Tender Value
Refer Docs
EMD Value
₹58,050
Closing Date
4 Jul 2023, 5:00 pmClosed
Superitending Engineer
Superintending Engineer, Mechanical Circle, UPJN, Haldwani
Construction of 01 No 200 mm dia 80 mtr deep Tubewell and SITC of Solar pumping plant for Chukkum peyjal yojna in Vikas khand Ramnagar of distt Nainital under jal jeevan mission programme
2023_MDPEY_60182_1
910 / G-7 / 42 Dated 21-06-2023
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
360 days
Haldwani
Please refer tender documents
3 documents required · 3 mandatory
₹2,360
Executive Engineer, Mechanical Division. UPJN, Hal
₹58,050
Haldwani
20 Jun 2025
24 Jun 2023
6 Jul 2023
24 Jun 2023
4 Jul 2023
28 Jun 2023
27 Jun 2023
Amount
Construction of 200 mm dia 80 Meter deep Mini Tube well by ODEX Rig Machine to get total yield of 200 LPM from Mini Tubewell.
JOB WORKS:
Transportation of suitable truck mounted ODEX/DTH drilling Rig Machine with compressor, O.P. Unit and other T&P, Tripod, Diesel driven generator set and related accessories up to site Chukkum mini Tubewell water supply scheme and back upto destination after completion of work.
Drilling of bores as per IS 2800-1970 using odex 236 (tubex) attachment required drilling complete in all respect with sinking of following size M.S.E.R.W. fincut casing plain/ Perforated pipe. (i) 200mm dia M.S.E.R.W. fincut pipe from G.L. 80Mt.BGL.
(iii)125mm dia DTH bore
Flushing of tubewell by 350 PSI & 1100 CFM air compressor including transpotation, installation and dismantling of compressor at site after completion of work with all T&P etc.
Dismantling of Rig machine after completion of work. Fitting of well cap.
MATERIAL:
Supply of 200mm dia M.S.E.R.W. fincut pipe 7.1mm thick plain pipe as per IS 1239/ 4270 with tolerance as per manufacturer norms in the normal length of 3.00m each.
Supply of 200mm dia M.S.E.R.W. fincut pipe 7.1mm thick Perforated pipe as per IS 1239/ 4270 with tolerance as per manufacturer norms in the normal length of 3.00m each.
Supply and fixing of suitable casing shoe of EN-24 steel as per odex attachment of 200mm dia.
Supply of 200mm dia M.S. well cap.
Development by O.P. Unit
Installation and Lowering of submersible O.P. unit with 80mm dia M.S. column pipe with accessories as per required depth complete with power wiring and .
Development of tubewell by submersible O.P. unit of 250 LPM, 100mt. head to get required sand free discharge of 250LPM by diesel driven generator set (Including labour diesel, lubricants etc.)
Dismantling of O.P. unit after development with site clearance etc.
Chemical/ Bacteriological test of water sample
Hydro-geological Survey of site
S.I.T.C. of Solar Submersible Pumping Plant with Accessories for Tubewell
Supply of submerisble solar A.C/D.C pump with adequate capacitysuitable for 200mm dia Assembly , motor complete with 1.0 Meter cable complete in all respects for 54000LPD /150LPM at 65Mtr Head, 5 HP.
Supply of Spare pump of same duty cycle
Supply of solar hybrid pump controller (Control panel cum starter) suitable for above pump- motor set also suitable for on grid supply as per following parameters . (i)Inbuilt MPPT Tracking facility ensuring overload under over voltage protection force air time of lack of radiation (ii) Parameter display facilities (iii) Auto reset after every fault (iv) Dry running protection to avoid dry run of motor
Solar photo voltage poly crystalline solar module 4800wt. Minimum As per IEC standrard (for above pump) including Chain link/wire mesh fencing system of suitable size to protect solar PV module system From unathorized intrusion.
Supply of main piping & valves as per scope of work and technical specifications
Tools
Construction RCC Foundation with suitable foundation Nut, Bolts and Supply & fitting of G.I. Solar Panel mounting structure including panel mounting clamp, pole etc complete in all respect.
Installation, commissioning and setting to work and testing of entire equipment installed at site including supply of necessary fixing accessories like insulation, teflon tape etc.
4sq.mm x 3 core copper flexible cable
Chain Pulley block of 2 tonne capacity 4Mt. Lift.
Rubber insulation sheet 1 Mt. x 2Mt.x 0.025Mt
Lightening arrestor, Copper strip, Earth kit and Chemical earthing as per latest IE rules has to be provided for Cathodes and rest as per normal GI earth strips from cathode to different equipments
Internal & External Electrification of pump house for Proposed Tubewell
One month Trial Running & Five month operation, Maintenance including watch & ward.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .