Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹27.6 L
EMD Value
₹28,000
Closing Date
1 Aug 2025, 3:00 pmClosed
Block Development officer BP
Block Development office Thiruverumbur
Construction of Drainage with Culvert 2 no in Keelakurichi Panchyat
2025_RDTN_587390_1
B2/1146/2023
Open Tender
Civil Works
Item Rate
180 days
Thiruverumbur
Refer the tenter notice
4 documents required · 4 mandatory
₹0
₹28,000
Yes
4 Aug 2025
31 Jul 2025
1 Aug 2025
31 Jul 2025
1 Aug 2025
31 Jul 2025
Amount
Construction of Drainage at Fancy nagar 1st street from selvam maligai store to SM house in Keelakuruchi panchayat Earth work excavation in all classes of soils except hard ock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc. complete for foundation.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges. etc., complete.
Centering & shuttering including cost and conveyance of all materials to site and all labour charges etc
cement concrete1:3:6 mix using 20 mm ISS HBG metal and conveyance of all materials to site and all labour charges etc complete -10 cum
Plastering with cement mortar 1:4 mix to 20 mm thick including
Provision for name board
Construction of Drainage with culvert at Nathamadipatti Edward tea stall to Attu-palam in Keelakuruchi panchayat Earth work excavation in all classes of soils except hard ock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc. complete for foundation.
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges. etc., complete.
Centering & shuttering including cost and conveyance of all materials to site and all labour charges etc
Culvert vent
cement concrete1:3:6 mix using 40mm ISS HBG metal and conveyance of all materials to site and all labour charges etc complete -10 cum
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Reinforce cement concrete 1:1 1/2: 3 using 20mm gauge machine broken hard granite stone jelly for all RCC items of works excluding cost of reinforcement and fabricating charges but including curing including all labour charges etc., complete for DECK SLAB.
Supplying faricating and placing in position mild steel or ribbed tor steel for reinforced cement concrete works standard specification (MS rodsd or RTS bars will be supplied departmentally at section stores and cost will be recovered at issue rate ). The Contractor shall supply the binding wire.
Provision for name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VG CONSTRUCTION (BID ID -1417457)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .