
16 If Vendor Registration is Done:(If Applicable)
(Please submit copy of Vendor Registration approval -
letter in the EMD cover).
EW- 348 PUR-F-006 RFQ-
TECHNICAL DEVIATIONS IF ANY TO BE FURNISHED IN THIS ANNEXURE ONLY AND TO
BE SUBMITTED WITH TECHNICAL BID.
EW- 348 PUR-F-006 RFQ-
(UNDERTAKING IN REGARD TO QUOTED PRICE)
(Bidder should not quote their prices in this page)
Sub: Undertaking in regard to quoted prices.
All bidders will have to furnish the following undertaking duly filled in, signed and stamped for
“This is to certify that we have not worked for the subjected tender viz.…………………. to other
SEBs / Power Utilities with this tender details of GSECL at lower % price than the % prices
quoted in this tender by us for the same item during last Six (6) Months.”
The prices quoted by us for the same item to other SEBs during the last six (6) months are
Signature of the Tenderer
Seal of the Firm
EW- 348 PUR-F-006 RFQ-
ANNEXURE-10A (For Supply)
Vendor must fill up below details & should place at the top of the Technical Bid.
1. PRICES:[FIRMONLY]
(Please Specify YES/NO.)
2. Rates offered FOR:__________________
3. GST :[INPERCENTAGE]
(Please Specify IN/EXCLUSIVE/EXEMPTED)
Please quote your GST Registration No. &Date
Please specify GST NO
4. In case of GST(SGST,CGST OR IGST)please specify place
of Manufacturer unit from where material is to be supplied
5. PENALT YTERMS AGREED:
(Please Specify YES/NO.)
6. SECURITYTERMSAGREED:
(Please Specify YES/NO.)
7. P.G TERMS AGREED (Wherever applicable):
(P.G.-Performance Guarantee)(Please Specify YES/NO.)
8. DETAILS OF EMD PAYMENT
(Please Specify DD/BG/Pay order/ Valid SSI/Valid NSIC
No./Valid UDYAM/Valid KVIC/Valid MSME
9. DELIVERY TERMS AGREED:
(Please Specify YES/NO.)
10. VALIDITY OF THE OFFER AGREED:180 Days from the
date of opening of Technical Bid
11. PAYMENT TERMS AGREED: 80% against T.R.C. within
30days & balance 20% within 45 days
12. ITEMS OFFERED:
13. TELEPHONE NOS. & FAX NO:
14. Authorized person of the firm:
15. Name of the proprietor ,partners, directors [As the case
may be], along with address, telephone, fax no. e-Mail ID
Signature of Tenderer Company’s roundseal
EW- 348 PUR-F-006 RFQ-
(UNDERTAKING IN REGARD TO STOP DEAL / BANNED FOR BUSINESS DEALING / BLACK
Sub: Undertaking in regard to Stop Deal / Banned for Business dealing / Black List Thereof.
Ref: Tender No.:
______________________________________ here by certify that M/S
__________________________________________ and their proprietor / any partner / any directors
of the firm is not stop deal and/or banned for business dealing and/or black listed by GUVNL
and/or their any subsidiary company viz. GSECL/GETCO/DGVCL/MGVCL/UGVCL/PGVCL.
(Confirmed / not confirmed)
Contractor’s Signature
With Seal & Date
EW- 348 PUR-F-006 RFQ-
Bidders must furnish the scan copy of below details along with technical Bid.
(1) A copy of order on hand.
(2) Detail order copies submitted as per Annexure-6.
(3) Performance Certificate if any.
(4) Documentary Proof for Partnership of proprietor, Partners, Directors (as the case may be),
along with Address, Telephone No, Fax No. etc. if any.
(5) The Last three-year Audited Annual Accounts, Positive Net worth certificate, and Average
Annual Turnover certificate certified by charted accountant as Per Qualification
(6) A copy of Goods and Service Tax Registration document along with valid Registration
Number as per Annexure –
(7) A copy of PF Registration document along with valid Registration Number as per Annexure
(8) A valid B.G. against EMD or DD for the payment of EMD as per Annexure-8.
IMPORTANT INSTRUCTIONS
1. The Tenderer should clearly give certificate along with the Technical Bid:
“This is to confirm and certify that the offer submitted by me is strictly in accordance with
the GSECL’s Work Tender specifications and as per Technical detail work/ drawing as
mentioned in the Tender Specifications. There is no commercial or Technical deviation in
the offer from the Corporation’s Tender Specification. I undertake to abide by the
GSECL’s tender description and Particulars. I undertake to complete work strictly as per the
GSECL’s Technical specification/ Scope of work/ Guaranteed Technical Particulars /
Drawing, even if any technical deviations are mentioned by me. I also undertake to abide by
all commercial conditions of the GSECL, including work completion schedule.”
(Signature of the Tenderer)
1. Any offer without above certificate will not be considered and the tender will be out
rightly ignored in the absence of above certificate.
2. After opening of the Tender, if it is found that the offer given by the Tenderer is not
according to the GSECL’s specifications, Guaranteed Technical Specifications/ Scope of
work, Drawing and commercial terms and conditions and false certificate is given by the
Tenderer, then GSECL will not deal with the firm for the present Tender. It is, therefore
requested that the Tenderer should take care in giving their offer and submission of
3. The conditional tenders will not be accepted.
EW- 348 PUR-F-006 RFQ-
[On Company's Letter Head]
(Required for price justification, if necessary)
(UNDERTAKING IN REGARD TO QUOTED PRICE)
(All bidders will have to furnish the following undertaking duly filled in, for all the quoted
items/works of the tender along with online Technical Bid)
Ref.: Tender No: / Gem Bid. No.:
We, the undersigned, hereby declare and undertake that we have not accepted or executed
any Letter of Acceptance (LOA) or Purchase Order (PO) at a unit ex-works price/any work at
rate lower than the rate offered in this tender in any station of GSECL/GUVNL &
Subsidiaries/CPSU/SPSU/IPP etc. during the period from six (6) months prior to two (2)
months after the bid submission date of this tender.
We also understand that LOA / Purchase Order placed by any station of
GSECL/GUVNL Subsidiaries/CPSU/SPSU/IPP etc. on the basis of above undertaking
shall not be considered as ‘offered’ price for the tender items in subsequent tender, if it
is not within period mentioned above
I/ We accept above undertaking.
Seal of the firm Signature of the tenderer
With designation
EW- 348 PUR-F-006 RFQ-
Gujarat State Electricity Corporation Ltd.
Thermal Power Station, GANDHINAGAR
(On Firm’s Letter Head)
Sub: - Work of cleaning, maintenance and overhauling of various types of 6.6 KV HT Panel,
LT MCC and charger panel during COH/AOH/ Shutdown of Unit 3, 4, 5 at GTPS.
ON FIRM’S LETTER HEAD:-
I/we __________________________________________________________the authorized signatory of
M/s. __________________________________ hereby certified that M/s.
______________________________________is not related with other firms who have submitted
tenders for the same work under this inquiry / tender and the interest (i.e. Shareholding in
company and share in partnership firm) of any employee of the tendering Company or my/our
relative as defined in section 2(77) of the Company’s act. 2013 is 10% or more, the tendering
Company will not deal with such company/firm at all.
Also I /We declare that, I/We have not conflict of interest with other bidders, as per
Conflict of interest among Bidders/Agents
A bidder shall not have conflict of interest with other bidders. Such conflict of interest
can lead to anti-competitive practices to the detriment of Procuring Entity’s interests.
The bidder found to have a conflict of interest shall be disqualified. A bidder may be
considered to have a conflict of interest with one more parties in this bidding process, if
a) they have proprietor/partner(s)/Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/financial stake from
any of them; or
c) they have the same legal representative/agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties,
that puts them in a position to have access to information about or influence on
the of bid of another bidder; or
e) Bidder participates in more than one bid in this bidding process. Participation by
a bidder in more than one Bid will result in the disqualification of all bids in
which the parties are involved. However, this does not limit the inclusion of the
components/sub-assembly/assemblies from one bidding manufacturer in more
f) in cases of agents quoting in offshore procurements, on behalf of their principal
manufacturers, one agent cannot represent two manufacturers or quote on their
behalf in a particular tender enquiry. One manufacturer can also authorize only
one agent/dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his
2. Indian/foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of
the design or technical specifications of the contract that is the subject of the
EW- 348 PUR-F-006 RFQ-
h) in case of a holding company having more than one independently
manufacturing units, or more than one unit having common business
ownership/management, only one unit should quote. Similar restrictions would
apply to closely related sister companies. Bidders must proactively declare such
sister/common business/management units in same/similar line of business.
i) Bidder shall not act in contravention/violation to the provisions of competition
act, as amended from time to time.
SIGNATURE OF THE TENDERER
WITH DESIGNATION.
SEAL OF THE FIRM:
EW- 348 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED, BARODA Date:
To, create an environment where Business Confidence is built through Best Business Practices
and in fostered in an atmosphere of trust and respect between providers of goods and services
and their users for the ultimate benefit of society and the nation.
GSECL’S COMMITMENT PARTY’S COMMITMENT
■ To maintain the highest ethical ■ Not to bring pressure
standards in business and recommendations from outside GSECL
professions. to influence its decision.
■ Ensure maximum transparency ■ Not to use intimidation, threat
to the satisfaction of inducement or pressure of any kind on
stakeholders. GSECL or any of it’s employees under
any circumstances.
■ To ensure to fulfill the terms of ■ To be prompt and reasonable in
agreement / contract and to fulfilling the contract, agreement, legal
consider objectively the viewpoint obligations.
■ To ensure regular and timely ■ To provide goods and/or services
release of payments on due dates timely as per agreed quality and
for work done. specifications at minimum cost to
■ To ensure that no improper ■ To abide by the general discipline to be
demand is made by employees or maintained in our dealings.
by anyone on our behalf.
■ To give maximum possible ■ To be true and honest in furnishing
assistance to all the Vendors / information.
Suppliers/ Service Provider and
other to enable them to complete
the contract in time.
■ To provide all information to ■ Not to divulge any information,
suppliers/contractors relating to business details available during the
contract/job which facilitate him course of business relationship to
to complete the contract/job others without the written consent of
successfully in time. GSECL.
■ To ensure minimum hurdles to ■ Not to enter into carter/syndicate/
vendors/suppliers/contractors in understanding whether formal/non-
completion of agreement/ formal so as to influence the price.
contract/ work order.
Seal & Signature Seal & Signature
(GSECL’s Authorized Signatory) (Party’s Authorized Person)
EW- 348 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED.
TPS: GANDHINAGAR.
Work of cleaning, maintenance and overhauling of various types of
Sub: 6.6 KV HT Panel, LT MCC and charger panel during COH/AOH/
Shutdown of Unit 3, 4, 5 at GTPS.
[A] Cleaning and maintenance of 6.6 KV US Bus and SS Bus during AOH (Item Sr. No. 1 &
1. Before commencing the work check the safety requirement as per instruction of EIC
2. Cleaning of HT Panel: Work involves opening of panels, cable compartment door, covers of
breakers as per list of schedule-B and cleaning by air.
3. Air cleaning with pressurized dry air or by blower, on panel top, side, Front and inside panel
gently, not to damaged the wiring, cable binding etc as permitted by EIC.
4. Cleaning of support insulators, CT & CBCT by dry cloth and finally cleaning Panels from outside
by washing powder or Petrol as per instruction of EIC. Sundry material, washing powder, cotton
cloth is brought by contractor no payment is made for these. However Petrol is provided by
5. Cleaning of Shutter assembly with Petrol and lubricant.
6. The holes/gaps in the Panels shall be shielded by the contractor with the required material
provided by GSECL
7. Activity to be completed for 1 job within 4 days with engagement of minimum manpower as
mentioned in penalty table for Minimum manpower to be engaged per job.
[B] Cleaning and maintenance of LT MCC/ Panel / ACDB during AOH (Item Sr. No. 3 to 5 & 8 to 10):
1. Before commencing the work check the safety requirement as per instruction of EIC
2. Cleaning of 415V MCC/panels: Work involves opening of panels, cable compartment door,
Module door , covers of breakers, ACDB transformer, ACDB panel. PLC panel and modules as
per list of schedule-B and cleaning by air.
3. Air cleaning with pressurized dry air or by blower, on panel top, side, Front and inside panel
gently, not to damaged the wiring, cable binding etc as permitted by EIC.
4. Cleaning of support insulators by dry cloth and finally cleaning Panels from outside by drenched
pota with washing powder as per instruction of EIC. Sundry material, Washing powder, cotton
cloth is brought by contractor no payment is made for these.
5. The holes/gaps in the Panels shall be shielded by the contractor with the required material
provided by GSECL
6. Activity to be completed for 1 job within 3 day with engagement of minimum manpower as
mentioned in penalty table for Minimum manpower to be engaged per job.
[C] Cleaning and maintenance of Power Transformer, 1-Phase/3- Phase ACDB during AOH
(Item Sr. No. 6 to 7):
1. Work shall started only after conforming the line clear and outage of transformer
2. Before commencement of work it is ensure that the HT and LT breaker must rack out, DC
fuse must removed.
3. Line clear tag with number must received from operation department.
EW- 348 PUR-F-006 RFQ-
4. Sundry material, washing powder, cotton cloth is brought by contractor no payment is made for
5. Visual outside inspection before staring the cleaning work and if anything is noticeable, must be
informed to EIC
6. Initially outside cleaning of transformer by dry cloth, remove dust, ash and clean the oil with dry
7. Gentle Open the cover of transformer HT/ LT cable box and check the connection tightness.
Clean the support insulator and if anything found noticeable same shall be informed to EIC
8. If transformer testing is required as per schedule then disconnects the HT/LT cable as per
requirement of testing.
9. After completion of testing / as per instruction of EIC re connect the HT/LT cable carefully as
10. Close cable box cover, with gasket, fitting of all nut bolts carefully.
11. If any nut-bolt missing then ask from EIC and fit it appropriately.
12. Similarly for marshaling box and for NGR box- open cover, inspect, check tightness of cable
termination, cleaning, replacement of damaged TB, wire lug if any and close cover tightly. TB
/lug provided by GSECL at free of cost.
13. Final - Oust side cleaning of transformer-, Outside Clean/ washing of transformer with
powder, water and clean with dry cloth & possible with dry air/ air blower.
14. After conformation of outside dryness inform the EIC for completion of cleaning work
15. Covering the JB with plastic. Plastic sheet provided free of cost by GSECL
16. Activity to be completed for 1 job within 2 day with engagement of manpower as
mentioned in penalty table for Minimum manpower to be engaged per job.
[D] Cleaning and maintenance of Battery Charger during AOH (Item Sr. No. 11 to 12):
1. Before commencing the work check the safety requirement as per instruction of EIC
2. Cleaning of Charger Panel: Work involves opening of panels, cable compartment door.
3. Air cleaning with pressurized dry air or by blower, on panel top, side, Front and inside panel
gently, not to damaged the wiring, cable binding etc as permitted by EIC.
4. Cleaning of charger card by dry cloth and finally cleaning Panels from outside by washing
or Petrol as per instruction of EIC. Sundry material, washing powder, cotton cloth is brought by
contractor no payment is made for these. However Petrol is provided by GSECL.
5. Connection tightness of panel wiring in presence of EIC.
5. The holes/gaps in the Panels shall be shielded by the contractor with the required material
provided by GSECL
6. Activity to be completed for 1 job within 3 day with engagement of manpower as
mentioned in penalty table for Minimum manpower to be engaged per job.
[E] General Scope of work for Item No.1 to 12 :-
1. After completion of cleaning of cable all the cable`s dressing & binding should be carried out
2. If any cable / cable terminal found damaged same should be repaired by the contractor.
3. If any misc. fabrication work for cleaning/ maintenance requires for proper work same should be
done by contractor.
4. All necessary tools & tackles for cleaning, maintenance like air-pipe, ladder for working at
water pipe for jetting & nozzle for pressurized water jetting, clamp for binding the cables should
be arranged by the contractor.
5. After completion of works site cleaning should be carried out by the contractor.
6. All safety related tools & tackles like safety belt to work at height, PPE`S should be arranged by
EW- 348 PUR-F-006 RFQ-
the contractor.
7. All the work should be carried out as per the instruction of EIC.
8. The cotton waste, Madarpat cloths, Washing Powder, Emery cloth Rolls, Wire Brushes, Air
Water Pipes, Water Jetting Nozzles, cleaning agent like petrol etc. required for the subject work
should be arranged by the Contractor only.
9. The work is to be carried out & completed as per the instruction of EIC i. e; Ex. Engineer (EMD-
and follow the instruction of JE/DE/ Supervisor in charge from time to time.
10. The Contractor shall comply with the Factory Act / Factory Laws and Safety Laws in force from
11. The Contractor has to arrange / deploy sufficient skilled persons / Man power to complete the
work within stipulated time of shutdown (AOH/COH). The work should be completed at least
TWO days advance before the Boiler Light up activity.
12. All the materials & consumable items have to be arranged by the Contractor at his own cost.
13. The party has to carry out the work as and when the Shutdown is available for AOH /COH and
the Party will be informed accordingly well in advance.
14. GSECL shall provide electricity & service air at one point at work site free of cost.
15. As the work is to be carried out in restricted areas Contractor’s persons shall strictly observe
all safety norms. The Contract shall take care to prevent any type of accident for safety of his
persons. Any fatal / Non-fatal, Electrical / Mechanical accident occurs; GSECL in no case
shall have any responsibility for Contractor’s persons for any legal complications thereafter.
16. For any ambiguity and conflict, the decision of the Officer on Special Duty, Gandhinagar TPS
shall be final & binding to the Contractor.
17. If the work is not found satisfactory or not progressing according to schedule given by
Corporation, GSECL reserves right to terminate the contract and Corporation may take such
action as may be deemed fit to see that the work is completed on time at your risk & cost.
18. The contractor shall have to do the work at his risk & cost of workmanship & manpower.
19. The contractor should take care of his own person for prevention of any type of accident &
follow the safety rules. The GSECL in no case shall have any responsibility for contractor
persons and for any legal complications thereafter.
20. Executing Agreement & indemnity bonds.
Contractor has to arrange & execute Agreement and indemnity bond of Rs.300 as per GSECL
rules before starting of work. Bond format will be provided by GSECL.
Terms & Conditions for Works:
1. Validity :- The overall validity of order will be 18 Months from the date of commencement.
2. Time limit : Time Limit for completion of each JOB as mentioned in scope of work.
3. Payment Terms :- Party has to accept payment terms as per GSECL rules only i.e. as per
actual work done. NO ADVANCE payment will be allowed. Net Payment will be
released within 30 days after completion of work and submitting their relevant invoices.
4. Penalty Terms :-
4. 1 Penalty for work delay :- Any delay that may take place in execution beyond contractual
cutoff date / stipulated period in the order shall be subjected to penalty (not liquidated damages) at
the rate of ½% of the contract price / order price per week or part thereof subject to a maximum of
10% of the total contract value / order value (i.e. End cost including taxes & duties).
EW- 348 PUR-F-006 RFQ-
4.2 Penalty table for Minimum manpower to be engaged per job
Minimum manpower Penalty per person per
Description of Work to be engaged per day
Cleaning and maintenance of 6.6 1.5 x ( Work order Job Rate )
01 JOB 1 skilled and 4 unskilled
KV US Bus of Unit-3/4/ 5
Cleaning and maintenance of 6.6 1.5 x ( Work order Job Rate )
02 JOB 1 skilled and 7 unskilled
KV Station Bus of Unit-3/4/ 5
Cleaning and maintenance of 1.5 x ( Work order Job Rate )
03 JOB 1 skilled and 4 unskilled
415 V SSS Bus of Unit-3/4/ 5
Cleaning and maintenance of 1.5 x ( Work order Job Rate )
415 V USS Bus of Unit-3/4/ 5 1 skilled and 4 unskilled
Cleaning and maintenance of
05 415 V Emergency Bus of Unit- JOB 1.5 x ( Work order Job Rate )
1 skilled and 4 unskilled
Cleaning, washing & power
06 connection tightness of UST & JOB 1.5 x ( Work order Job Rate )
1 skilled and 3 unskilled
SST Transformer of Unit-3/4/ 5
Cleaning & maintenance of 1-
07 Phase/ 3- Phase Transformer of JOB 1.5 x ( Work order Job Rate )
1 skilled and 2 unskilled
Cleaning & maintenance of 1-
08 Phase/ 3- Phase ACDB of Unit- JOB 1. x ( Work order Job Rate )
1 skilled and 2 unskilled
Cleaning & maintenance of 220V
09 DCDB of Unit-3/4/5 during JOB 1.5 x ( Work order Job Rate )
1 skilled and 2 unskilled
AOH/COH/ Shutdown period
Cleaning & maintenance of 26V
10 DCDB of Unit-3/4/5 during JOB 1.5 x ( Work order Job Rate )
1 skilled and 2 unskilled
AOH/COH/ Shutdown period
Cleaning & maintenance of
Battery Charger of Unit-3/4/5 1.5 x ( Work order Job Rate )
during AOH/COH/ Shutdown 1 skilled and 2 unskilled
Cleaning & maintenance of UPS
Charger and UPS ACDB of Unit- JOB 1.5 x ( Work order Job Rate )
12 1 skilled and 3 unskilled
3/4/5 during AOH/COH/
Shutdown period
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 348 PUR-F-006 RFQ-
ON STAMP PAPER OF Rs.300/-]
EMD BANK GUARANTEE FORMAT
FOR TENDER NO.__________
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
WHEREAS M/s. __________________________________________(Name and Address of the
Firm/company) having their registered Office at ________________________________(Address of
the Firm’s registered Office) (hereinafter called the “Tenderer”) wish to participate in the
Tender No._______________ for _________work (Supply / Erection / Supply & Erection Work, etc.)
of ______________________ (Name of the Material/equipment / work) for Gujarat State Electricity
Corporation Limited (hereinafter called the “Beneficiary”) and WHEREAS a Bank Guarantee
for Rs._____________ (Amount of Bank Guarantee towards EMD) valid till ____________ (mention
here date of validity of this Guarantee which will be Six months from the date of submission of
bid of the tender) which is required to be submitted by the Tenderer along with the Tender.
We,_____________________________________________(Name of the Bank & address of the Branch
giving the Bank Guarantee) having our registered Office at _____________________ (Address
of Bank’s registered Office) hereby give this Bank Guarantee No. _________________ dated
____________ and hereby agree unequivocally and unconditionally to pay immediately on
demand in writing from Beneficiary Gujarat State Electricity Corporation Limited or any
Officer authorized by it in this behalf any amount up to and not exceeding
Rs.____________(Amount of E.M.D.), (Rupees in words______________
________________________________________) to the said Gujarat State Electricity Corporation
Limited on behalf of the Tenderer.
We, ____________________________________________ (Name of the Bank) also agree that withdrawal
of the Tender/Bid/EOI or part thereof by the Tenderer within its validity or Non submission of
Performance Guarantee towards execution/supply period by the Tenderer within 15 days from
the date of issue of Letter of Acceptance by the Gujarat State Electricity Corporation Limited
would constitute a default on the part of the Tenderer and that this Bank Guarantee is
liable to be invoked & encashed within its validity by the Beneficiary in case of any occurrence of
a default on the part of the Tenderer and that the encashed amount is liable to be forfeited by
the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of
_______________ (mention here the date of validity of Bank Guarantee) and shall not be terminable
by notice or by Guarantor for change in the constitution of the Bank or the Firm of Tenderer
or by any reason whatsoever and our liability hereunder shall not be impaired or discharged
by any extension of time or variations or alterations made, given, conceded with or without
our knowledge or consent by or between the Tenderer and the Gujarat State Electricity
Corporation Limited.
Notwithstanding anything contrary contained in any law for the time being in force or banking
practice, this Guarantee shall not be assignable, transferable by the Beneficiary (i.e. GSECL)
Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not
be entertained by the Bank. Any invocation of the Guarantee can be made only by the
beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore our liability under this Guarantee is
restricted to Rs.__________(Amount of EMD) (Rupees __________________________________) (in
words). Our Guarantee shall remain in force till _____________ (Date of validity of the Guarantee).
Unless demands or claims under this Bank Guarantee are made to us in writing on or before
___________ (Date of validity of the Bank Guarantee), all rights of Beneficiary under this Bank
Guarantee shall be forfeited and we shall be released and discharged from all liabilities
EW- 348 PUR-F-006 RFQ-
Please Mention here Complete Postal Signature of the Bank’s
Address of the Bank with Branch Code, Authorised Signatory with
Telephone and Fax Nos Official Round seal
NAME OF DESIGNATED BANKS : As per Annexure – I
EW- 348 PUR-F-006 RFQ-
(ON STAMP PAPER OF Rs.300/-)
FORM OF BANKER’S UNDERTAKING
(For Performance Guarantees (PBG) towards execution/supply period ( Security Deposit )
as per Commercial Terms & Conditions of Tender)
We, __________________________________________________(name of the Bank and Address of the
Branch giving the Bank Guarantee) having our registered Office at
registered office) hereby give this Bank Guarantee No. _______________________________________
dated _________________ and hereby agree unequivocally and unconditionally to pay
immediately on demand in writing from the Gujarat State Electricity Corporation
Limited, or any Officer authorized by it in this behalf any amount up to and not
exceeding Rs. _____________ (Amount of Performance Guarantee towards execution/supply
to the said Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract for
the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and inclusive
of___________________(Date of validity of the Bank Guarantee) and shall not be terminable
by notice or by change in the constitution of the Bank or the firm of Contractors /
Suppliers or by any other reason whatsoever and our liability hereunder shall not be
impaired or discharged by any extension of time or variations or alterations made,
given conceded or agreed, with or without our knowledge or consent, by or between parties to
the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e.
GSECL). Notice or invocation by any person such as assignee, transferee or agent of beneficiary
shall not be entertained by the Bank. Any invocation of the Guarantee can be made only by the
beneficiary directly.”
“NOT WITHSTANDING” anything contained herein before, our liability under this guarantee is
guarantee shall remain in force until _______________ (date of validity of the Bank
Guarantee).Unless demands or claims under this Bank Guarantee are made to us in writing on
or before _____________ (Date of validity of the Bank Guarantee), all rights of Beneficiary
under this Bank Guarantee shall be forfeited and we shall be released and discharged from
all liabilities there under:
Please mention here complete Signature of the Bank’s authorized
Postal Address of the Bank with signatory with Official Round Seal.
Branch Code, Telephone and Fax
NAME OF DESIGNATED BANKS : As per Annexure - I
EW- 348 PUR-F-006 RFQ-
(ON STAMP PAPER OF Rs.300/-)
FORM OF BANKER’S UNDERTAKING
(For Performance Guarantees (PBG) towards Guarantee/Warranty period as per
Commercial Terms & Conditions of Tender)
We, __________________________________________________(name of the Bank and Address of the
Branch giving the Bank Guarantee) having our registered Office at
registered office) hereby give this Bank Guarantee No. _______________________________________
dated _________________ and hereby agree unequivocally and unconditionally to pay
immediately on demand in writing from the Gujarat State Electricity Corporation
Limited, or any Officer authorized by it in this behalf any amount up to and not
exceeding Rs. _____________ (Amount of Performance Guarantee towards Guarantee/Warranty
the said Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract for
the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and inclusive
of___________________(Date of validity of the Bank Guarantee) and shall not be terminable
by notice or by change in the constitution of the Bank or the firm of Contractors /
Suppliers or by any other reason whatsoever and our liability hereunder shall not be
impaired or discharged by any extension of time or variations or alterations made,
given conceded or agreed, with or without our knowledge or consent, by or between parties to
the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e.
GSECL). Notice or invocation by any person such as assignee, transferee or agent of beneficiary
shall not be entertained by the Bank. Any invocation of the Guarantee can be made only by the
beneficiary directly.”
“NOT WITHSTANDING” anything contained herein before, our liability under this guarantee is
guarantee shall remain in force until _______________ (date of validity of the Bank
Guarantee).Unless demands or claims under this Bank Guarantee are made to us in writing on
or before _____________ (Date of validity of the Bank Guarantee), all rights of Beneficiary
under this Bank Guarantee shall be forfeited and we shall be released and discharged from
all liabilities there under:
Please mention here complete Signature of the Bank’s authorized
Postal Address of the Bank with signatory with Official Round Seal.
Branch Code, Telephone and Fax
NAME OF DESIGNATED BANKS : As per Annexure – I.
EW- 348 PUR-F-006 RFQ-
(ON STAMP PAPER OF Rs.300/-)
FORM OF BANKER’S UNDERTAKING
(Combined Performance Guarantees (PBG) towards Execution/Supply period and
Guarantee/Warranty period as per Commercial Terms & Conditions of Tender)
We, __________________________________________________(name of the Bank and Address of the
Branch giving the Bank Guarantee) having our registered Office at
registered office) hereby give this Bank Guarantee No. _______________________________________
dated _________________ and hereby agree unequivocally and unconditionally to pay
immediately on demand in writing from the Gujarat State Electricity Corporation
Limited, or any Officer authorized by it in this behalf any amount up to and not
exceeding Rs. _____________ (Amount of Combined Performance Guarantees (PBG) towards
Execution/Supply period and Guarantee/Warranty period) Rupees
Gujarat State Electricity Corporation Limited on behalf of
M/s.___________________________________________________ who have entered into a contract for
the supply / works specified below :
This agreement shall be valid and binding on this Bank up to and inclusive
of___________________(Date of validity of the Bank Guarantee) and shall not be terminable
by notice or by change in the constitution of the Bank or the firm of Contractors /
Suppliers or by any other reason whatsoever and our liability hereunder shall not be
impaired or discharged by any extension of time or variations or alterations made,
given conceded or agreed, with or without our knowledge or consent, by or between parties to
the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or
banking practice, this Guarantee shall not be assignable, transferable by the beneficiary (i.e.
GSECL). Notice or invocation by any person such as assignee, transferee or agent of beneficiary
shall not be entertained by the Bank. Any invocation of the Guarantee can be made only by the
beneficiary directly.”
“NOT WITHSTANDING” anything contained herein before, our liability under this guarantee is
guarantee shall remain in force until _______________ (date of validity of the Bank
Guarantee).Unless demands or claims under this Bank Guarantee are made to us in writing on
or before _____________ (Date of validity of the Bank Guarantee), all rights of Beneficiary
under this Bank Guarantee shall be forfeited and we shall be released and discharged from
all liabilities there under:
Please mention here complete Signature of the Bank’s authorized
Postal Address of the Bank with signatory with Official Round Seal.
Branch Code, Telephone and Fax
NAME OF DESIGNATED BANKS : As per Annexure - I.
EW- 348 PUR-F-006 RFQ-
Financial Department, GR.No. FD/MSM/e-file/04/2025/2712/DMO Dtd. 01/04/2026
[ To be revised as per GoG notification issued from time to time.]
List of Banks Notified by GSECL
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent basis.
All Nationalized Banks.
(B) Guarantees issued by following Banks will be accepted as SD/EMD for period up to
March 31, 2027. The validity cut-off date in the GR is with respect to date of issue of
Bank Guarantee irrespective of date of termination of Bank Guarantee.
Name of Banks Name of Banks
1 AXIS Bank 23 A U Small Finance Bank
2 Bandhan Bank 24 City Union Bank
3 CSB Bank 25 DBS Bank India Limited
4 DCB Bank 26 Dhanlaxmi Bank
5 Equitas Small Finance Bank 27 Federal Bank
6 HDFC Bank 28 HSBC Bank
7 ICICI Bank 29 IDBI Bank
8 IDFC First Bank 30 Induslnd Bank
9 Jammu and Kashmir Bank 31 Jana Small Finance Bank
10 Karnataka Bank 32 Karur Vysya Bank
11 Kotak Mahindra Bank 33 RBL Bank
12 South Indian Bank 34 Standard Charter Bank
13 Tamilnadu Mercantile Bank 35 Ujjivan Small Finance Bank
14 36 Ahmedabad Mercantile Co-Operative
15 Nutan Nagrik Sahakari Bank 37 Rajkot Nagrik Sahakari Bank
16 Sarswat Co-Operative Bank
SBPP Co-operative Bank Ltd.
17 SVC Co-Operative Bank Ltd. 39 The Cosmos Co-op Bank Ltd.
18 The Gujarat State Co- 40 The Surat District Co-operative
Operative Bank Bank
19 The Surat Peoples Co- 41 The Baroda Central Co-operative
operative Bank Ltd. Bank
20 The Panchmahal District Co- 42 The Kalupur Commercial Co-
operative Bank operative Bank
21 The Rajkot Commercial Co- 43 The Banaskantha Mercantile Co-
operative Bank Limited Operative Bank Ltd.
22 Gujarat Gramin Bank
EW- 348 PUR-F-006 RFQ-
GENERAL SAFETY RULES / NORMS” TO BE OBSERVED BY THE CONTRACTOR
All the contractors working in Gujarat State Electricity Corporation Limited Factory like
Coal/Lignite/Gas/Hydro/Pumping Station shall have to strictly observe the following Safety
Rules. Concern principle contractors are responsible for informing & observance of these rules
by their supervisors/contract workers as well as the owner/supervisors/ workers of sub-
Contractors engaged, if any, by them for the work contract awarded to them. Prior to
commencement of the work, Contractor shall have to submit a written assurance on their
letterhead to the concerned Sectional Head / Engineer-in-charge that they have thoroughly gone
through these Rules, have educated their employees / workers of their sub contractor and will
strictly observe the said Rules while execution of work under work contract awarded to them.
They will have to indemnify the company for any loss or damage / accident / injury to the
company’s property / employee or employee of their own in default of non - observing these
(01) Contractor should issue photo gate pass for their workers from GSECL Factory Manager as
per Gujarat Factories rules, 1963 & details shall be filled up in GSECL gate pass format as
per Aadhar card /Election card id proof & to follow the gate pass issue procedure through
concern department EE & SE, Security Officer, LWO/IRO/DGM, Factory Medical Officer,
Safety Officer/Dy. Safety Officer & Factory Manager.
(02) In case of emergency, temporary photo gate pass shall be issued by Security Officer only for
three days with prior permission of Factory Manager only. More than three days,
Permanent photo gate pass procedure shall be completed by contract agency for their
contract workers.
(03) Certificate of Fitness of employment in hazardous process & operations in form no.33 of
Gujarat Factories rules, 1963 shall be issued by GSECL Factory Medical Officer for all
contractor workers before commencement of work & examination responsibility shall be
taken by contractor as well as concerned Head of Department .Pre-employment &
Periodical medical examination of contractor workers shall be carried out in form no.32
from GSECL Factory Medical Officer after every six (06) months of contractor with their
contractor workers. Contractor shall be fulfilled all health requirements before
commencement of work. After completion of medical examination in form no.32/33,
GSECL Factory Medical Officer shall be signed in contract worker gate pass procedure
(04) If work executed outside factory premises, Principle Contractor shall be registered
compulsory under The Building & Other Construction Workers (Regulation of Employment
and condition of service) Act, 1996 and The Gujarat Building & Other Construction
Workers (Regulation of Employment and condition of service) Rules, 2003 before execution
the ”building or other construction work” means the construction, alteration, repairs,
maintenance or demolition, of or, in relation to, buildings, streets, roads, railways,
tramways, airfields, irrigation, drainage, embankment and navigation works, flood control
works (including storm water drainage works), generation, transmission and distribution of
power, water works (including channels for distribution of water), oil and gas installations,
electric lines, wireless, radio, television, telephone, telegraph and overseas
communications, dams, canals, reservoirs, watercourses, tunnels, bridges, viaducts,
aqueducts, pipelines, towers, cooling towers, transmission towers and such other work as
may be specified in this behalf by the appropriate Government, by notification but does not
include any building or other construction work to which the provisions of the Factories
Act, 1948 (63 of 1948), or the Mines Act, 1952 (35 of 1952), apply.
(05) Contract worker gate pass will issue after completion of safety induction 3D animation
movie & Training record is to be maintained in IMS/OHSAS training format by TK
(06) As per Gate pass format of GSECL, Safety Officer/Dy. Safety Officer shall be checked the
issue PPE to contract workers as per nature of job, Form no.10 of lifting tools and tackles,
Driving license, Electrical contractor license, Electrical trade qualifications, Safety
induction training, SOP, supervisor qualifications etc. After fulfillment of all Safety
compliances, Safety Officer/Dy. Safety Officer shall be signed in Contract worker Gate pass
procedure format.
EW- 348 PUR-F-006 RFQ-
(07) Work Contract shall be completed by principle contractor/agency/person who is awarded
the work order. Subletting of contract shall be allowed only if prior approval of Power
station chief before execution of work. Contractor/agency shall be submitted the entire
subletting contract documents with gate pass application through concern department EE
& SE, LWO/DGM, Safety Officer/Dy.Safety Officer & Factory Manager.
(08) Under The Conditions Framed Under Rule-45 Of The Indian Electricity Rules, 1956, Valid
Electrical contractor License shall be submitted to concern electrical department
EE/SE/Electrical Safety Officer/ Safety Officer/Factory Manager at the time of apply gate
pass by agency/party with latest renewal from Chief Electrical Inspector, Gandhinagar-
Gujarat. Electrical License photocopy shall be checked by Concerned HOD of Electrical
Department/Electrical Safety Officer/Dy.Safety Officer/ Safety Officer/Factory Manager.
(09) As per nature of job/work, Qualified supervisor (Diploma (Electrical/
Mechanical/Civil/C&I) + 3 years experiences or ITI + 10 years) shall be engaged by contract
agency & qualification certificate with experience certificate shall be submitted to concern
EE/SE/LWO/IRO/DGM/ Dy. Safety Officer /Safety Officer/Factory Manager at the time of
apply gate pass.
(10) As per rule 3 of CEA regulation ,2010: Designating person(s) to operate and carry out
the work on electrical lines and Apparatus, Contract person/worker possesses a
certificate of competency or electrical work permit, issued by the Appropriate Government.
That means, Electrical trade Qualification of contract worker/person like ITI-wireman/
Electrician, Diploma (Elect), BE/B. TECH (Elect), ME/ M. TECH (Elect) shall be submitted
to concern EE/SE/LWO/IRO/DGM, Dy.Safety Officer/ Safety Officer/Factory Manager at
the time of apply for photo gate pass procedure.
(11) As per nature of job/work & during capital overhauling work /Annual overhauling work
/24X7 round the clock work/major shut down work, Qualified Safety
Officer/Manager/Supervisor (BE/Diploma (Elect/Mech/Civil) + PDIS-Post Diploma in
Industrial Safety) shall be engaged by contractor during dangerous operations/dangerous
works as well as day to day dangerous activities, safety supervision, tool box talk, Safety
awareness programme, SOP preparation with hazards & its control measures with each
step , checking of lifting tools & tackles, hydra mobile crane, Safety precautions,
coordination with Safety Department etc.
(12) License of driver shall be submitted with gate pass issue application as per nature of
vehicles & to follow the Motor vehicle Act,1988,the Central Motor Vehicles (Amendment)
Rules,2016 as well as Gujarat Motor Vehicles rules,1989 & driver license shall be checked
every day by security shift in charge before entry in the Factory premises.
(13) SOP with JSA (Job Safety Analysis) shall be prepared by contractor through competent
person as per GFR, 1963 or Qualified Safety Officer as per GFR, 1963 with 05 years
experiences. SOP will review & approve by concern JE/DE/EE/SE/Elect. Safety
Officer/Dy. Safety Officer /Safety Officer/Factory Manager before execution of work.
(14) It is compulsory to use standard make Personal Protective Equipments (P.P.Es.) as per the
job requirement. Do not work without use of required P.P.Es. Contractor is responsible to
provide standard make (ISI/DGMS/CE/EN/ANSI approved) & to checked standard/make
in PPE issue format by concern JE/DE/EE/SE/Safety Officer/Factory Manager. Personal
Protective Equipments / Safety Gadgets suitable to give sufficient protection against
hazards involved in their work / job to their staff, as per the job requirement and insist /
enforce their workers to put on the same while at works.
The ongoing work is liable to be stopped at any time if your contract workers/staffs found
working without P.P.Es. Following is the list of various P.P.Es (as per ISI/DGMS/CE/ EN/
ANSI approved only) to be used for various works / worksites.
In any work, Contractor shall be issued the minimum 06 nos. of PPEs like Safety Shoes,
Safety Helmet, Safety goggles, Mask & Reusable Ear plug, hand gloves to their
workers/supervisor compulsory & it will check by concern section HOD & Dy. Safety
Officer /Safety Officer at the time of gate pass procedure.
Quality of PPE shall be approved from Safety Officer as per Indian Standard and
International Standard before executions of work or at the time of gate pass apply
List of safety equipments
EW- 348 PUR-F-006 RFQ-
Industrial Safety Helmet For protection of head against falling objects or
during fall of person from height. Yellow Colour
helmet is used for contract worker with agency
Safety Goggles/welding For protection of eyes against flying particles / dust,
goggles/ chemical splash chemical splash, welding spark, arc, flashover etc.
Full Face shield For protection of face against flying particles / dust,
chemical splash, spark, arc, flashover etc.
Reusable Earplug / Ear For ear / hearing system protection while working in
muffs. high noise level area.
Chemical suit/Gas tight suit For body protection against chemicals, oils, sharp
/Fire proximity suit/FR edged objects, heat, hot objects etc.
Safety Hand Gloves For protection of hands against chemicals, oils,
sharp edged objects, heat, hot metals/objects,
electricity etc.
Safety shoes/ Gum Boots For protection of leg/feet against falling objects,
with sharp edged objects, heat, hot metals/objects,
Oil/Chemical/water/heat/ electricity etc..
Electrical resistance etc.
Safety Belt(full body For fall prevention while working at heights or in
hardness with double depth, working in vessel or in confined space.
lanyard & shock absorber) /
Rope / Life line / Fall
Dust Mask/Respirator with Protection of respiratory system against dust.
Chemical Cartridge Protection against toxic chemical fumes /
Respirator with full face gases/vapors/dust etc.
mask type A2B2E2K2
Trolley mounted Air line Working in oxygen deficient zone or confine space
respirators with full face area
Portable Single gas detector Working in hazardous storage/process area
like Chlorine, Ammonia,
Portable Multi gas Detector Working in oxygen deficient zone & use in entry of
( LEL,O2,CO,H2S,SO2, etc) confine space & Major fire
Automatic voltage detector To check the present voltage or induction voltage of
electrical equipments/ bus/switch gears from
(one) feet distance before starting the any electrical
EW- 348 PUR-F-006 RFQ-
Auto darkening welding The new auto darkening welding helmet combines
helmet (EN 379 & EN 175 legendary Speed glass quality and auto darkening
Level-B) with PAPR as per technology with an innovative wide-view grinding
EN 12941:1998, class TH2 visor to give welders an all-in-one solution for more
and AS/NZS 1716 flexibility, precision, and efficiency.
Respiratory System is a combined face and breathing
protection device, for increased comfort and safety in
welding. The unit is equipped with a particle filter
which removes particles from the air. The unit
provides a constant airflow independent of filter
combinations and clogging. The unit can also be
equipped with a gas filter (for example A1B1E1). The
unit supplies air to the head top via the connecting
breathing tube. The airflow creates a slight positive
pressure which together with the sealing to the face
prevents particles and other contaminants from
entering the head top.
(15) All PPEs (as per ISI/DGMS/CE/EN/ANSI approved only) Should issued by
party/agency/contractor to their contractor workers as per nature of job and allotment of
PPE list shall be submitted to Safety Officer, Dhuvaran on his letter head as per below
mentioned format by Contractor before commencement of work through concerned
Sub: Issue of PEE to Contractor workers
Sub of work Order:
Name of Agency:
Date of Commencement:
Time limit for work order:
Sr. Name Desi Name of Name of PPE IS Make Qt Unit Date Rec
no. of gnati Section :Code of PPE y of eivi
worke on under no. of issue ng
rs work PPE sign
Reusable Ear Pair
Safety Shoes Pair
(16) Shift Security Inspector/Security Officer shall be checked Safety Shoes & Safety Helmet of
all contractor workers at entry gate of Factory Premises & shall entered contractor workers
with Safety Shoes & Safety Helmet with photo ID Gate Pass.
(17) Shift Security Inspector/Security Officer shall be checked validity of Gate pass of all
contractor workers on daily basis.
(18) During the work execution, one trained & competent supervisor of agency should always
remain present at work site. Concern JE/DE of GSECL shall be supervised the contract
work as per SOP .
(19) Approved NABL laboratory calibration certificates of electrical/mechanical/Civil/
C&I/Environment survey/Chemical etc measuring /testing equipments/instruments
which are used during contract work shall be submitted before starting the work & shall be
checked by concern JE/DE/EE before starting work & it’s record shall be maintained in
concern section.
(20) The contractor shall take all the required safety measures prior to commencement of work
on dangerous substances, machineries or area at which cautionary notice is displayed and
obtain “Line Clear” or “Work Permit” through the concern Department / Section JE/DE
EW- 348 PUR-F-006 RFQ-
and shall be informed to concern section JE/DE for closed/ returned after completion of
(21) Safety talk/Safety work instructions shall be given to contractor workers by concern
JE/DE regarding hazards of specific work, risk & it’s control measure (mentioned in HIRA)
before starting the job work and records shall be maintained for each & every job works.
(22) Display Safety instructions shall be strictly followed by all workers who are working in
factory premises.
(23) Material Safety Data Sheet (MSDS) of each chemical shall be available with Chief
Chemist/Control room & work related Chemical information shall be taken by contractor &
contractor workers from Concern EE/Chief Chemist before starting of chemical handling
(24) The contractor shall be checked & securely covered or securely fenced any opened fixed
vessel, sump, tank, pit or opening in ground or in floor which, by reason of its depth,
situation, construction or contents ,is or may be a source of danger before starting the
work each & every days or after interval/recess. Contractor supervisor shall be informed to
concerned HOD regarding any unsafe conditions.
(25) Prohibition of smoking, fires, lights, spontaneous ignition substance, matches; fuses,
mobile phone etc are to be strictly followed by all workers who are working in factory
(26) Prior to carrying out welding, gas cutting, furnace heating or any other hot work job,
remove all the inflammable material lying at or nearby worksite or cover it properly by
suitable protective covering. Also, special care shall be taken before carrying out such job &
see that all possible contributing factors to set fire shall be removed / vanished prior to
commencement of the work. Advance intimation shall be given to concerned section / fire
section to commence the work in fire prone areas. They should also keep ready all the
First Aid Fire Extinguishers / equipments & fire extinguishing media / material like sand /
water buckets or other appropriate equipment at such place.
(27) While carrying out work in confined space or inside vessel, obtain necessary “Confined
Space / Vessel Entry Permit” from concerned department prior to commencement of the
For lighting in such areas, only 24-volt (ISI certified & with proper guard) hand lamp shall
be used. For taking care of the persons working inside the confined space / vessel, a
supervisor / person capable to keep continuous watch on person(s) working inside, assist
them in case of emergency or arrange to get immediate outside help, shall remain present
at entry point. Use full body safety belt without failed.
While working inside sewage, trench or in-depth, a person to warn outsiders / entrants /
passers etc shall remain available near entry point or the entry point shall be cordoned by
a barricaded tape with a cautionary notice. After completion of the works, all the lids /
covers / grills / grits opened, shall be re-fixed / re-placed in the original position as it were
prior to commencement of the work and leave the work place in safe condition in all
respect, so as to prevent accident to fellow workers.
(28) The contractor shall see that he / his persons do not work on or block (by stacking
material, spare parts, tools-tackles, equipments etc), any passages / walkways / gangways
/ aisles / staircases / ladders / lifts or any other approaches / roads leading to plans or its
auxiliaries, on which there is traffic movements or possible traffic movements in case of
emergency. Such passages are meant for safe escape in the event of emergency. If it is
utmost necessary to carry out work in such area with blocking of passage, prior permission
of Competent Authority or the Engineer-In-Charge shall be obtained. To demarcate /
declare the area as “UNSAFE”, cordon it using barricading tape & display suitable caution
notice or keep a person to restrict / divert the traffic on this route through other safe
(29) The contractor shall see that he / his persons do not work on or block (by stacking
material, spare parts, tools-tackles, equipments etc), any passages / walkways / gangways
/ aisles / staircases / ladders / lifts or any other approaches / roads leading to plans or its
auxiliaries, on which there is traffic movements or possible traffic movements in case of
emergency. Such passages are meant for safe escape in the event of emergency. If it is
utmost necessary to carry out work in such area with blocking of passage, prior permission
of Competent Authority or the Engineer-In-Charge shall be obtained. To demarcate /
declare the area as “UNSAFE”, cordon it using barricading tape & display suitable caution
EW- 348 PUR-F-006 RFQ-
notice or keep a person to restrict / divert the traffic on this route through other safe
(30) Prior to use power / electrically operated hand tools / equipments / machines / gadgets
like welding machine, hand grinder, hand drill etc, ensure for its safe operation & use it
only if it is found safe to use. Do not use defective, unsafe or improperly maintained
The electrical power supply required to run such equipments shall not be taken directly at
their own but shall be obtained through concerned Electrical Maintenance Departments or
their authorized persons or under their observations / guidance only. The Electrical
Section shall provide temporary electrical connection up to contractor’s Mains Board on
which it is compulsory to install mains switch, ELCB & fuses of adequate capacity. All
such equipments shall invariably be earthed adequately to prevent electrical shock,
sparking, short circuit etc. Power cord to be used shall be of adequate capacity, without
any joint & shall consist of earth wire also. Hence, it is necessary to use adequate capacity
3-wire power cord for single & 5-wire power cord for three phase power connections. The
plugs, receptacles, pins, holders etc shall be of adequate capacity & safe to use.
All electrical & mechanical equipments / tools-tackles viz. welding machine, cutting
machine, Grinder, Drill, Chain Pulley Blocks, Hook chooks etc required to be used during
work execution shall be of standard make & bear ISI certification mark on it.
The consumables like welding electrodes, grinding wheels / discs etc which has specific
prescribed life span shall not be used in any case if its expiry date is over.
(31) Non-Sparking Non-Magnetic electrical hand tools and tool kits shall be used by Electrical
contractor for safe use in areas where hazardous, flammable, or combustible vapors,
liquids, dusts, or residues may be present in Gas Based power plant and list of tools and
tackles shall be submitted with technical bid. Non-Sparking Non-Magnetic electrical hand
tools and tool kits shall be checked by JE/DE before commencement of Electrical work.
(32) Before using lifting machines / tackles (like C.P.Bs., Hook chooks, winch, forklift, mobile
crane, EOT crane etc) & its attachments (like D-shackles, slings, U-clamps, Eye bolts or
any fixtures), it shall be checked and used only if found safe to use. Also, ensure that these
are tested, examined & certified in form no.10 by Competent Person as per the Factory act-
1948 & Gujarat Factories Rules and its validity do not expire. Further, it shall be fixed
properly and firmly prior to lifting the weight. Valid Test certificate of all Lifting
machines used by Contractor to be submitted to Dy.Safety Officer/ Safety Officer
before commencement of work through concerned EE/SE.
(33) Metal Scaffoldings to be used for working at height shall be of adequate size & capacity.
Obtain the work permit when working at height. While climbing on such scaffolding or
working on any structure at height, use of full body safety belt /full body hardness with
double lanyard & Fall arrestor & Helmet is compulsory. It is also necessary to fasten
chinstraps of the helmet.
(34) Contractor or their employee shall not interfere in day-to-day routine plant activities /
works except the work assigned to them, shall not loiter in the areas other than their work
jurisdiction, as well as shall not temper / operate / touch the
machineries/equipments/auxiliaries with which they are not concerned. Also, the
contractor shall strictly instruct their staff for not to sit or take rest at/near/below running
plants, auxiliaries, systems or any place which is risky, hazardous & prone to accident.
(35) The cylinders containing poisonous / toxic or inflammable / explosive gas like Oxygen,
Acetylene, LPG, Hydrogen, Ammonia, Chlorine, CO2 etc shall be handled safely taking due
care. To handle / shift such cylinders a special trolley /cage meant for it must be used but
in no case it should be rolled.
(36) In Gas Based Power station/Hydrogen storage area /Hydro carbon fumes-vapour generated
area, Spark arrestor (as per approved manufacturer of CCOE, Nagpur) shall be provided on
each vehicle by party/agency and it will check by shift security in charge before entry of
vehicles in the factory premises.
(37) No women or young person shall be employed or permitted to work in Lead-compound area
like battery room etc. as per schedule VI of GFR
(38) No women or young person shall be allowed to clean, lubricate or adjust any part of a
prime mover or of any transmission machinery while the prime mover or transmission
machinery is in motion. Examination or operation of motion machinery shall be made or
EW- 348 PUR-F-006 RFQ-
carried out only by a specially trained adult male worker wearing tight fitting clothing as
per section 22 of factories act
(39) In all risky job, before start the work, contractor should obtain General Safety Work Permit
through concerned section from Shift –in-charge well in advance.
(40) In case of noticing smoke or fire during their work execution, they shall make immediate
efforts to extinguish / control it and simultaneously inform the Fire Station Mobile No as
well as Station Fire Officer or Emergency Control room no which is displayed at prominent
place of factory like Main Security Gate, All unit control room, Canteen area, Safe Assembly
points, Fire Station, All security gates, Occupational Health Centre.
(41) In case of any injury / accident while working, it shall immediately be reported to Safety
Department through concerned Sectional Head / Engineer. The prescribed Form No. 21 &
ANNEXURE may be obtained from concerned section or Dy.Safety Officer/Safety Officer.
In case of any electrical accident, it shall immediately be reported to Electrical Safety
Officer through concern Sectional Head / Engineer. The prescribed Electrical accident
form no. A as per electricity act-2003 & Form No. 21 & ANNEXURE as per Gujarat
Factories rules shall be filled up by concern department JE/DE with written consent of
contractor. The Form may be obtained from concerned Electrical section or Electrical
Safety Officer. Electrical accident investigation shall be carried out by Electrical Safety
Officer with Factory Manager.
After any reportable accident, Contract agency shall be submitted the fitness certificate of
injured person with endorsement of GSECL factory Medical Officer to LWO/Dy.Safety
Officer/Safety Officer/Electrical Safety Officer then after injured person may allow for
(42) For any incident occurred but have no injury to any persons should also reported as per
GSECL format and informed to Dy.Safety Officer/Safety Officer as Near Miss Incident.
(43) Safety penalty shall be imposed against Offences by contract workers: If any contract
worker worked in a factory contravenes any provision of Factories act or any rules or
orders made there under ,imposing any duty or liability on workers, contractor/agency
shall be punishable with fine which mentioned as under.
Sr. Description of penalty Amount
(i) Work without PPEs Rs.300/- per person
(ii) Work without work Safety permit like working at Rs.1000/- per day
height, confine space entry, hot work etc.
(iii) License of driver as per type of vehicles not Rs.750/- per person
(iv) Welding work without flashback arrestor/double Rs.1000/- per set
gauge regulator set
(v) Operate Portable power tool without ELCB Rs.1000/-per
(vi) Work without qualified Supervisor as per nature Rs.1000/-per day
of job like mechanical, electrical, civil, C&I,
(vii) Work without SOP & JSA Rs.2000/-per day
(viii) Work without test report of lifting machines / Rs.2000/- per
tackles (like C.P.Bs., Hook chooks, winch, forklift, equipment
mobile crane, EOT crane etc) & its attachments
(like D-shackles, slings, U-clamps, Eye bolts or
any fixtures) in Form No.10 of Gujarat Factories
(ix) Work without Double lynyer Safety belt during Rs.3000/-per person
working at Height work, work without anchoring
in hook/line line
(x) Work without 24 Volt supply in Confine space Rs.3000/-per person
(xi) (a) Grinding machine used without safety Rs.500/-per
guard/machine guard equipment / per set
EW- 348 PUR-F-006 RFQ-
(b) unsafe welding machine like open body, Knob
without insulation, connection without lug
(c) damaged welding cables/gas pipelines
(d) welding work doing without welding blanket,
(e) electrical supply without 3 pin plug/Industrial
(f) use of damaged electrical wire for lighting/
(g) use of lighting lamp without cage,
(h) use of open halogen tube,
(i) use of damaged PPEs/use of non Standard
(j) Unsafe lifting and handling of gas cylinders
(k) Cylinder handling without safety cap
(l) Temporary connection without ELCB, etc.
During plant visit/supervision of concern JE/DE/EE, SE, Safety Officer/Dy.Safety Officer,
Electrical Safety Officer, Factory Manager, If they will observed any safety violations as per
CO circular/statutory requirements then they must impose Safety Penalty through office
note directly against contract workers/ contract agency and Office Note process through
proper channel to concern Sectional head and Account head for recovery purpose.
Photograph/CCTV footage is to be put up with penalty note by imposing officer.”
(44) Party will damage any fire equipments or property or machinery in factory during execution
of work, total damage cost will be recovered from party RA bill and recovery Office note put
up by concern HOD.
(45) All the relevant labour and industrial laws shall also be followed compulsorily.
(46) After completion of work, cotton waste, grease, oil, unused material, welding rod pieces,
scrap etc. are to be removed by contractor and scrap shall be deposited to scrap yard of
(47) For performance evaluation of contractor, safety factors of work accident, fire incident &
near miss accident will be considered. Steps can be taken to review the job assignment up
to cancellation for negligence.
(48) Over & above these, contractor shall have to follow all the safety requirements /rules &
regulations / norms and legal provisions laid down in various statutes. Particularly the
provisions of The Factories Act-1948 & the Gujarat State Factories Rules-1963 (Amended
up to date), The Electricity Act-2003 & rules, BOCW Act/Rules shall be followed strictly.
The contractor shall also obey the rules / regulations / instructions of the local Competent
Authority for safety & health requirements.
(49) The above rules shall be scrupulously followed and where required, Contractor /contractor
workers may contact to the Dy.Safety Officer/Safety Officer/Electrical Safety Officer in case
of any ambiguity or needs further guidance in this regard.
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 348 PUR-F-006 RFQ-
Terms and Conditions regarding Labour Laws
During the entire period of the contract, the Contractor and his SubContractor shall at all times
comply with all applicable labour laws, rules, regulations, notifications, and bye-laws issued by
the Central Government, State Government, or Local Authorities. This includes all existing laws
as well as any amendments or new notifications that may come into force during the contract
The Contractor and his Sub-Contractors shall, at all times abide by the following Act/statutes
related to Human Resources:
1. Factories Act, 1948;
2. Contract Labour (Regulation & Abolition) Act, 1970;
3. EPF & MP Act, 1952;
4. Building & Other Construction Workers (Regulation of Employment & Conditions of
Service) Act, 1996;
5. ESI Act, 1948;
6. Minimum Wages Act, 1948;
7. Payment of Wages Act, 1936;
8. Payment of Bonus Act, 1965;
9. Payment of Gratuity Act, 1972;
10. Workmen's Compensation Act, 1923;
12. Maternity Benefit Act, 1961;
13. Inter-State Migrant Workmen (Regulation of Employment & Conditions of Service) Act,
14. The Building And Other Construction Workers' Welfare Cess Act, 1996;
15. The Carriage by Road Act,
The above list is only indicative and not exhaustive. The Contractor shall remain fully
responsible for ensuring compliance with all other applicable labour and welfare legislations,
rules, and regulations in force during the contract.
The following are some of the major responsibilities of the contractor, in addition to other
obligations prescribed under various labour laws, rules, and regulations issued by statutory
authorities such as the State Government or Government of India from time to time, which the
contractor shall strictly comply with during the execution of the contract.
1) The Factories Act,
The contactor should not deploy worker below the age of 18 years and above 60 years for
the awarded work.
Earn Leave shall be paid to their bonafide contract workers as per the provisions of the
Payment of Earned Leave should be made monthly together with wages for better
compliance of law. The contactor shall maintain Earn Leave Register in Form No. 19 as per
the provisions of the said Act and submit the same on demand.
All the written registers, Performa etc. shall be maintained up to date and kept ready for
inspection at any time or submitted on-time to the concerned authorities as per
applicability of the Acts by cotractor.
2) The Contract Labour (Regulation and Abolition) Act,
The Contractor / Agency shall have to obtain the Labour License under Contract Labour
(Regulation & Abolition) Act from the appropriate authorities before commencement of
work. The contractor tor shall maintain a valid labour license under the Contract Labour
(Regulation and Abolition) Act for employing necessary man power to be required by
The contractor should not be allowed to engage fifty (50) or more contract labourers
without initiating to obtain the labour license under the Contract Labour Act. (the said
number i.e., fifty (50) or more includes Supervisor and other staff).
EW- 348 PUR-F-006 RFQ-
3) Minimum Wages Act,
Contractor shall have to make the payment of wages to the Contract Labours engaged by
them, on or before 7th of every month through nearest Nationalized Bank compulsory,
preferably situated in the premises of TPS area in case of all works contract. The
Contractor shall supply copy of Bank Statement duly stamped by the Concerned Bank as
well as debited entry of amount displayed in the contractors' own bank account as token of
proof towards payment of Wages through CLIM/prevailing system at relevant time. Apart
from Payment of wages through Bank, Contractors shall have to make all other payments
like Advances, Bonus, Leave Encashment etc. to their labours through bank only and cash
payment entry will not be allowed.
Wages rates for contract laborers are applicable as per the terms and conditions of the
license. The contractor shall have to pay wages to workers as notified by the Government of
Gujarat from time to time.
Any default to pay the minimum wages to the engaged workers and deprived of their right
to minimum wages payment on or before 7th of each month shall be dealt as per the
provision of labour laws. Recurrence of the same may lead to cancellation of awarded
4) The Provident Fund and Miscellaneous Provisions Act,
The contractor must possess separate P.F. code on the name of the Firm /Agency
/Company itself for the subject work.
It should be ensured that all the contract labours engaged by contractor are covered under
the provident fund scheme and employee's pension scheme and their contribution must be
remitted regularly to the concerned RPFC. The photocopies of challan along with ECR in
this regards should be submitted regularly to the User Department to enable their onward
billing clearance.
The contractor shall submit along with his bill (month wise) statement regarding
deductions against employees' provident fund and family pension scheme in respect of
each concerned employee' Provident fund and family pension scheme at the rate of 12 %o
of wages (or at the rates made applicable by the Government time to time). The contractor's
contribution and his workers contribution towards provident fund and family pension
scheme shall deposited by the contractor with concerned PF Authorities.
5) Workmen's Compensation & Employer's Liability Insurance.
The contractors shall have to obtain Employee Compensation Policy under the Employees
Compensation Act before starting the work. Employee Compensation Insurance shall be
obtained for all the workers engaged for the execution of awarded contract. If any of the
work is sub-letted the contractor shall ensure that the sub-contractor take and provide
workmen's compensation and Employer's liability insurance for the labours engaged.
Contractor is liable to pay compensation in case of accidental injury arising out of and in
the course of employment as per the said Act and shall bear medical expenses due to on
6) The Payment of Gratuity Act,
For better compliance, contractor shall pay amount of gratuity on a monthly basis along
with the payment of wages, calculated on a pro-rata basis per month, which is equivalent
to 15 days' wages for each completed year of service for every worker. (* applicable to ARC
/ BRC works contract only)
7) The Payment of Bonus Act,
Every worker shall be entitled to be paid by the contactor in an accounting year, bonus, in
accordance with the provisions of this Act, For better compliance, the contractor should
pay bonus amount on a monthly basis along with wages calculated on a pro-rata basis per
month. Contactor has to submit the paid bonus details of its worker in Form No. C as per
the provisions of the said Act as and when required by the Govt. Authority as well as by
8) The Maternity Benefit Act,
Contractor shall ensure that entitled female worker should provide Maternity Leave and
other benefits as per the provision of the said Act.
9) The Building and other Construction Workers' Act,
For any construction work, fall under the definition of Section 2(1) d), happening outside /
inside the Factory premises the said act will be applicable and the contactor or its sub-
contactor shall be liable to comply with the provisions framed there under.
EW- 348 PUR-F-006 RFQ-
10) The contractor shall give preference to existing or local contract workers for engagement in
the awarded contract and shall issue appointment orders to each and every workers
individually at the time of their engagement during the period of contract and terminate the
same at the end of the each contract.
Follow the mentioned procedure for each milestone for the execution of works contract.
11) On Commencement of Contractual Work
1. Before starting the work, the contractor may contact Labour Welfare Officer /
Industrial Relations Officer for all formalities related to labour law compliance before
commencement of the contract and onward Labour Law compliance thereof,, so that
later no dispute will arise in respect of compliance of labour laws.
2. It is the responsibility of the contractor to ensure that contactor’s employees maintain
strict discipline as regards security, methods of safe working etc., and not to cause any
hindrance to smooth running of power station or in execution of duties by GSECL staff
Any lapse in this regard will be viewed seriously and if lapse found, contact is liable to
be terminated. If any of contractor's staff is found unsuitable or not behaving properly,
the contractor shall have to remove such worker from the work-site on demand by EIC.
To maintain harmonious industrial relations amongst contact labours is solely the
responsibility of contractor. Any breach of the same will be viewed seriously.
3. A digital system developed at the request of the agencies working at the premises of
GSECL, is to facilitate them for easy, efficient, effective management of data, gate
passes, attendances, medical records, Police Verification documents etc. related to their
employees / workers deployed for various works and services against work order of
4. On receipt of LOA and before commencement of work, authorized representatives of the
agency shall login in the CLIMS online portal / prevailing system at relevant time and
apply for registration of their employees / workers uploading all information with
required documents in digital form. Upon completion of due verifications, clearance by
EIC and HR departments, contracting agency will obtain gate passes. GSECL will only
consider documents like wage sheet duly accepted and signed by individual workers, as
per the engagement/deployment duration/hours of individual worker duly certified by
the agency, being the employer, for the purpose of payment of bills and HR clearances.
Agency shall be solely responsible for maintaining accurate and upto-date data of their
workers in the portal/ prevailing system at relevant time. All statutory compliances
under prevailing laws shall remain the responsibility of the contracting agency. The
agency shall indemnify/ GSECL against any liabilities arising from non-compliance of
legal provisions or inaccuracies in the data maintained by them in the digital portal of
CLlMS/prevailing system at relevant time.
5. The Contractor who intends to engage labours more than the specified limit under law,
then necessary - Form No. V under the Contract Labour (R & A) Act, 1970 or Form No.
VI under the Interstate Migrant worker (employment regulation) Act 1979 as applicable
is to be obtained for the purpose of obtaining Labour License from the Licensing
6. It shall be the duty of the Contractor or his Supervisor to ensure Bio-Metric punching
and reporting at the location of work.
7. The contractor shall employ adequate number of experienced staff at site for daily
supervision and for maintaining of various registers and records required under the
Labour laws and contracts. No payment for such supervision shall be admissible.
8. The gate passes obtained for any specific work order will be valid for that specific work
order only and contractor should not divert the man power for any other work order. If
any work or part thereof is desired/required to sublet, the contactor shall obtain the
necessary permission of EIC in black and white well in advance which is mandatory for
considering the statutory documents of agency other than the agency who awarded
12) During Contractual Work under the progress:
1. All Contractors shall have to make the payment of wages to the Contract Labours
engaged by them, on or before 7th of every month through Nearest Nationalized Bank
compulsory, preferably situated in the premises of power station area. The Contractor
shall supply copy of Bank Statement duly stamped by the Concerned Bank as a token
EW- 348 PUR-F-006 RFQ-
of proof towards payment of Wages through CLIMS / prevailing system at relevant
2. All Contractors has to comply & maintain statutory documents / registers under the
provision of labour laws & EPF Act.
3. In case the contractor having more than one contract in the same TPS, the contractor
shall have to obtain work order wise separate Gate Passes and submit the same with
the documents of statutory compliance that too work order wise every month to the
User Department to enable their onward billing clearance.
13) CONTRACTORTO II\TDEMNIFY THE GSECL REGARDING LABOUR LAWS
The contractor shall indemnify and keep indemnified the GSECL, and every member,
officer and employees of the GSECL, also Engineer-in-charge and his staff against all
actions, proceedings, claims, demands, costs and expenses whatsoever arising out of or in
connection with the matter referred in above clauses and elsewhere and against all actions,
claims demands, cost and expenses which may be made against the GSECL by any
workman/ employees of contractor or any sub-contractor and or from any liability any wise
to any workman/employees of the contractor or sub-contractor under any laws, rules or
regulation having in force of law including but not limited to claims against the owner
under employee compensation Act, 1923. The Employee's Provident Fund Act.l952, and/or
the contract labour (Abolition and Regulation) Act,
The GSECL shall not be liable for or in respect of or in consequence of any accident or
injury to any workmen or other person in the employment of the contractor or his sub-
contractor, and the contractor shall indemnify and keep indemnified the GSECL against all
such damage and compensation and against all claims, demands proceedings costs,
charges and expenses whatsoever in respect of or in relation thereto.
The contractor shall at his own expense / risk and cost to comply with all the labour laws
as above-mentioned and keep the G.S.E.C.L. indemnified in respect thereof.
GSECL : shall be entitled /empowered to deduct directly from the bills, the amount to be
paid to engaged bonafide contract workers or the contract workers engaged by Sub-
contractor any sum or sums payable by main contractor / sub-contractor and which
sum/sums the Corporation is required to pay in capacity of Principal Employer on account
of the default of contractor in respect of all liabilities incurred out of non-compliance
regarding any provisions of Labour Laws and same amount shall be recovered from the
pending dues of the contractor with 15% administrative charges.
Any other rules and regulation, conditions, circulars etc., that are in force at present and
that may be famed by the G S E C L from time to time in connection with contracts will be
binding and acceptable to contractor. The above are some of the major liabilities of the
contractor in addition to other liabilities prescribed under the various labour laws in force
from time to time from Statutory Authorities like State Government / Government of India,
which the contractor shall have to comply with.
The contractor shall provide the name of authorized representative, as provided to other
statutory Government authorities and will be notified to Engineer In-Charge time to time.
14) Submission of Statutory documents to ensure the compliances:
The contractor shall upload statutory documents, work order-wise, under Labour Laws and
EPF in CLIMS / prevailing system at relevant time. Required documents shall be uploaded
by the contractor in existing portal /prevailing system at relevant time invariably each
month to Engineer In-Charge for onward process and smooth clearance by HR Department.
List of documents required for gate passes of contract workers through clims / prevailing
Sr. Description of documents attached
1 Copy of Work Order
2 Copy of P. F. Code No.
3 insurance Policy as per subject of work order under the Workmen
EW- 348 PUR-F-006 RFQ-
Compensation Act,
4 Contract agreements/ subletting work contract documents with
5 Copy of Id proof of Aadhar card or Election voting card or driving
license or Passport only
6 Copy of Police Verification in respect of each contract workers
16. The contractor whose work order value is above Rs. 5 lacs shall have to submit
‘Declaration cum Indemnity Bond’ on Rs. 300/- Non-Judicial stamp paper in prescribed
Performa (Annexure- ‘B’) with Agreement and Indemnity Bond before the commencement
of the contract.
EW- 348 PUR-F-006 RFQ-
DECLARATION CUM INDEMNITY BOND
(On Rs.300/- Non Judicial Stamp Paper duly notarised)
THIS DECLARATION CUM INDEMNITY BOND made at_____________________
(mention location) by M/S. ________________________________________________ having its Reg.
office at___________________________(hereinafter referred to as “Contractor” which expression
Shall unless it be repugnant to the context or meaning thereof, be deemed to mean and include
their respective assigns, successor, executors, subcontractors and/or administrators) of the
ONE PART in favour of M/S Gujarat State Electricity Corporation Limited having its power
Station at Gandhinagar Thermal Power Station (hereinafter referred to as the “Company”),
which expression shall unless it be repugnant to the context or meaning thereof be deemed to
mean and include its assigns, successors) of the OTHER PART.
WHEREAS the COMPANY has entered into a contract with the Contractor for the work of
_____________________________________dated_____________“hereinafter called the “Contract”);
AND WHEREAS it is one of the essential conditions of the Contract that the Contractor shall
comply with all the provisions of the Labour& Industrial Laws, as may be applicable from time to
time for the discharge and completion of the works and completion of the Works and Services
covered under said Contract Labour (R & A) Act 1970, Child Labour (Prohibition and Regulation)
Act 1986, The Employees Provident Funds & Miscellaneous Provisions Act, 1952, Employees
State Insurance Act 1948, Minimum Wages Act, 1948, Payment of Bonus Act, 1965, Payment of
Wages Act, 1936, Employees Compensation Act, 1923, Factories Act, 1948 and other Labour
Laws, Rules, Notifications and Codes which are at present applicable to the contractor and
which may be applicable during the tenure of the contract (hereinafter referred as the ‘Laws’).
AND WHEREAS the Contractor has agreed to execute this Declaration cum Indemnity Bond to
this effect and has agreed to indemnify and Company, it’s Directors, Officers and employees and
representatives indemnified and hold harmless against all third party claims, charges, penalties,
fines, expenses, losses, damages costs, suits or any other levy against the Company and/or the
management due to the failure of the Contractor to observe or follow all applicable laws.
NOW THIS DEED WITNESSETH AS UNDER:
1. The Contractor hereby declares that all acts, deeds, actions, activities, conduct and lapse,
delays, misdeeds, faults, breaches, inactions etc done by his assigns, successors, executors,
subcontractor and/ or administrators shall be construed to be have been done by the
contractor and he alone shall be liable for such acts, inactions etc.
2. In consideration of the Company awarding the Contract to the Contractor subject to the
condition of execution of this Declaration cum Indemnity bond, the Contractor declares and
represents to the Company that the Contractor has obtained all Statutory registrations,
Certificates, licenses and approvals required under the Laws enabling the Contractor to
execute the Contract in a legal and lawful manner.
3. That in the event of any liability arising out of failure to observe or non-compliance of any
such „Laws‟ by the Contractor in connection with the Performance of the contract, the
Contractor shall bear all the resultant whatsoever liability(ies), if any arising out thereof and
that the company, its Directors, Officers and employees, representatives, shall not be liable
for any such liability(ies). The Contractor agrees to indemnify and keep the Company and its
Directors, Officers and employees, representatives indemnifies, defend and hold harmless,
against all losses, costs, damages, claims, penalties, interest, expenses, demands, fines,
legal liability, causes of action, injury to persons, suits etc., which may be suffered,
incurred, undergone and / sustained by the Company including the Costs and expenses
that may be incurred in defending any such liability(ies) claim(S), Proceeding (S) etc. that
maybe made or taken or taken or arise on the same by any Person, body, authority,
government, judicial / quasi - judicial authority due to the failure or non-compliance of any
such laws and rules there under (including any amendments in acts, laws, statutes & rules
EW- 348 PUR-F-006 RFQ-
there under) of whatsoever kind and nature arising out of or in any way connected with,
whether or not such acts or omissions are actual or alleged, active or passive with regard to
the discharge of the said Contract.
4. The Contractor further declares that in case of any suit / claim / right / damages /
compensation / fine / levy / charges / expenses / losses / penalties / costs raised by the
third party, including contract labours engaged by the contractor, he shall join such
proceedings in such Suit/Court/Tribunal/Authority and effectively defend the same.
5. The Contractor hereby agree and undertakes to make good any loss, damage, claims, suits,
demands, decrees, expenses that the Company may suffer to the fullest satisfaction of the
Company and if the Contractor fails to make good the same then the Company shall have
the right to recover the same and or any other loss sustained, without any restriction or
limitation, together with any other incidental expenses, costs, and all incidental logistic
expenses etc that may be suffered by the Company from the Contractor and the Contractor
hereby further confirms and declares that this Declaration cum Indemnity Bond is
irrevocable and shall be final and binding on it / him heirs, executors, administrators, legal
representatives, successors, subcontractors and assigns, wherever the context applies. any
claims, demands, shall be adjusted against any amount due and payable to the Contractor
and the Company shall have the right to withhold any amounts due and payable to the
Contractor, till the settlement of such claims, disputes to the Contractor towards discharge
of such claims, obligations etc.
6. This Declaration cum indemnity bond shall be in accordance with the laws of India and any
dispute between the parties with regard to this Declaration cum Indemnity Bond shall be
resolved through the dispute resolution process mentioned in the General Conditions of the
Contract (GCC).
IN WITNESS WHEREOF, the said Contractor has hereunto set their hand the day and year first
hereinabove written.
SIGNED SEALED AND DELIVERED By the within named “CONTRACTOR”
(Authorised Signatory)
Rubber Stamp of Firm/Company
In presence of Witness
Name & Address of Witness Signature
Residential Address:
Residential Address:
EW- 348 PUR-F-006 RFQ-
GUJARAT STATE ELECTIRICITY CORPORATION LTD., GANDHINAGAR
TENDER & CONTRACT FOR WORKS
GENERAL RULES AND DIRECTIONS FORTHE GUIDANCE OF CONTRACTOR
Notwithstanding anything contained to the contrary in the specification or tenders in
subsequent exchange of correspondence, the conditions of contract shall be binding on the
contractor and any change of variation expressed or implied however made in the said
conditions shall not be however valid or operative unless expressly sanctioned by the
corporation The contractor shall be deemed to have fully informed himself and to have special
knowledge of the provisions of the conditions of contract herein contained.
1. All works proposed to be executed by contract shall be notified in one of the English and one
of the vernacular local daily newspapers stating the work to be carried out as well as the date
for submitting and opening tenders and time allotted for carrying out the work also the
amount of earnest money to be deposited with the tenderer and the security deposit to be
deposited by the successful tenderer.
2. Copies of the specifications, designs drawings, estimated rates. Schedule rates and any other
documents required in connection with work which will be signed by the Executive Engineer
for the purpose; of identification shall be open for inspection by the contractors at the office
of the Executive Engineer during office hours.
3. Where the works are proposed to be executed according to the specification recommended by
a contractor and approved by a competent authority on behalf of the Gujarat State
Electricity Corporation Ltd. Such specification with designs and drawings shall form part of
the accepted tender.
3 The tender and receipts for payments made on the account of any work, when executed by a
firm, should be signed by all the partners except where the contractor are described in their
tender as firm in which case the receipt shall be signed in the name of firm including the
Partners or some other persons; having authority to do so.
5. Any person who submits tender at percentage rate shall fill up the usual form stating what
percentage above or below rates specified he is willing to undertake the work. Only one rate
or such percentage on all the estimated rates or scheduled rates shall be mentioned.
6. Tenders which propose any alteration in the work specified in the form invitation to tender or
in the time allowed for carrying out the works or which contain any other conditions of any
sort, will be liable to rejection.
7. No single tender shall include more than one work. but contractors who wish to tender, for
two or more works, shall submit a separate tender for each work. Tender shall have the
name and the number of the works of which they pertain be subscribed on the envelop.
8. The Executive Engineer or his duly authorized assistant will open tenders in the presence of
any intending contractors who may be present at the time and will enter the amount of the
several tenders in a comparative statement in a suitable form. In the event of tender being
accepted the contractor shall thereupon, for the purpose of identification, sign copies of the
specifications and other documents. In the event of tender being rejected the officer
(Executive Engineer ) shall authorize the paying officer to refund the amount of the earnest
money deposited to the contractor making the tender on his giving for the return of the
9. The officer competent to dispose off the tenders, shall have the right of rejecting all or any of
the tenders without assigning any reasons thereof.
10. No receipt for any payment alleged to have been made by a contractor in regard to any
matter relating to tender of the contract shall be valid and binding on the corporation unless
it is signed by the Executive Engineer.
11. The memorandum of work to be tendered for and the schedule of materials to be supplied by
the Gujarat state Electricity corporation Ltd. and their rates shall be filled in and completed
by the office of Executive Engineer before the tender form is issued if a form issued to an
intending tenderer has not been so filled in and uncompleted he shall request the said office
to have this done before he completes and delivers his tender.
12. All work shall be measured, meet by standard measure and according to rules and custom
and usual in the use in the Gujarat state electricity corporation Ltd. and no proposals to
EW- 348 PUR-F-006 RFQ-
adopt alternative method will be accepted. The Executive Engineer's decision as to what is
the usual method in use in the Gujarat state Electricity Corporation Ltd. shall be final.
13. Every contractor shall except the registered contractor on the approved list of the corporation
produce along with his tender a solvency certificate from the collector of the District within
which he resides or a bankers Certificate of his financial stability if he fails to produce such a
certificate his tender will not be considered.
14. All correction and addition or pasted slips should be initiated.
15. Tenderer shall be deemed to have full knowledge of all relevant documents site conditions
etc. whether inspected or not by him.
16. Submissions of a tender by a contractor implies he has read the instruction and conditions
of contract and has made himself aware of the scopes and specification of the work to be
done & of the conditions and rates at which stores etc. will be issued to him and local
conditions and other factors bearing on the execution of the work.
17. Under no circumstances shall any contractor be entitled to claim enhanced rates for any
items of contract without prior sanction of the competent authority.
18. These rules and directions shall form part of the contract.
I/We hereby tender for the GUJARAT STATE ELECTRICITY CORP.LTD. (herein referred as
"Corporation") of the work specified in the under written memorandum within the time specified
in Scheduled B (memorandum showing items of work to be carried out) and in accordance in all
respect with the specifications design drawing and instructions in writing and as per annexed
conditions of contract and agree that when the materials for works are provided by the
corporation such materials and rates to be paid for them shall be as Provided in schedule A
(a) General description of work.
(b) Estimated cost.
(c) Earnest money.
(d) Security deposit:
(1) Party shall have to pay security deposit(if applicable) in the form of Bank Guarantee/
Demand Draft in favour of GSECL payable at Gandhinagar within 10 days of date of issue
of Letter of Intent.
(2) Time allowed for the completion of work from date written order to commence. Should this
tender be accepted I/we hereby agree to abide by and fulfill all the terms and provision of
conditions of contractor annexed hereto as applicable and in default thereof forfeit and pay to
the corporation the sums of money mentioned in the said conditions.
Receipt No. date from the GUJARAT STATE ELECTIRICITY CORP. LTD. in respect of
sum of Rs. (The amount to be specified in figure & words,) Is herewith forwarded representing
the earnest money (the full value of which is to be absolutely forfeited to the CORPORATION
l/We not deposit the full amount Deposit of the said conditions/otherwise the said sum of Rs.
Shall be refunded on surrendering the original receipt.
Signature of the Contractor Address of the Contractor
Signature of witness Address of Witness Occupation
The above tender is hereby accepted by me on behalf of the Gujarat State Electricity Corporation
EW- 348 PUR-F-006 RFQ-
The Chief Engineer (Gen).
Superintending Engineer
Executive engineer
Or his duly authorized assistant.
EW- 348 PUR-F-006 RFQ-
GUJARAT STATE ELECTIRICITY CORPORATION LTD, GANDHINAGAR
TENDER & CONTRACT FOR WORKS
CONDITIONS OF CONTRACT
(a) The “contract” means the documents forming the tender and acceptance thereof together
with the document referred to therein or individual work order in the case of term contracts
including these conditions schedules and or additional conditions attached to the form of
tender or individual works, order, rate schedule the specifications and the drawings and all
these documents as applicable taken together shall be deemed to form the contract.
(b) The “Tender Document” means the form of tender the applicable schedules and/or
additional conditions and the specifications and/or drawing as issued on the contractors for
the purpose of preparing tender.
(c) The expression "Works" or 'work when used in the condition of contract shall, unless there
be something in the subject or context repugnant to such construction means the work or
the work contracted to be executed under or in virtue of the contract whether original or
(d) The "Contractor” means the individual or firm or company. Whether incorporated or not,
undertaking the works and shall include his or its legal personal representatives successors
and permitted assignees.
(e) ”Corporation” means Gujarat state Electricity Corporation Ltd. and the "Accepting Officer"
means the officer who is authorized to sign and signs the contract on behalf of the
(f) The letter “EE" means Executive Engineer who in the case of measurement and lump sum
contracts directs the contract and the letters S.E. mean Superintending Engineer and
"CE(G)" means Chief Engineer (Generation), who administers and in the case of the term
contracts directs the contract.
(g) 'The Engineer-in-charge" means all officers of the CORPORATION appointed by the Chief
Engineer (Gen), to supervise the works or part of the works.
(h) "Approved" and "Directed" means the approval or direction of the Chief Engineer (Gen), or
the Superintending Engineer or the person deputed by him for the particular purpose.
(i) B.S. means the "British Standards" as issued by the British Standard Institution. "A.S.”
means the “American Standards" as issued by the "American Standards Institution" and
"I.S." means the “Indian Standards" as issued by the Indian Standards Institution.
Wherever the above mentioned abbreviations are referred to in the specifications
and/or work orders, they mean the addition with all amendments current at the date
of issued of tender document of work orders.
In case of measurement and terms of contracts "Specifications" mean those contained in Gujarat
State Electricity Corporation Ltd. Schedule together with any amendments etc. embodied in
the tender documents “Drawing” refer to those accompanying the tender documents and/or
any work orders referred therein.
(j) The “Contract Sum" means the sum accepted or the sum calculated in accordance with the
prices accepted in the tender and/or the contract rate as payable to the contractor for the
full and entire execution and completion of works.
(k) "The date for completion" is the date or dates of completion of the work or any part of the
works set out or ascertained in accordance with the individual work orders and the tender
documents or any subsequent agreed amendments thereto.
EW- 348 PUR-F-006 RFQ-
GUJARAT STATE ELECTIRICITY CORPORATION LTD., GANDHINAGAR
TENDER & CONTRACT FOR WORKS
1. Security Deposit:
The contractor shall within 10 days from the date of issue of letter of intent pay the security
deposit for the performance of the contract.All damages, costs, charges, expenses and other
sums which may be or may become due to payable by the contractor to the CORPORATION
under the terms of the contract may be deducted from the cash the proceeds of sale of the
securities so deposited (which the officer or person to whom the same may be endorsed as
aforesaid is hereby authorized to sell that purpose) of from the interest of any such securities or
from any sums or which may become due to the contractor by the CORPORATION whole or the
balance unapplied as aforesaid of cash securities so deposited being repaid or transferred and
returned as may be to contractor after the date on which the final bill is paid or after the expiry
of the date up to which the contractor has to maintain the work in good order whichever is later.
2.Compensation for the delay :
The time limit allowed for carrying out the work as entered in the tender shall strictly observed
by the contractorand shall be reckoned from the date on which the order to commence the work
is given to the contractor. The work shall throughout the stipulated period of contract be
proceeded with all due diligence (time being deemed to be the essence of contract) and for delay
the contractor shall pay compensation an amount equal to half percent per one week for the
Contract value or as per the decision of the Competent Authority of the GSECL..
3. Action when whole of Security Deposit is forfeited;
In any case in which under any clause of this contract the contractor shall have tendered
himself to pay compensation amounting to the whole of his security deposit (whether paid sum
or deducted by installments) or in the case of abandonment to the work owing to serious
illness/ death of the contractor or any other cause, the Executive Engineer on behalf of the
corporation shall have powers to adopt (a) below and any of the following causes under (b) and
(c) as he may deem best suited to the interest of the corporation.
To rescind to the contract (or with rescission notice of 10 days in writing to the contractor
under the hand of the Executive Engineer shall be conclusive evidence and in that case the
security deposit of contractor shall stand forfeited and be absolutely at the disposal of the
(b) To employ labor paid by the corporation to supply materials to carry out the works, or any
part of the works debiting the contractor with the cost of the labor and the price of the materials
(as to the correctness of which cost & price, the certificate of Executive Engineer shall be final &
conclusive against the contractor) and crediting him with value of the work done. In all respect
in the same manner and at the same rates as if it had been carried out by the contractor under
the terms of this contract and in that case the certificate of the Executive Engineer as to the
value the work done shall be final and conclusive against the contractor.
(c) To order that the work of the contractor be measured up and to take such part thereof as
shall be unexecuted out of his heads and to give it to another contractor to complete in which
case any expenses which may be incurred in excess of the sum which would have been paid to
the original contractor if the whole work had been executed by him (as to amount of which
excess expense the certificate in writing of the Engineer shall be final, conclusive and shall be
paid by the original contractors) and shall be deducted from any money due to by the
corporation under the contract or otherwise from his security deposit of the proceeds sale
thereof or a sufficient part thereof.
In the event of the above causes being adopted by the Executive Engineer the contractor shall
have no claim to compensation for any loss sustained by him by reason of his having purchased
or procured any materials or entered into any engagement or made any advances on account of
or with a view to the execution of the work or the performance of the contract. And in case the
contract shall be rescind under the provision aforesaid the contractor shall not be entitled to
recover or be paid any sum for any works thereof actually performed by him under this contract
unless and until the Executive Engineer shall have certified in writing the performance of such
work and the amount payable to him in respect thereof and he only be entitled to be paid the
amount so certified.
4. Notice for Unsatisfactory Progress :
If the progress or a particular portion of the work is unsatisfactory the Executive Engineer whose
decision shall be final shall not withstanding that the general progress of work is satisfactory be
entitled to take action under Clause 3(b) after giving the contractor 10 days notice in writing and
EW- 348 PUR-F-006 RFQ-
the contractor will have no claim for compensation for any loss sustained by him owing to such
5. Action in the case of Default by Contractor:
If any case in which any of power conferred upon the Executive Engineer by Clauses 3 and
hereof shall have exercisable and the same shall not have been exercised, the non-exercise
thereof shall not constitute a waiver of any of the conditions hereof and such powers shall
notwithstanding be exercisable in any further case of default by the contractor for which by any
hereof he is declared liable to pay future compensation shall remain unaffected in the event of
the Executive Engineer taking action under sub-clause (a) or (c) of Clause 3 he may, if he so
desires take possession of all or any tools plant materials and stores in so upon the work or the
site thereof belonging to the contractor or procured by him and intended to be used for the
execution of the work or any part thereof paying for allowing the same in account at the
contract rates or in the case of a contract rates not being applicable of current market rates to
be certified by the Executive Engineer whose certificate thereof shall be final. In the alternative
the Executive Engineer may by notice in writing to the contractor or his clerk of works, foreman
or other authorized agent require him to remove such tools Plant materials or stores from the
premises within a time to be specified in such requisition the decision to the contractor failing to
comply with any such requisition the decision of the Executive Engineer as to the expense of any
such removal and the amount of the proceed and expense of any such shall be final and
conclusive against the contractor.
6. Extension of Time Limit :
If the contractor shall desire an extension of the time limit for completion of the work on the
ground of his having been unavoidably hindered in execution or any other ground he shall apply
in writing to the Executive engineer and the executive Engineer may, if in his opinion there are
reasonable grounds for granting extension recommend such extension as he thinks necessary or
proper. The decision of the competent authority in this shall be final.
7. Completion Certificate
On completion of the work the Contractor shall be furnished with Completion Certificate by the
Executive Engineer of such completion but no such certificate shall be given nor shall be the
work of considered to be complete unit works are taken over and/or duly tested and put to
operation as the case may be nor until the work have been measured by the Engineer in Charge
or where the measurements have been taken by his subordinates until they have received the
approval of the Executive Engineer the said measurements being binding and conclusive against
the contractor.
8. Effect of the Certificate :
No payment shall be made for any work estimated to cost less than Rs. 1,000 till after the whole
of said work shall have been completed and certificate of completion given. But in the case of
works estimated to cost more than Rs. 1,000 contractor shall on submitting a monthly bill
thereof to be entitled to receive payments propionate to the part of the work them approved and
passed by the Engineer-in-charge whose certificate of such approval and a passing of the sum
so payable shall be final and conclusive against the contract of all such intermediate payment
shall be regard as payment by way of advance against the final payment only and not as
payments for work actually done, completed and shall not preclude the Engineer-in-charge from
requiring bad, unsound, imperfect or unskillful work to be removed and taken away and
reconstructed or re erected not shall any such payment be considered as admission of the due
performance of the contractor any part thereof in any respect of the accruing of the claim nor
shall conclude, determine or effect in anyway the otherwise or in any other way vary or affect the
contract. The final settlement and adjustment of the accounts otherwise or in any other way
vary or affect the contract. The final bill shall be submitted by the contractor within one month
of the date fixed for completion of work, otherwise, the certificate of the Engineer-in-charge of
the measurement and of total amount payable for the work shall be final and binding on all
the measurement and of total amount payable for the work shall be final and binding on all
9. Payment to Contractors:
The rates for several items of works estimated to cost more than Rs. 1000 agreed to within shall
be valid only when the item concerned is accepted having been completed full in accordance
with the sanctioned specification. In case, where the items of the work are not accepted as so
completed the Engineer-in-charge may make payment on account of such items at such reduced
rates as he may considers reasonable in the preparations of final or running accounts bills.
EW- 348 PUR-F-006 RFQ-
Bills shall be submitted by the contractor each month on or before the date fixed by the
Engineer-in-Charge for all works executed in the previous month and the Engineer-in-Charge
shall take or cause to be taken the requisite measurement for the purpose or having the same
verified and the claim so far as it is admissible shall be adjusted. If, possible, within ten days
from the presentation of the bills, If the, contractor does not submit the bill within the time
fixed as aforesaid the Engineer-in-Charge may depute a subordinate to measure up the
said work in the presence of the contractor or his duly authorized agent whose counter
signature in the measurement list shall be sufficient warrant and the Engineer-in-Charge may
prepare a bill from such list which shall be binding on the contractor in all respects.
11. Supply of Materials to Contractor:
If the specification of the estimate work provides for the use of any special description of
material to be supplied from the corporations Stores or if it is required that the contractor shall
use certain stores to be provided by the Engineer-in-Charge (such material and stores and the
prices to be charged thereof as hereinafter mentioned being so far as practicable for the
convenience of contractor but not so as in any way to contro1, the meaning or effect of this
contract specified in the schedule or memorandum hereto annexed) the contractor shall be
supplied, with such materials and stores as may be required from time to time be used by him
for the purpose of the contract only and the value of the full of materials and stores so supplied
shall be cut of or deducted from any such item due or thereafter to become due to the contractor
under the contract or otherwise or from the security deposit or the proceeds of sale thereof if the
deposit is held in Government securities the same or a sufficient portion thereof shall be sold
for the purpose. All materials supplied to the contract or shall remain the absolute property of
corporation and shall on account be removed from the site of the work and shall at time be open
to inspection by the Engineer-in-charge. Any such materials unused and in perfectly good
condition at time of completion or determination of the contract shall be returned to the
corporation stores if the Engineer-in-Charge so requires by notice in writing given under his
hand but the contractor shall not be entitled to return any such materials supplied to him as
aforesaid but remaining unused by him or for any wastage in damage thereto.
The contractor shall be responsible for the loss, destruction or deterioration of the material
stores or articles supplied to him by the corporation even if such loss, destruction or
deterioration has occurred under any circumstances whatsoever beyond his control as if the
materials, stores or articles so supplied were his property.
12. Works to be executed in accordance with Specifications, Drawings, Orders etc.:
The contractor shall execute the whole and every part of work in the most substantial and
workmanlike manner and both as regarding materials and in every other respect in strict
accordance with the specifications, the contractor shall also confirm exactly , fully and faithfully
to the designs, drawings and instructions in writing relating to the work signed by the
Engineer-in-Charge and lodge in his office and to which the contractor shall be entitled to have
access for the purpose of inspection at such office or on the site of the work during office hours
and the contractor shall; if he so requires, be entitled at his own expense to make or cause to be
made copies of the specification, and of all such designs, drawings and instruction as aforesaid .
13. Alterations in Specifications and Designs not to invalidate Contracts:
The Executive Engineer shall have powers to make any alterations, in or addition to the original
specifications designs and instructions that may appear to him to be necessary or advisable
during the progress of the work and the contractor shall be bound to carry out-the work in
accordance with any instruction in this connection which may be given to him in writing signed
by the Engineer-in-Charge and such alterations shall not invalidate the contract. Any additional
work which the contractor may be directed to do in the manner above specified as part of the
work shall be carried out by the contractor on the same conditions in all respect on which he
agreed to do the main works, and at the same rates as are specified in the tender for the main
Where, however, the work is to the executed according to the designs, drawings and
specifications recommended by the contractor and accepted by the competent authority. The
alteration above referred to shall be within the scope of such designs, drawings and
specifications appended to the tender.
14. Rates for Works not entered in Estimate or Schedule of Rate of the District:
And if the additional and altered work includes any class of work for which no rate is specified
in this contract then such class of work shall be carried out at the rates entered in the Schedule
of Rates of the Division or at the mutually agreed upon between the Executive Engineer and the
EW- 348 PUR-F-006 RFQ-
contractor whichever are lower. If the additional or altered work for which no rate is entered in
the Schedule of Rates of the Division is ordered to be carried out before the rates agreed upon
then the contractor -thin seven days of date of receipt by him of the order to carry out the work
inform the Executive Engineer does not agree to this rate he shall be notice in writing be at
liberty to cancel his order to carry out such class of work and arrange to carry it out in such
manner as he may consider advisable provided always that if the rates shall have been
determined as lastly herein before mentioned then in such case he shall only be entitled to be
paid in respect of the work carried out or expenditure incurred by him prior to the date of the
determination of the rate as aforesaid according to such rate or rates as shall be fixed by the
Executive Engineer. In the event of dispute, the decision of the Superintending Engineer of the
Circle will be final.
15. Extension of Time Limit in consequence of Addition or Alteration:
The time limit for the work shall be extended in the proportion that the increase in its cost
occasioned by alteration or addition bears to the cost of the original contract work and the
certificate of the Engineer-in Charge as to such proportion shall be conclusive.
16. No Compensation for Alteration in or Restriction of Work to be carried out:
If any time after the execution of the contract documents the Engineer-in-charge shall be for
any reason whatsoever require the whole or any part of the work as specified in the tender to be
stopped for any period or shall not require the whole or part of the work to be carried out at all
or to be carried out by the contractor he shall give notice in writing or the fact to the contractor
who shall thereupon suspend or stop the work totally or partially as the case may be in any
such case except as provide hereunder the advantage which he might have derive from the
execution of the work in full but which he did not so derive consequence of the full amount of
work not having been carried out or on account of any loss that he may be put to on account of
material purchased or agree to be purchased or for unemployment of labor recruited by him. He
shall not also have any claim for compensation by reason of any alterations having been in the
original specification drawings, designs, and instructions which may involve any curtailment of
the work as originally completed. Where, however, materials have already been purchased or
agreed to be purchased by the contractor before receipt by him of said notice, the contractor
shall be paid for such materials at the rate of requirement and are of approved quality and/or
shall be compensated for the loss, if any, that the he may put to in respect of materials agreed to
be purchased by him, the amount of such compensation to be determined by the Executive
Engineer whose decision shall be final. If the contractor suffers any loss on account of his
having to pay, his labor charges during the period during which the stoppage of work has been
ordered under this clause the contractor shall on application be entitle to such compensation on
account of labor charges as the Executive Engineer whose decision shall be final may consider
reasonable provided that the contractor shall be entitle to any compensation on account of labor
charges if in the opinion of the Executive Engineer , the labor could have been employed by the
contractor elsewhere for the whole part of the period during which the stoppage of the work has
been ordered as aforesaid.
17. No claim to compensation on account of loss due to delay of materials by corporation.
The contractor shall not be entitled to any claim any compensation from corporation for the loss
suffered by him on account of delay by corporation in the supply of materials entered in
Scheduled A where’ such delay is caused by:
(i) Difficulties relating to supply of railway wagons.
(ii) Force Major
(iii) Act of God
(iv) Any other reasonable cause beyond the control of corporation
In the case of such delay in the supply of materials.corporation shall grant such extension of
time for the completion of the works as shall appear to the Executive Engineer to be reasonable
in accordance with the circumstance of the case. The decision of the Executive Engineer as to
the extension of time shall be accepted as final by the contractor.
18. Time Limit for Compensation claims:
Under no circumstances whatsoever shall the contractor be entitled to any compensation from
corporation on any account unless the contractor has claimed in writing to the Executive
Engineer within one month of the cause thereof.
19. Action and Compensation payable in case of Bad Work:
At any time before the security deposit is refunded to the contractor shall appear the Executive
engineer or his subordinate in charge of the work that any work has been executed with
EW- 348 PUR-F-006 RFQ-
unsound imperfect or unskillful workmanship or with materials of inferior .quality or that any
materials or articles provided by him for the execution of the work are unsound or of a quality
inferior to that contract for or are otherwise not in accordance with the contract it shall be
lawful for Engineer-in-Charge to intimate this fact in writing to the contractor and then
notwithstanding the fact that the work materials or articles complained of may have been
inadvertently passed, certified and paid for, the contractor shall be bound forthwith to rectify or
remove and reconstruct the work so specific in whole or in part as the case may require or if so
required shall remove the materials or articles so specified and provide other suitable materials
or articles at his own charge and cost, and in the event of his failing to do so within a period to
be specified by the Engineer-in-Charge in the written intimation aforesaid, the contractor shall
be liable to pay compensation at the rate of one percent on the amount of the estimate for every
day not exceeding ten days during which the failure so continues and in the event of any such
failure as aforesaid the Executive Engineer may rectify to get remove and re-execute the work
and replace the materials or articles complained of as the case may be at the risk and expense in
all respects of contractor should the Engineer -in-Charge consider that any such inferior work of
materials as described above may be accepted or made use of, it shill be within discretion to
accept the same as such reduce as he may fix thereof Provided that in the case of any work of
which is visible check is not possible if the Engineer-in-Charge or his subordinate in charge of
the work feels that such work has been executed with unsound, imperfect , unskillful
workmanship or with materials of interior quality, he shall take sample test at random, cost of
which shall; have to borne by the contractor and if after taking such test part of such work is
found to be defective in any respect of to have been executed with materials of inferior quality,
then the contractor shall be paid for the whole work such amount as may be fixed by the office
on the basis of the lowest quality of work found by him in such sample tests.
Sample Test shall mean:
(i) In relation to poles fixed as line supports the token of one pole out of every 100 poles after
taking it out from its foundation for inspection.
(ii) In relation to any other work such test as may be considered necessary by the Engineer-in-
charge or his subordinate in charge of the work.
Cost of sample test shall mean cost incurred for the purpose of taking sample test and for
restoring the tested work to its original condition.
20. Work to be opened to inspection Contractor or Responsible Agent to be present:
All works under or in course of execution or executed in pursuance of the contract shall at times
be open to the inspection and supervision of the Executive Engineer and his subordinate and
contractor shall at all times during the usual working hours and at all other times at which
reasonable notice of the intention of the Executive Engineer or his subordinate to visit the
works shall have been given to the contractor, during which period either he should be present
to receive order and instruction or have a responsible agent duly accredited in writing, present
for that purpose. Orders given to the contractors duly authorized agent shall be considered to
have the same force and effect as if they had been given to the contractor himself.
21. Notice to be given before work is covered up:
The contractor shall be given not less than five days notice in writing by the Executive Engineer
or subordinate In-charges of the work before covering up of otherwise placing beyond the reach
of measurement any work in order that the same may be measured and correct dimension
thereof taken before the same is so covered up or placed beyond the reach of measurement and
shall not and work without the consent in writing of Executive Engineer or his subordinate in
charge of the work. If any work shall be covered up or placed beyond the reach without such
notice having been given or consent obtained the same shall be uncovered at the contractors
expense, and in default thereof no payment or allowance shall be made for such work or for the
materials with the same was executed.
22. Contractors Liabilities:
The contractors shall supply at his own cost all materials (expect such special materials, if any,
as may be supplied from the corporation Stores in accordance with the contract plant tools
appliances, implements ladders, cordage, take scaffolding and any temporary works which may
be required for the proper execution of the work, in the original altered or substituted from and
whether included in the specification or other document forming part of the contract or
referred to in these conditions or note and which may be necessary for the purpose of
EW- 348 PUR-F-006 RFQ-
satisfying or complying with the requirement of the Engineer-in-charge as to any matter on
which under these conditions he is entitled to be satisfied or which he is entitled to require
together with carriage thereof to and from the work. The contractor shall also supply without
charge the requisite number of person with means and materials necessary for purpose of
setting out works, and accounting, weighing and assisting in the measurement of examinations
at any time and from time to time of the work or material. Failing this the same may be provided
by the Engineer-in-charge at the expenses of the contractor and the expenses may be deducted
form any money due to the contractor under the contractor from his security deposit or the
proceeds of sale thereof or of a sufficient portion thereof. The contractor shall provide all
necessary fencing and lights required to protect the public from accident and shall also be
bound to bear expenses of defense of every suit, action or other legal proceedings at law that
may be brought by any person for injury sustained. Owing to neglect of the above precautions
and to pay any such person or which may be awarded in such suit, action or proceedings to any
such Persons or which may with the consent of the contractor be paid in compromising any
claim by any such person.
23. Contractors Liable for all Damage:
Compensation for all damages done intentionally or unintentionally by contractor's laborer
whether in or beyond the limit of corporation’s property shall be estimated by the Executive
Engineer, or such other officer as he may appoint and the estimates of the Executive Engineer,
subject to the decision of the Superintending Engineer, on appeal shall be final and the
contractor shall be bound to pay the amount of the assessed compensation demand failing
which, the same will be recovered from the contractor as damages or deducted by the Engineer-
in-charge from any sums that may be due to or become due from corporation to the contractor
under this contract or otherwise. The contractor shall bear the expense of defending any action
or other legal proceeding that may be brought by any person for injury sustained by him owing
to neglect of precautions to prevent the spread of fire and he shall also pay any damages and
cost that may be awarded by the court if in consequence.
24. Rescission of Contract and Forfeiture Deposit
The contractor shall not be assigned or subject without the written approval of the Engineer-in-
charge and if the contractor assign or subject his contract, or attempt to do so or become
insolvent or commence any Proceedings to be adjudicated as insolvent or make any composition
with creditors, attempt to do so the Engineer-in-charge may by notice in writing, rescind the
contract. Also, if any bribe gratuity, gift, loan, Perquisite, regard or advantage pecuniary or
otherwise shall either directly or indirectly be given promised or offered by the contractor any of
his servants, or agents, to any person in the employee of corporation in any way directly or
indirectly interested in the contract the Executive Engineer may give 10 days notice in
writing and rescind the contract. In the event of a contract being rescinded the security
deposit of the contractor shall there upon stand forfeited and be absolutely at the discretion of
corporation and the same consequences shall ensure as if the contract has been -rescinded
under Clause 4 thereof and in addition the contractor shall not be entitled to recover or be paid
for any work thereof actually performed under the contract.
25. Compensation .
All sums payable by a contractor by way of compensation under any of these conditions shall be
considered as a reasonable compensation to be applied to the use of corporation without
reference to the actual loss or damage sustained and Whether any damage has not been
26. Changes In the Constitution of Firm to be notified.
In the case of tender by partners of a firm any change in the constitution of firm shall be
forthwith notified by the contractor to the Executive Engineer for his information.
27. Works under direction of Superintending Engineer.
All works be executed under the contract shall be executed under the direction and subject to
the approval of the Superintending Engineer of the Circle for the time being who shall be entitled
to direct at what point or points and in what manner they are to be commenced and from time
to time carried on.
28. Decision of superintending Engineer to be final.
Except where otherwise specified in contract and subject to the power delegated to him by
corporation under the corporation , then in force the decision of the Superintending Engineer of
the Circle for the time being shall be final conclusive and binding on all parties of the contract
upon all questions relating to the meaning for the specification, designs drawings and
EW- 348 PUR-F-006 RFQ-
instruction herein before mentioned and as to the quality of workmanship or material used on
the work or as to any other question, claim right matter or thing whatsoever in any way arising
or relating to the contract. designs, drawing specification estimates instructions orders or these
conditions or otherwise concerning, the works or the execution or failure to execute the same
whether arising during progress of the work or after the completion on abandonment thereof.
29. Stores to be obtained from corporation
The contractor shall obtained from the corporation stores, such stores and articles as are
mentioned schedule A which may be required for the work or any part of the work or in making
up any articles required therefore or in connection therewith unless he has obtained permission
in writing from the Executive Engineer or obtained such stores and articles from elsewhere.
The value of such stores & articles as may be supplied to the contractor by the Engineer-in-
charge will be debited to the contractor his account at the rate shown in the schedule A attached
to the contract and if they are not entered said schedule, they shall be debited to him at cost
price which for the purposes of this contract shall include cost of carriage and all other expenses
whatsoever which may have to be incurred in obtaining delivery of the same at the stores
aforesaid and further overhead charges 15%. The contractor shall be responsible for the loss
destruction or deterioration of the materials, stores or articles supplied to him by the
corporation even if such loss destruction or deterioration has occurred under any articles so
supplied were his property. The contractor shall be responsible for returning the residual
materials after completion of the contract and if fails to return the balance materials supplied to
him by the corporation the cost of the of the residual materials will be recovered form the
contractor at the market rate or stock issue rate whichever is higher at the time of materials
account plus 15%.
30. Lump Sum in Estimate.
(1) When the estimate on which tender is made includes lump sums in respect of parts of the
works contractor shall be entitled to payment in respect of the items or works involved or the
part of work in question at the same rates as are payable under this contract or such items of
the part the work in question is not in the opinion of the Engineer-in-charge capable of
measurement Engineer-in-charge and the certificate in writing of the Engineer-in-charge shall
be final & conclusive against the contractor with regard to any sum or sums payable to him
under provision of this clause.
Lump sum Tenders
(2) Whenever lump sum tenders have been invited for buildings or other structures of the same
type, design, the contractor shall submit his bill stated in Clause II and the Engineer-in-charge
not below the rank of Executive Engineer shall certify by general measurement or by other
method considered suitable to him, the value of work done and the contractor shall be paid
monthly a sum equal to. 90% of the total value the work so certified since the last payment after
deducting a part or whole of the secured advance if not already paid for the materials utilized on
the works. An additional secured advance for any fresh materials brought on site will also be
paid if certified by the office not below the rank of Executive Engineer.
After the work is completed final bill would be paid on the certification of an officer not below the
rank of Executive Engineer, that the works are done according to drawing and specifications
attached to the tender if any additions and alteration have been carried out, details
measurement in respect thereof shall be recorded and extra payment of deductions are
regulated as per item rates quoted by the contractor while submitting the tender and if there are
any items in the additions and alteration for which the contractor has not quoted a rate, the
payment shall be regulated as per clause 14 above.
31. Action Where no Specification.
In the case of any class of work for which there is no such specification as is mentioned in rule I
such work shall be carried out in accordance with the divisional specifications and in the event
of absence of divisional specification the work shall be carried out in all respect in accordance
with the instructions and requirement of the Engineer-in-charge.
32. Compensation under Workmen’s Compensation Act.
The contractor shall be responsible for and shall pay any compensation to his workmen payable
under the workmen’s Compensation Act 1923 (VIII of 1923) (herein after called the said Act) for
injuries caused, to the workmen. If such compensation is paid by corporation as principal under
sub-section (1) of Section 12 of the said Act on behalf of the contractor, it shall be recoverable
by Corporation from the contract or under sub-section (2) of the said section. The contractor
shall pay such amount of compensation on demand failing which it will be recovered from him
EW- 348 PUR-F-006 RFQ-
by deducting it from any sums that may be due or become due to the contractor by the
corporation under this contract or otherwise.
33. No claim for Variation in quantities of work
Quantities shown in the tender are approximate and no claim shall be entertained Quantities of
work executed being either more or less than those entered in the tender or estimate.
34. No claim for Compensation for Delay in execution of work
No compensation shall be allowed for any delay caused into starting of work on account of
acquisition of land and in the case of clearance works for any delay in according to sanction
35. No claim for Compensation for delay in execution of work
No compensation shall be allowed for any delay in execution of the work on account of water
standing in borrow pits or compartment, the rates are inclusive for hard or cracked soil,
excavation in mud, subsoil water or water standing in borrow pits and no claim for an extra rate
shall be entertained unless otherwise expressly specified.
36. Entering upon or commencing any portion of work
The contractors shall not enter upon or commence any portion of work except with the written
authority any instructions of the Executive Engineer or his subordinate in charge of the work
fail in such authority the contractor shall have no claim to ask for measurement of payment for
37. Method of Payment
Payment to contractors shall be made by cheques provided the amount exceeds Rs. 10/-
Amount not exceedingRs. 10/- will be paid in cash.
38. ACCEPTANCE OF CONDITIONS OF TENDERING FOR WORK
Submission to tender or acceptance of work order shall imply acceptance of those conditions of
tender by contractor.
39. Employment of Scarcity Labor
If Government declares a state of scarcity of famine to exist in any village situated within
miles of the work the piece worker/contractor shall employ upon such parts of the work as are
suitable for unskilled labor any person certified to him by the Executive Engineer or by any
person to whom Executive Engineer may have delegated this duty in writing to be in need of
relief and shall be bound to pay such person wage not below the minimum which Government
may have fixed in this behalf. Any disputes which arise in connection with the implementation of
this clause shall be decided by the Superintending Engineer whose decision shall be final and
binding on the piece worker/contractor
40 Employment of Technical Persons.
The contractors who are registered class ‘A’, ‘B’ and ‘C’ or such contractors who execute the
works of Rs. 5 lakhs and above shall employ the technically qualified personnel possessing
minimum a Diploma from a recognized Technical Institution executing the work of the
Chief Engineer (G)
GSECL: Gandhinagar TPS
Dated seal & signature of
Bidder/Contractor
EW- 348 PUR-F-006 RFQ-
COMPULSORY UNDERTAKING OF BIDDER REGARDING QUALITY OF PPEs
(PERSONNEL PROTECTIVE EQUIPMENTS)
Ref.: Tender no.: ____________
Authorized signatory of M/s____________________________________
Hereby certify that following mentioned PPEs (as per ISI/DGMS/CE/EN/ANSI approved
only) must be issued to our all contract workers as per nature of hazards before
execution of work.
Sr. Name of PPE IS :Code no. of Make of Qty Unit
1 Safety Helmet IS:2925 Nos.
2 Safety goggles with IS:5983:1980 Nos.
Anti fog lens or EN:166
3 Reusable Ear Plug ANSI S3.19- Pair
4 Dust Mask EN149:2001 Nos.
5 Safety Shoes IS:15298 Pair
6 Cur resistance Hand EN 388:2003 Pair
gloves Cut level-1
If our company is not provided above mentioned good quality of PPE’s, Safety Officer and
Factory manager shall be empowered to stop the work without any notice.
Seal of the Firm Signature of Authorized signatory
EW- 348 PUR-F-006 RFQ-
ANNEXURE-II: SOP/JOB SAFETY ANALYSIS
Name of Job analyzed:
Tender No. /Work order No.
Name of Agency: Mobile No.
Name of Supervisor: Mobile No.
Name of Section/Department:
Job Location/Area:
Required PPEs and Emergency equipment :(1) Safety Helmet (2) Safety Shoes (3) Safety
Goggles (4) Reusable ear plug (5) Cut resistance hand gloves (6) Dust mask
Job Step Hazard Risk Level Control Measures Responsibility
Prepared by Checked By Approved By
DE / EE Safety Chief
SE ( ) Factory Manager
( ) Officer Engineer
EW- 348 PUR-F-006 RFQ-
GSECL Contractor EH&S Performance Evaluation Form
Name of Contract Agency:
Contract work order No.
Date Evaluation Completed:
Work Description:
Name of Power Station:
Status of Work/ Project: _________% completed.
No. of person engaged during work contract:
Total Exposure hours worked on work order:
This evaluation must be completed by Concern EE & SE after completion of the Work
Contract /project and at pre-determined intervals (three months) as agreed upon at the
Pre-Job Mobilization Meeting.
Statistics Number Frequency
Environmental Excursions
Traffic Violations
The following categories should be rated for the Contractor’s overall performance
on the work order/ Project.
RATING (5 = Excellent; 4=Very Good 5 4 3 2
3=Good 2=Satisfactory 1 = Poor)
A. Adherence to Requirements:
Adherence to contract provisions for new
hire orientation.
Compliance to plant safety rules.
Compliance with industrial hygiene
Compliance with site contractor’s health and
safety guidelines.
Compliance with site permits.
Material Safety Data Sheets (MSDS)
Response to safety requests.
B. Housekeeping
Monthly housekeeping inspection results.
Overall site housekeeping practices.
Response to safety requests.
Chemical hazard control
Fire control measures
Flammable and explosive materials control
General waste – trash collection
EW- 348 PUR-F-006 RFQ-
C. Injury Performance:
Contractor’s timely reporting of accidents
Contractor’s use of modified work program.
Contractor’s participation in accident
investigations.
Number of incidents observed and reported.
D. Contractor Safety Program:
On site safety officer.
All subcontractors employed by the
Contractor have been managed effectively
with reference to EHS and Quality (meets
company standards, practices and/or
Safety training for supervisors.
Substance abuse policy compliance.
Weekly toolbox meeting and/or participation.
Updates to written safety programs.
E. Tools and Equipment:
Availability of tools and equipment
Condition of contractor’s tools and
equipment by site and provincial Labour and
OH&S standards.
Maintenance of Equipment / Tools / etc.
Contractor’s knowledge and proper use of
Contractor’s equipment certification readily
Contractor’s materials
inspection/acceptance program followed.
F. Costs Within Expectations:
Contractor’s cost program.
Contractor’s reasonableness and/or
G. Execution of Work:
Contractor’s cooperation in handling change
Contractor’s efforts to eliminate
nonproductive time.
Contractor’s planning of work.
Relationship with other site contractors.
Contractor’s cooperation with our company
and other contractor personnel.
H. Key Field Personnel:
Competence of main office staff and
Quality of first and second line supervision.
J. Labour Relations:
Contractor’s ability to anticipate problems.
Contractor’s efforts in exercising
management rights.
Contractor’s relationship with the building
EW- 348 PUR-F-006 RFQ-
K. Project management /Supervision:
Contractor’s efforts to use efficient crew size.
Control of subcontractors.
L. Quality of Craft Labour :
Contractor’s ability to obtain qualified
Quality of work.
Contractor’s adherence to schedule
N. Quality Control/Assurance:
Contractor’s equipment certification readily
Contractor’s material inspection /
acceptance program followed.
Contractor meets expectations on quality
O. Issues and Concerns:
Advises of potential problems.
Efficiency in handling paperwork.
Readiness to accept responsibility.
Reliability in dealings.
Response to site requests for action by the
supervisor/ management.
OVERALL PERFORMANCE:
Any specific issues or concerns with the contractor:
Would you hire this contractor again to do similar work:
How can this contractor improve on its past performance:
Evaluation carried out By:
Designation Executive Engineer Superintending Safety Officer
Date Completed:
EW- 348 PUR-F-006 RFQ-
Work Agreement Format
STAMP PAPER OF RS. 300/-
This agreement is made at Gandhinagar the ___ day of ________________in the Christian
year two thousand and fourteen between M/s
CONTRACTOR” which expression shall unless excluded by or repugnant to the context
include its successors or permitted assigns)of the one part and the Gujarat State
Electricity Corporation Ltd., having their Head office at Race course Baroda -7
(hereinafter called “GSECL” which expression shall unless excluded by or repugnant to
the context include- its successors or assigns) of the other part.
WHEREAS the aforesaid GSECL has accepted the tender of the aforesaid contractors for
work ______________________________________at GTPS as per GSECL’s order
_________________________________dtd.___________ hereinafter called ”The works” and more
particularly described enumerated or referred to in the specification, terms and
conditions prescribed in the order letter, covering letter and other letters and schedule of
price which for the purpose of identification have been signed by Shri
____________________________________ On behalf of the contractors and by Chief Engineer
(Gen.) on behalf of GSECL a list where of is made out in the schedule hereunder written
and all of which said documents are deemed to form part of this contract and included in
the expression “THE WORKS” wherever herein used, upon the terms and subject to the
conditions herein after mentioned.
AND WHEREAS GSECL has accepted the tender of the contractors for the
construction/work, of the said works for the sum Rs.___________________(Rupees
________________________only) upon the terms and subject to the conditions herein
NOW THIS AGREEMENT WITNESS AND IT IS HEREBY AGREED AND DECLARED THAT:
1. The contractors shall do and perform all works and things in this contract
mentioned and described or which are implied therein or thereof from respectively or are
reasonably necessary for the work as mentioned and at the times, in the manner and
subject to the terms condition s and stipulations contained in this contract, and in
consideration of the due provision, executions, work/ construction and completion of the;
works agreed to by the contractors as aforesaid, GSECL both hereby convenant with the
contractor to pay all the sums of moneys as and when they become due and payable to
the contractor under the provisions of the contract Such payments to be made at such
times and in such manner as is provided by the contract.
2. This conditions and convenants stipulated herein before in this contract are subject
to and without prejudice to the rights of GSECL to enforce penalty for delays and/or any
other rights what so ever including the right to reject and cancel on default or breach by
the contractors of the conditions and the covenants as stipulated in the general
conditions, specifications, forms or tender, schedule drawing etc. attached with GSECL’s
3. The contract value, extent of supply delivery dates, specifications and other relevant
matters may be altered by mutual agreement and if so altered shall not be deemed or
constructed to means or apply to affect or alter other terms and conditions of the contract
and the general conditions and the contract so altered or revised shall be and shall
always be deemed to have been subject to and without prejudice to said stipulation.
EW- 348 PUR-F-006 RFQ-
List of documents forming part of the contract :-
1. Original tender
3. Tender & contract for works booklet.
4. General specifications for civil works book.
In witness whereof the parties hereto have set their hands and seals this day,
month and year first above written.
1. Signed, Sealed and delivered by (Contractor)
(Signature with Name, Designation & official seal / stamp)
For and on behalf of M/s. _________________________________________ (Contractor)
(Complete Name, Address of the authorised person of the Supplier with
Authority letter or Board’s Resolution in case of company)
In the presence of Name, full Address & Signatures:
2. Signed, Sealed and Delivered by (Purchaser-GSECL):
EW- 348 PUR-F-006 RFQ-
(Signature with Name, Designation & official seal / stamp)
For and on behalf of ____________________________________________ (Purchaser-
(Complete Name, Designation & Location / Address of the authorized officer
as per DOP of the Purchaser Company)
In the presence of Name, full Address & Signatures:
EW- 348 PUR-F-006 RFQ-
GUJARAT STATE ELECTRICITY CORPORATION LIMITED
Gandhinagar Thermal Power Station, Gandhinagar, India–382041.
e-mail: [email protected] ; Website: www.gsecl.in
CIN:U40100GJ1993SGCO19988
(Price Bid should be submitted by bidders directly online. Bidder should not submit
physical Price Bid.)
Work of cleaning, maintenance and overhauling of various types of
EW- 348 6.6 KV HT Panel, LT MCC and charger panel during COH/AOH/
Shutdown of Unit 3, 4, 5 at GTPS.
Offered GST Unit
Rate Applicabl Rate
SAC/ per Unit e With GST
Sr. Qty. Amount Amount
Description UOM HSN in Rs. [in in Rs.
Code Withou Percenta (D)
t Tax ge %] =(B)+
1 maintenance of 6.6 KV 6 JOB
US Bus of Unit-3/4/
maintenance of 6.6 KV
Station Bus of Unit-3/4/
3 maintenance of 415 V 3 JOB
SSS Bus of Unit-3/4/
4 maintenance of 415 V 3 JOB
USS Bus of Unit-3/4/
maintenance of 415 V
Emergency Bus of Unit- To be quoted in attached Price break up
Cleaning, washing &
power connection
6 tightness of UST & SST 6 JOB
Transformer of Unit-3/4/
Cleaning & maintenance
of 1- Phase/ 3- Phase
Transformer of Unit-
Cleaning & maintenance
8 of 1- Phase/ 3- Phase 12 JOB
ACDB of Unit-3/4/5
Cleaning & maintenance
of 220V DCDB of Unit-
EW- 348 PUR-F-006 RFQ-
3/4/5 during AOH/COH/
Shutdown period
Cleaning & maintenance
of 26V DCDB of Unit-
3/4/5 during AOH/COH/
Shutdown period
Cleaning & maintenance
of Battery Charger of
11 Unit-3/4/5 during 16 JOB
AOH/COH/ Shutdown
Cleaning & maintenance
of UPS Charger and UPS
12 ACDB of Unit-3/4/5 3 JOB
during AOH/COH/
Shutdown period
(1) Goods and service tax:- The GST rate will be paid extra as applicable in accordance
with GST rules party shall have to raise the invoice in duplicate as per GST rules. The
supplier/contractor should mention separate HSN/SAC code and rate of GST and cess
as applicable for each item of goods/services. If no specifically mentioned then company
will have option to take the prices as exclusive of taxes and duties at maximum higher
slab rates for the evaluation of tenders.
(2) Payment Terms: Party has to accept payment terms as per GSECL rules only i.e. as per
actual work done. NO ADVANCE payment will be allowed.Net Payment will be released
within 30 days after completion of work and submitting their relevant invoices.
(3) L1 is considered on over all lowest quoted party.
(4) Quantity mentioned is tentative; however payment will be done as per actual executed
(5) GST No. & SAC/HSN Code must be required in Bill/Invoice.
Chief Engineer (Gen)
Contractor’s Signature
With Seal & Date
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GTPS_Tender _ EW-348_15_09_2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .