| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.8 LAccepted-AOC | ₹36.8 L | L1 | Accepted-AOC Being lowest quoted bidder i.e. L1 |
| 2 | L2₹39.2 LRejected-Finance | ₹39.2 L | L2 | Rejected-Finance L2 |
| 3 | L3₹40.2 LRejected-Finance SAINTAIA BALANGIR 767032 ODISHA | BALANGIR | BALANGIR | ODISHA | 767032 | ₹40.2 L | L3 | Rejected-Finance L3 |
| 4 | L4₹40.3 LRejected-Finance BADMAL BALANGIR ODISHA 767070 | BALANGIR | ODISHA | 767070 | ₹40.3 L | L4 | Rejected-Finance L4 |
| 5 | L5₹41.3 LRejected-Finance | ₹41.3 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | LABENDRA BEHERA L1 | RAJESH KUMAR PATRA L4 | BHAWANI SHANKAR BEHERA L3 | M/S ASHISH KUMAR THATI L6 | GANESH CHANDRA BEHERA L5 | Rajkumar Behera L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Periodical services to the buildings of Ordnance Factory Hospital, Badmal | |||||||||
| 1.01 | M & L for cutting chases, pinning in. making good to facings where required and pointing in cement mortar 1:3 to wall cracks.(Cutting not exc 10 cm girth). | 100 | RM | 50 ₹5,000 | 55 ₹5,500 | 105.8 ₹10,580 | 105.8 ₹10,580 | 56.5 ₹5,650.40 | 49 ₹4,900 |
| 1.02 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. and rendering 15mm thick cement plaster (1:4) on fair faces of brick work or concrete sur faces | 100 | Sqm | 358 ₹35,800 | 390 ₹39,000 | 300.2 ₹30,020 | 300.2 ₹30,020 | 401.03 ₹40,102.70 | 223.37 ₹22,337 |
| 1.03 | Preparation of old painted plastered surfaces by brushing with steel wire brush and scraping down all loose dirt, dust, paint etc. and applying two coats of plastic emulsion paint on wall & celing as per the direction of Engineer-In-Charge. | 4,717.81 | Sqm | 118 ₹5.6 L | 129 ₹6.1 L | 45.5 ₹2.1 L | 66.5 ₹3.1 L | 132.5 ₹6.3 L | 206 ₹9.7 L |
| 1.04 | Preparation of old painted plastered surfaces by brushing with steel wire brush and scraping down all loose dirt, dust, paint etc. and applying two coats of oil bound distemper on wall as per the direction of Engineer-In-Charge. | 8,259.13 | Sqm | 68 ₹5.6 L | 74 ₹6.1 L | 101.3 ₹8.4 L | 101.3 ₹8.4 L | 76.38 ₹6.3 L | 85 ₹7.0 L |
| 1.05 | Preparation of old painted plastered surfaces by brushing with steel wire brush and scraping down all loose dirt, dust, paint etc. and applying two coats of oil bound distemper on ceiling as per the direction of Engineer-In-Charge. | 4,049.03 | Sqm | 83 ₹3.4 L | 90 ₹3.6 L | 130.5 ₹5.3 L | 130.5 ₹5.3 L | 92.74 ₹3.8 L | 78 ₹3.2 L |
| 1.06 | Preparation of old wood and wood based surfaces and applying two coat of synthetic enamel paint over a coat of pink primer. | 2,798.23 | Sqm | 112 ₹3.1 L | 122 ₹3.4 L | 150.2 ₹4.2 L | 150.2 ₹4.2 L | 124.88 ₹3.5 L | 140 ₹3.9 L |
| 1.07 | Material & labour for preparation of old painted steel surfaces of any description, over 10cm in width or girth, not otherwise described and applying two coat of synthetic enamel paint over a coat of red oxide zinc chrome primer. | 729.03 | Sqm | 120 ₹87,483.60 | 131 ₹95,502.93 | 150.5 ₹1.1 L | 150.5 ₹1.1 L | 134.51 ₹98,063.28 | 132 ₹96,231.96 |
| 1.08 | M & L, for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces. | 12,345.26 | Sqm | 137 ₹16.9 L | 151 ₹18.6 L | 144.2 ₹17.8 L | 144.2 ₹17.8 L | 154.68 ₹19.1 L | 106 ₹13.1 L |
| 1.09 | Material & labour for preparation of old painted steel surfaces of any description, over 10cm in width or girth, not otherwise described and applying two coat of aluminium paint over a coat of aluminium red oxide primer. | 400 | Sqm | 100 ₹40,000 | 109 ₹43,600 | 77.5 ₹31,000 | 77.5 ₹31,000 | 112.34 ₹44,936 | 130 ₹52,000 |
Tender Value
₹36.9 L
EMD Value
₹74,000
Closing Date
6 Apr 2026, 2:00 pmClosed
CGM, O F Badmal, Balangir, Odisha
OFFICE OF THE CHIEF GENERAL MANAGER, AT-BADMAL TOWNSHIP, PO-BADMAL, DIST-BALANGIR
Periodical services to the buildings of Ordnance Factory Hospital, Badmal.
2026_MIL_270315_1
3012/OFBL/TE-41-2025-26/RD2540
Open Tender
Civil Works
120 days
Ordnance Factory Badmal
As per NIT eligibility/evaluation criteria along with EMD
3 documents required · 3 mandatory
₹0
₹74,000
2 Jun 2026
10 Mar 2026
9 Apr 2026
10 Mar 2026
6 Apr 2026
10 Mar 2026
Name of the Bidder
INSTRUCTION TO TENDERERS
Sl.No. CLAUSE SUB-CLAUSE / DECSRIPTION COMPLIANCE SELECT
1 Submission of Tenders and Access to CPP Portal. The Chief General Manager, Ordnance Factory Badmal (A Unit of Munitions India Limited, Pune) invites sealed quotations in electronic form under the two bid system (technical/eligibility bid and price bid) for the Civil/Electrical work (the detailed Scope of Work is available on website https://etenders.gov.in Interested contractors fulfilling the eligibility criteria to submit e-offer online in the website. Only electronic submission of offer in this website will be valid. The copies of the Documents including EMD sought shall be attached as scanned copies in e-procurement system. All corrigendums will be available in this web site only. New vendors are requested to obtain class III Digital Signature Certificate (DSC) with the company name from any certifying authority licensed by controller of certifying authority. The vendors are also required to get themselves enrolled on CPP Portal e-procurement website by using the DSC, as per instruction available on the website. Vendors should also have valid email address on this website. The DSC for both component (Signing and Encryption) is required to access the CPP Portal e-procurement website.) SELECT YES
2 Modification and Withdrawal of Bids No bid shall be modified after the deadline for submission of bids. No bid shall be withdrawn in the interval between the deadline for submission of bids and within the period of bid validity specified. Withdrawal or modification of bid during this period will result in forfeiture of Earnest Money Deposit and imposition of penalty as deemed fit. SELECT NO
3 Respond No. Vendors are advised to note/record their Respond No. and also quoted rates in Price Bid for reference. SELECT
4 Validity of Tender The period of validity of tender shall be minimum 120 days from the date of Technical Bid opening and the prices quoted shall be deemed to remain valid for this period. Tender documents are strictly non-transferable i.e. offer can be submitted only by the tenderers to whom tender documents have been issued. Offers submitted by others will be ignored. SELECT
5 Submission of EMD EMD to be submitted in the form of Fixed Deposit Receipt in the name of MUNITIONS INDIA LIMITED_ORDNANCE FACTORY BADMAL payable at SBI Badmal, Branch Code SBIN0008703 with minimum validity of three Months. EMD amount payable is mentioned in NIT. The vendors must write the tender No. on the reverse of FDR for EMD. SELECT
6 EMD hard copy submission of The SEALED envelope containing EMD in Original in the form of Fixed Deposit Receipt from any Nationalised Bank or ICICI/HDFC/AXIS Bank should be reached physically at OFBL either by post or by hand and should be deposited/dropped at EO tender box kept at Admin Gate of O.F. BADMAL. The envelope clearly super scripting the Name of Work, TE No and Name of the Contractor should be dropped on or before bid opening date & time failing which bid will be summarily rejected. N.B.:The size of sealed envelope containing EMD and documents related to EMD should be such that it can be dropped/inserted in the slot of the Tender Box. The size of the slot of the tender box is (220 x 20) mm. SELECT
7 Late/Delayed Tender Sealed envelope containing Earnest Money Deposit (EMD), if received after bid opening date & time fixed will be assumed as Late/ Delayed Offer and will not be considered. However for the tenderers who dispatched the original EMD through Post/ Courier, the date of receipt of original EMD at OFBL will be 10 days from the bid closing date provided that the tenderer has uploaded scanned copy of postal/courier receipt along with the scanned copy of EMD, while submitting the technical bid SELECT
8 Corrigendum All corrigendum's will be available only on this website i.e. https://etenders.gov.in SELECT
9 Opening of Price bid The Price Bid will be opened of those tenderers who meet the evaluation criteria as mentioned in NIT. Price Bid opening date & time will be intimated to the technically qualified vendors through system generated mail only. SELECT
10 Site Inspection The tenderer shall inspect the site if considered necessary and shall satisfy him-self of site conditions and shall collect himself any other information which he may require before submitting the tender. Claims and objections due to ignorance of site conditions will not be considered after submission of the tender. SELECT
11 Checking of specification & Drawing The tenderer shall carefully check the specifications and drawings and shall satisfy himself of the suitability of the work being offered before quoting and shall take full responsibility for the successful completion of the work within PDC. SELECT
12 Technical Specification The offer should confirm to technical specification and general conditions of contract. There may be changes/ deviations during actual execution of the works as per the requirement of OFBL. SELECT
13 PDC Time is the essence of this contract. Hence bidder will have to strictly adhere to the date of completion. The work is to be completed (as per time mentioned in NIT) (in accordance with the phasing, if any, indicated in the tender) from the date of placement/issue of Work Order. SELECT
14 Security Deposit The defect liability period/warranty period of the contract shall be 05 year from the completion of the work, Hence the contractor shall have to pay/lodge Security Deposit i.e. 5% of the value of the contract covering a period of FIVE (05) year from the date of completion of work in the form of FDR and the same will be retained with Factory authorities till completion of the warranty period. Firm has to submit Security Deposit within 30 days from the date of placement of order. The security deposit shall be pledged in name of Munitions India Limited_Ordnance Factory Badmal. The Security Deposit will be forfeited in the event of breach of contract by the contractor. SELECT
15 Queries/Clarifications Queries/Clarifications of all nature, if any that may arise should be referred by the tenderer through Letter/Email ([email protected]) direct to the signatory at the following Address: CHIEF GENERAL MANAGER, ORDNANCE FACTORY BADMAL, BALANGIR-767070. SELECT
16 Accept/Reject of Application/Tender CHIEF GENERAL MANAGER, O.F.BADMAL, RESERVES THE RIGHT TO ACCEPT/REJECT ANY OR ALL BIDS WITHOUT ASSIGNING ANY REASON AND ALSO RESERVES THE RIGHT TO CANCEL/DROP THE TENDER WITHOUT ASSIGNING ANY REASON. SELECT
17 Right of Acceptance of Offer The purchaser does not pledge to accept the lowest or any tender and reserves the right of acceptance of the whole or any part of the tender. SELECT
18 Verification of original documents Firm has to provide all the original documents for verification before signing the Contract Agreement. SELECT
19 Rejection of Bids Tender is liable to be ignored if complete information is not given therein or if the particulars and data (if any) asked for in the schedule to the tender, are not fully filled in. Conditional tenders will be rejected. Canvassing by the Bidder in any form, unsolicited letter and post-tender correction may invoke summary rejection with forfeiture of EMD and imposition of penalty as deemed fit. SELECT
20 Note to adhere Clause/Sub Clause All tenderers are requested to take special note of the above instruction and observe the same strictly. Non-adherence to any of the clauses/sub-clauses above is liable to disqualify the tenderer. SELECT
21 Capacity of the Tenderer Offers not furnishing adequate information’s in respect of evaluation criteria’s are liable for rejection. SELECT
22 Debar/Blacklist Firm has to confirm in firm's letter head that their firm is not debarred/Blacklisted from any Govt Department, PSU etc. as a contractor. SELECT
23 Awareness of Contract Condition Firm has to confirm that they have read and understand all the clauses, sub-clauses etc. as mentioned in the Tender Attachment, Instruction to tenderers, Standard conditions of Contract, Special Conditions of Contract etc. SELECT
24 Debarring/Blacklisting the Firm Firm has to confirm that all the information submitted in Evaluation Criteria & Vendor Attachment are true. For any False statement or Documents if came to notice at any stage, CGM/OFBL may take suitable action against any firm including cancellation of contract and debarring/Blacklisting the Firm. SELECT
25 Negotiation Bidders should quote the minimum price. There would be no negotiation except with L1, if found necessary. SELECT
Name of the Bidder
TECHNICAL SPECIFICATION
Sl.No. CLAUSE SUB-CLAUSE / DESCRIPTION COMPLIANCE SELECT
1 Standard Procedure All the works are to be carried out as per the Standard Procedure laid down in MES SSR 2009 Part-I. SELECT YES
2 Terms & Conditions All Terms and Conditions as per IAFW 2249 and its latest amended version are to be followed. SELECT NO
3.1 ERRATA TO THE MES GENERAL CONDITIONS OF CONTRACT IAFW-2249 & MES MANUAL ON CONTRACTS-2020 & ITS LATEST AMMENDED VERSION FOR USE AT ORDNANCE FACTORY BADMAL. Wherever “Military Engineer Services” appears: read “Ordnance Factory Badmal, Balangir”. SELECT
3.2 ...Continued from Clause No.3.1.... Wherever “Chief Engineer” appears: read “Chief General Manager”, Ordnance Factory Badmal, Balangir. SELECT
3.3 ...Continued from Clause No.3.1.... Wherever “Commander Works Engineer” appears: read “Chief General Manager”, Ordnance Factory Badmal, Balangir SELECT
3.4 ...Continued from Clause No.3.1.... Wherever “Garrison Engineer” appears: read “Chief General Manager”, Ordnance Factory Badmal, Balangir. SELECT
3.5 ...Continued from Clause No.3.1.... Wherever “Engineer-in-Charge” appears: read “Engineer-in-Charge” means qualified Engineers nominated by Chief General Manager on his behalf to supervise the work or part of the work. SELECT
4 Technical Rule for Tenderer (IAFW-2249) In the event of an order being placed on vendor in pursuance of the invitation to Tenders, the same will be governed by the General Conditions of Contract IAFW-2249 (Military Engineers Services) SELECT
5 General Conditions of Contract IAFW-2249 The contract would be governed by the Terms and Conditions as per the contract documents and General Conditions of the Contract IAFW 2249. SELECT
6 Deviation Limit The deviation limit shall be as per IAFW 2249 and subsequent amendments till date. SELECT
7 MES Manual on Contracts Contractor has to agree for all conditions laid down in "MES Manual on Contracts 2020 & its latest amended version". SELECT
8 Contractor's Supervision The contractor shall either himself supervise the execution of the contract or shall appoint a competent/qualified Agent approved by this office to act on his behalf. Refer Condition No.25 of IAFW-2249. SELECT
Name of the Bidder
STANDARD CONDITIONS OF CONTRACT
Sl.No. CLAUSE SUB-CLAUSE / DESCRIPTION COMPLIANCE SELECT
1 Law The Contract shall be considered and made in accordance with the laws of the Republic of India. The contract shall be governed by and interpreted in accordance with the laws of the Republic of India. SELECT YES
2 Effective Date of the Contract after Site Handover The contract shall come into effect on the date of signatures of both the parties on the contract after the site handover (Effective Date) and shall remain valid until the completion of the obligations of the parties under the contract. SELECT NO
3 RAR Bill RAR Bill payment will be made in stages as per the progress/value of work done based on the certificate/report rendered by the SIC, EIC & TE. The RAR bill shall be claimed by the contractor stating the progress of different activities. SELECT
4 Retention of Money Reserve money will be retained from the work done value as per IAFW 2249 and the same will be released at the time of final bill. SELECT
5 Final Payment Final payment will be made only after satisfactory completion of the work as per Contract Conditions & Specification and based on the certificate rendered by the SIC, EIC and TE. SELECT
6 Income Tax Income Tax shall be borne by the contractor. The contractor will be responsible to furnish Income Tax declaration and file returns with respective Income Tax Authorities as required under Indian Income Tax Act. SELECT
7 GST Goods & Service Tax (GST) and other Government taxes as applicable from time to time and which are all in force shall also be borne by the contractor and the quotation/offer shall be inclusive of all. It will be the duty of contractor to completely update him-self about prevailing taxes and rates and this office will not issue any certificate regarding taxes etc. The contractor should have valid Goods & Service Tax Identification No. (GSTIN) or Any other valid statutory registration as required by law. SELECT
8 Welfare Cess Welfare cess will be deducted from contractor's bill at the rate of 1% as per provision of B.O.C.W (Building & other Construction Workers) Act-1996 SELECT
9 Workmen’s Compensation Act The contractor himself will be responsible against all claims for death or injury caused to any person, whether workman or not while engaged in any process connected with the contractor’s work or for dues of any kind whatsoever, and the OFBL shall not be bound to defend any claim brought under Workmen’s Compensation Act, 1923 or payment of Wages Act 1936, or any other statutory Act or Law or revisions in force from time to time and applicable against said work. SELECT
10 Notices on behalf of the Department Notices and certificates on behalf of the department in connection with the contract may be given by duly authorized officer of the department whose name shall be previously communicated in writing to the contractor. SELECT
11 Other Conditions The contractor will have to take extra precaution that the production activities are not affected/hampered at any way. The contractor is required to work in close co-operation with departmental Staff & Officers engaged to supervise the work. That the contractor should not make damage to any of the factory property and if so done, the factory authorities will initiate for suitable deduction from bills due to him. SELECT
12 Minimum Wages Act and Bonus Act (a) The workers shall be paid as per the Minimum Wages Act 1948 and to be followed as per the notification issued from Ministry of Labour from time to time. (b) The contractor has to follow all the provision of payment of Bonus Act 1965. (c) Contractor has to produce self certificate of minimum wages paid to labourers. SELECT
13 Rectification of Defect Work The firm shall undertake to rectify any defect including replacement of defective parts resulting from faulty design, poor workmanship, bad materials etc. during the erection as well as within guarantee period on free of charge. The contractor shall give guarantee for satisfactory performance of the work for a period of at least 10 years for roof treatment. If any leakage/seepage found in the roof or any other defects then contractor has to rectify it at his own expenses within the guarantee period specified. SELECT
14 Water & Electricity charges Water & electricity will be supplied by O.F.Badmal at the prescribed / prevailing charges and the same will be deducted from the contractor's Bill. Water will be charged @ 5.00 per Rs. 1000/- worth of value of work done of the contract. Electricity charges given by PS Section may be deposited in the account: Munitions India Limited_Ordnance Factory Badmal and submit the acknowledgement. SELECT
15 Compensation for delay Compensation for delay in completion of the work / Liquidated damage clause is accepted. Compensation for delay if the contractor fails to complete the work in all respect on or before the date fixed for completion, he shall without prejudice to any other right or remedy of Govt. on account of such breach be liable to pay compensation as per Condition No.50 of IAFW 2249. SELECT
16 Arbitration All disputes and difference arising out of or in any way touching or concerning the contract shall be referred to the Sole Arbitrator appointed by CMD, Munitions India Limited (MIL) and there should not be any objection to any such appointment that the Arbitrator so appointed is a Govt. Servant. The Sole Arbitrator may from time to time with the consent of the parties enlarge the time for making and publishing the award save as aforesaid as per rule. The award of the Sole Arbitrator so appointed by The CMD, Munitions India Limited (MIL) shall be final and binding on the parties to this agreement, subject as aforesaid, the Arbitration Act, 1940 and the rules thereunder and any statutory modifications thereof for the time being in force shall be deemed to apply to the arbitration proceedings. The venue of the arbitration shall be at O.F.Badmal, Dist: Balangir. SELECT
17 Dispute All disputes are subjected to Titilagarh Jurisdiction. SELECT
18 Cancellation of Contract in part or in full for contractor’s default .......Continued to Clause No.19.2...... If the Contractor: Makes default in commencing the Works within a reasonable time from the date of the handing over the site, and continues in that state after a reasonable notice from factory Or In the opinion of the CFA at any time, whether before or after the date or extended date for completion, makes default in proceeding with the Works, with due diligence and continues in that state after a reasonable notice from factory. Or Fails to comply with any of the terms and conditions of the Contract, or after reasonable notice in writing with orders properly issued thereunder, Or Fails to complete the Works, Work order and items of Works, with individual dates for completion and clear the Site on or before the date of completion. The CFA may, without prejudice to any other right or remedy which shall have accrued or shall accrue thereafter to Ordnance Factories/ units, cancel the Contract as a whole or only such Work Order(s) or items of Work in default from the Contract. Whenever the CFA exercises his authority to cancel the Contract as a whole or in part under this Condition he may complete the Work by any means at Contractors risk and cost, provided always that in the event of cost of completion or after alternative arrangements have been finalized by the Ordnance Factories/ units to get the Works completed, estimated cost of completion (as certified by SIC and EIC) being less than the Contract cost, the advantage shall accrue to the Ordnance Factories/ units. .......Continued to Clause No.19.2...... SELECT
19 .......Continued from Clause No. 19.1....... Cancellation of Contract in part or in full for contractor’s default .......Continued from Clause No.19.1....... If the cost of completion or after alternative arrangements have been finalized by the Ordnance Factories/ units to get the Works, completed, estimated cost of completion (as certified by SIC and EIC) exceeds the moneys due to Contractor under this Contract, the Contractor shall either pay the excess amount ordered by CFA or the same shall be recovered from the Contractor by other means. The Ordnance Factories/ units shall also be at liberty to hold and retain in their hands materials, tackle, machinery and stores of all kinds on Site, as they may think proper and may at any time sell any of the said materials, tackle, machinery and stores and apply the proceeds of sale in or towards the satisfaction of any loss which may arise from the cancellation of the Contract as aforesaid. The Ordnance Factories/ units shall also be at liberty to use the materials, tackle, machinery and other stores on Site of the Contractor as they think proper in completing the work and the Contractor will be allowed the necessary credit. The value of the materials and stores and the amount of credit to be allowed for tackle and machinery belonging to the Contractor and used by the Ordnance Factories/ units in completing the work shall be assessed by the SIC and EIC and the amount so assessed shall be final and binding. In case the Ordnance Factories/ units completes or decides to complete the Works or any part thereof under the provision of this Condition, the cost of such completion to be taken into account in determining the excess cost to be charged to the Contractor under this Condition shall consist of the cost or estimated cost (as certified by SIC and EIC) of materials purchased or required to be purchased and/or the labour provided or required to be provided by the Ordnance Factories/ units as also the cost of the Contractors materials used with an addition of such percentage to cover superintendence and establishment charges as may be decided by the CFA, whose decision shall be final and binding. SELECT
20 Submission of Bar Chart/PERT Chart The contractor shall submit a Bar chart / PERT chart showing the completion of the work vis-a-vis the simultaneous progress of independent works/different activities at the same time so as to complete the work within the stipulated time. The chart shall indicate the planning of the work with progress and completion in time. SELECT
21 Execution/Supervision of Work Execution of the subject work shall be carried out strictly as per the specifications mentioned in MES SSR-2009 Part-I and the materials shall be used as per IS specifications. The work shall be executed as instructed / directed by Site In-charge / Engg. In-charge of the work from time to time. The contractor shall follow and execute all works as per the instructions of SIC/EIC with the approval at every stage and then progress the work. The progress of the work shall be recorded day to-day basis in the prescribed work-diary for checking. Agreed for inspection of work at every stage of work . SELECT
22 Approval of Material All good quality of Materials shall be brought by the contractor for incorporation in the work and shall be got checked & approved by the EIC / SIC before incorporating in the work. All ISI marked / EIC approved materials for Building materials and approved branded Electrical materials as directed by EIC shall be supplied by the contractor for incorporation in the work. Agreed for bringing material for incorporation in the work as specified/as directed/as per IS specified and approved. SELECT
23 Plant & Machinery The Plant & Machineries like Concrete Mixer, Vibrator & other machineries like Tools, Tackles, Welding arrangement, Gas cutting equipments etc; has to be arranged by the contractor of his own and shall be in good condition. SELECT
24 Security Instruction Agreed for execution of work inside the factory (Restricted Area) by adhering all Factories and Security Rules & regulations which are in force. Contractor shall engage Indian Nationals after verifying their antecedent and Liability. Contractor should furnish the detail particulars of labourers / workman while engaging inside Factory and Estate area. The contractor should bring the material inside the factory after obtaining due permission and following the procedure laid down by factory authorities strictly, the surplus material after the work is over, shall be allowed to take out after due verification as per the security standing instruction of this factory. SELECT
25 PVR Only the PVR cleared persons will be allowed to go inside the factory and contractor immediately after getting the S.O./Work Order should contact the Security Section and fill up the PVR form of its employees and submit to Security Section. It is the responsibility of contractor to ensure that the PVR of its employees is cleared. Agreed for deploying only Police Verified (PVR) workers. SELECT
26 Character/Antecedents The Contractor would, at his own responsibility expenses get the character/antecedents of his Employees verified through the local policy authority and would employ only such persons in the work. SELECT
27 PVR Clearance The contractor or his representative or every workman so engaged by the contractor for any civil/electrical work should possess PVR clearance. Alternative temporary arrangement like temporary character certificate and Notary affidavit for maximum period of 3 (three) months only pending PVR is allowed. No extension beyond 3 (three) months relaxation shall be allowed. SELECT
28 .......Continued from Clause No. 25.3...... The contractor’s labourers having PVR clearance should have invariably in their possession, the identity by wearing distinguished jackets or red ribbon on their right bicep showing their names and the name of the contractor under whom they are engaged all the time during the working hours or during their stay period inside factory or Estate area for easy identification. SELECT
29 Violation of Security Instruction Punitive action will be taken as deemed fit by the Factory authority, if a contractor is found to be violating the security instructions. It will be at the discretion of the Fy. Authority that a contractor may be banned for further works, in the event of violation of security instructions. SELECT
30 Wearing of Identification Jackets by Contractor’s Labourers The contractor’s labourers & their supervisors entering the Factory shall be required to wear the “MAROON COLOURED JACKET” and the cost of the jacket shall be borne by the contractor only. If the required condition is not followed, the Security officer will have the right to stop the entry of contractor’s labour / Supervisor inside the factory for working. SELECT
31 Identity Card passes The contractor, his agent and representative are required individually to be in possession of identity cards of pass duly verified by the Police Department, the identify card of pass will be examined by the security staff at the time of entry into or exit from the restricted area (s) and also at any time or any number of times inside the restricted area (s). SELECT
32 .......Continued from Clause No. 25.7...... Every workman shall be in possession of an identity card each and every time. The identity cards shall be issued after the search, investigation of the Coincident of workmen by the contractor and attested by the Security In Charge of the area in accordance with the standing rules and regulation of the factory authorities. Contractor should follow all the contract labour/workmen act in the interest of contract labourers. Contractor shall be responsible for the conduct and action of his work agency or representative’s passes will be issued by factory authorities for the entry and exit of contractor labour through Gate-1 only. SELECT
33 Returning of passes identity cards after completion of the work All identity cards and passes shall be returned by the contractor, to the factory authority after the completion of work under this contract. In case of issue of identity cards, the contractor will have to pay penalty as per requisite on the subject. SELECT
34 Search The contractor/labourers have to undergo search any time at sites in restricted areas. SELECT
35 Female Search If the contractor desires to employee female labour on works to be carried out inside the OFBL and female searcher is not borne on the authorized strength of the factory at the time of submission of the tender, he shall be deemed to have allowed on his tender for pay and allowance etc., for female searcher if employed by the contractor inside the area. The General Manager/OFBL decision in regard to the amount recoverable on this account from any contractor shall be final and binding. SELECT
36 Entry of manpower & Vehicle Within the restricted areas: - 1) The contractor or his agent (s)/ representatives working/ materials carts, truck etc. will be allowed to enter the restricted area through the Gate No. 1 of this factory. Thorough search will be through conducted by the security staff for as many time on the Gate is used for entry and / or for exit date for security reasons to any time or any number of times to work site. The contractor shall note that certain time may be lost on account of restriction mentioned in this clause, such as searches etc. thus affecting working hours and therefore the contractor should ensure before quoting against tender. SELECT
37 Condition of Working The work under this contract is in “Restricted/under restricted area” The following are the condition for working with in restricted area. SELECT
38 Definition: Restricted area For the purpose of this contract means the area declared as such by factory authorities. Visit to site within restricted area (s). SELECT
39 .......Continued from Clause No. 25.14...... Permission to either one restricted area (s) before the submission of tender can be obtained from the General Manager, Ordnance Factory Badmal, Bolangir, tenderer are advised to send Prior initiation to the General Manager about particulars of their agents representative etc, if any the dates and times of their proposed visits, so that necessary arrangements may be made by him for admission. The tenderer should have full knowledge of the restrictions of entering inside the factory area and working within the restricted area (s). SELECT
40 Working hours Even though the work is in restricted area for the contractor and his workmen shall be allowed to work from 8.30 AM to 5.00 PM at the work site within the restricted area. SELECT
41 Working in Holidays The contractor shall not carry out work on Gazetted Holidays, Weekly holidays and other working day except when especially authorized in writing to do so by the General Manager of the Factory may at also discretion declare any day as holiday of Non-Working day without assigning any reason for such declaration SELECT
42 Account of Restricted area after completion of the work After the completion of work, surplus stores etc. are to be removed by the contractor or his agents & make the area clean. Representatives of contractor or workmen etc. will have access allowed having any account to the restricted area (s) except for extending of rectification the defects pointed out to him by the JT.GM/WM or by the Engineer In Charge of the work. SELECT
43 Firm precaution: - Firm/contractor should take following precautions The contractor, his agent, representatives, workmen etc., shall strictly follow the order pertaining in firm precaution prevailing within the restricted area. Motor transport vehicle if allowed by the authorities to enter into restricted area must be fitted with serviceable fire extinguishers. Gas welding will not be carried inside the factory area. Advance intimation of 3-4 days will have to be given by the contractor to factory authorities before any electric welding is required to be carried out so that necessary permission can be taken. SELECT
44 Entry/Exit of Material The contractor should bring the material inside the factory after obtaining due permission and following the procedure laid down by factory authorities strictly, the surplus material after the work is over, shall be allowed to take out after due verification as per the security standing instruction of this factory SELECT
45 Safety Instruction The contractor should have to adhere to all the Safety Rules / Regulations laid down by Safety Section / O.F.Badmal & also MIL safety instructions from time to time. Before execution of work, WORK PERMIT should be obtained from Safety Section/Ordnance Factory Badmal. SELECT
46 Appoint of Technical Staff The contractor shall give details of Engineers, Technical persons skilled persons with their qualifications & experience along with the details of plant & machineries, Trucks & other machineries owned by him for execution of the work. Tenderer at action is drawn to condition 25 on page 39 to 42 of IAFW- 2249 (2010) print. SELECT
47 PPEs for Workmen The workmen should be well equipped with protective items like hand gloves, safety goggles, safety shoes, helmet, safety belt etc. SELECT
48 Working on Height The workers engaged to work above 3 mtr. height shall be medically checked and necessary medical certificate shall be produced. SELECT
49 Use of Scaffolding While doing work at height, Scaffolding must be rigidly tied and adequate. Platform if any used must be spacious, safe for movement of men over it. The opening should be avoided so that there is no chance of man falling through it. SELECT
50 Use of Safety Belt Ropes are to be fixed to vertical pillar or cross beams as necessary wherein the end of safety belt can be tied. SELECT
51 Use of Ladder Ladder used for painting must be tied by rope at the top of beams where it is leaned for white washing in nearby area. It should be also held by the helper on the platform. SELECT
52 Painting Work at Height White washer and helper must have adequate experience of work at such height. SELECT
53 Safety Measure Supervisor of contractor must be efficient, technically sound and experienced enough to ensure full safety measures before start of the work. SELECT
54 Inspection of Site Contractor himself inspects the site and gives clearance prior to start the work. SELECT
55 Clearance of Work Commence Unless EIC/Site-In-Charge gives the clearance about adequate safety measures taken by contractor, no work should be started. SELECT
56 Prohibition of drink/drug Workmen should not be under influence of any drinking/drug SELECT
57 Workmen Mental & Health Condition Workmen should be in good health and sound mental condition. SELECT
58 Restriction of Workmen Movement Workmen movement should be restricted to only in the working area and they should not go to any un-authorised place. SELECT
59 Accessibility of road/gantry Workmen should not block the road/gantry/area by dumping the Bldg. materials/boxes. SELECT
60 Precaution while working Workmen should observe general safety precautions by applying commonsense to avoid any incident while working. SELECT
61 First aid box First aid box for immediate use in case of accident should be made available by contractor. SELECT
62 Factory Act & Odisha Factory Rule Workmen should carry the load while working at height in accordance with the Factory Act 1948 & Odisha Factory Rule. SELECT
63 PPE while working in Height Workmen should use safety belt, Helmet while working in height. SELECT
64 Work Permit Proper work permit system mentioning all necessary safety precautions, while working at height should be taken care of. SELECT
65 Area Barricading Barricading the portion on ground beneath working Zone at top. There should not be any movement of the personnel in this area if there is a constant risk of fall of any object from height. SELECT
66 Shut-down of electric supply The contractor is required to take the shutdown of electric supply, day-to day basis, before commencement of work for the purpose, he has to obtain a permit from factory (PS Section) every day in prescribed Proforma and discharge the same after the end of the day work (The shut down can be given between 8.30 A.M. to 4.00 P.M. on all working days). All Safety precaution will be taken by the contractor with regard to safety of workmen working at height on the poles to avoid any electric or other accidents. SELECT
67 Shut-down of furnace/machine Seeking permission from OFBL for the shutdown of furnace or machines wherever required at site. SELECT
68 Display of Work Instruction Further, suitable Safety Precautions/Work instructions may be displayed for all workmen/Supervisor/Fy. Worker/Visitors who are likely to encroach/approach area under construction. SELECT
69 PPEs for Safe guard in Important area Further, to make any essential movement in the aforesaid area, the individual (s) must wear Helmet and other PPEs, safe guard themselves fully, due to likely fall of any object from the height. SELECT
70 Workmen Compensation Act In case of an accident caused to a contractor’s worker while working, the provision of medical treatment and compensation for the period of his absence shall be ensured by the firm and they should be covered under Employee’s State Insurance Scheme or the Workmen Compensation act. All the medical expenses for treatment or medicine is to be borne by the contractor. SELECT
71 Area Clearance The contractor shall make arrangement to clear the area in and around the work site and remove all debris emerged out from the site and deposited at low lying area and levelled as directed by O.F.Badmal. SELECT
72 Execute the work at quoted rate Detailed scope of work involved as per site requirement has been gone through and agreed to execute the work at the quoted rate. SELECT
73 ISO certified Unit Ordnance Factory Badmal, Balangir -767 070 (ODISHA) is an ISO certified unit. Hence, the Contractors / Suppliers are required to comply with various statutory and regulatory provisions related to quality while delivering their products and services at Ordnance Factory Badmal. Failing which, they shall be responsible for contravening the relevant legislative & regulatory provision(s). SELECT
74 Engagement of child labour Child labour shall not be deployed by the contractor for the work. SELECT
75 Clauses applicable to W.O. All clauses & sub-clauses mentioned in the Tender shall be applicable in to any Work Order/Supply Order that is placed as a result of this tender. In case of contradiction, the terms of the W.O/S.O. will prevail over the clauses & sub-clauses of the TE. SELECT
76 COVID-19 All safety precautions regarding COVID-19 shall be invariably followed by bidder as per Government instructions published time to time. SELECT
Name of the Bidder
SPECIAL CONDITIONS OF CONTRACT
Sl.No. CLAUSE SUB-CLAUSE / DESCRIPTION COMPLIANCE SELECT
1 MES SSR-2020 Part-II The terms “General Specification” used in any of the documents following part of this contract refer to the specification contained in the MES schedule of rates 2020 issued from time to time. SELECT YES
2 Contract Labour Act (Regulation and Abolition) (a) The contractor has to follow all the provisions, terms & conditions of the Contract Labour (Regulation and Abolition) Act, 1970 and the latest guidelines issued by the Ministry of Labour & Employment time to time. (b) The contractor has to deposit the EPF as per the provisions of Employees Provident Funds & Miscellaneous Provisions Act, 1952. (c) The contractor has to deposit ESI contribution as per ESI Act 1948. SELECT NO
3 Fair Wages Payment to the labourer The contractor shall have no claim whatsoever if on account of any local regulation or otherwise he is required to pay wages in excess of the minimum wages shown in the Schedule of minimum fair wages. SELECT
4 Visit to Site of Works The tenderer is advised to visit site of work with prior permission of DGM/WM or Engineer in Charge, in Ordnance Factory Badmal, Balangir and make himself familiar with the working condition acceptability which effect the execution and completion of work. SELECT
5 Store and Material (Refer condition 11 of IAFW- 2249) The contractor shall after the approval of the samples by DGM/WM or Engineer In Charge, obtain stores, material and equipment from the approved firms or through their authorised agents only. As a proof that the materials are obtained from the approved firms/ their authorised agents, the contractor shall produce such evidence to the satisfaction of DGM/WM or Engineer In Charge as regards to the quality of the materials. SELECT
6 Signing of Contract Document The person signing the tender on behalf of another or on behalf of a firm shall attach with the tender a proper power of attorney duly executed in his favour by such other person or by all the partners stating that he has authority to bind such other person or including the arbitration clause. SELECT
7 Damage or Loss of inventory items borne on the list of CM/ PS/MM/ES Section In course of execution of the different items of work if any inventory items are damaged or broken or lost by contractor or by his men the appropriate cost of the same will be recovered from the contractor. The decision of the Chief General Manager in this regard will be final and binding to this contractor. SELECT
8 Submission of Indemnity Bond The contractor has to submit the Notarised Indemnity Bond in India Non Judicial Stamp Paper as per Format mentioned in the Tender Attachments immediately after receipt of LOI. SELECT
Name of the Bidder
EVALUATION CRITERIA
Sl.No. CLAUSE FIRM MUST ATTACH THE SELF-ATTESTED COPIES OF THE FOLLWING DOCUMENTS ALONGWITH THE BID COMPLIANCE SELECT
1 EMD (Earnest Money Deposit) (Fixed Deposit Receipt ) FDR towards requisite EMD amount as per amount published in NIT. (The EMD should be from any Nationalised Bank or ICICI/HDFC/AXIS Bank in the name of MUNITIONS INDIA LIMITED_ORDNANCE FACTORY BADMAL payable at SBI Badmal, Branch Code-008703). SELECT
2 License for execution of Civil/Electrical Work. 1. Valid Registration for execution of Civil works(For Civil tender) /Electrical Works (For Electrical tender) with any Govt. department/PSUs/MSME/NSIC/MIL Units. SELECT YES
3 Experience certificate of last 07 years Experience of having successfully completed Similar nature of Civil works i.e Building Works/Roads repair works/Water supply & sewage Disposal/Runways and Pavements and for Electrical Works i.e. Low Tension Electric Works (up to 1100 volts) / High Tension Electric Works (Excluding 33KV)/ 33KV and extra High Voltage Installations in Central Govt., State Govt. etc. /PSUs during last 7 years ending last day of month previous to the one in which applications are invited, should be either of the following. (i) 03 (three) Similar nature of Works each costing not less than 40% of the estimated cost. OR (ii) 02 (two) Similar nature of Works each costing not less than 50% of the estimated cost. OR (iii) 01 (one) Similar nature of Work costing not less than 80% of the estimated cost. SELECT NO
4 Turnover of last 03 years Average Annual Financial Turnover duly certified by C.A. during last 3 years, ending 31st March of the previous financial year , shall be at least 30% of the estimated cost . The bidders financial capability shall be decided based on the average annual turnover. (SPECIFY YEAR WISE TURN OVER) SELECT
5 PAN/TAN PAN/TAN Card. PAN No. should be submitted in the name of firm/Proprietor. SELECT
6 GSTIN Goods & Service Tax Identification No. (GSTIN)/Any other valid registration statutory registration as required by law. SELECT
7 Certificate regarding not debarred/ black listing Affidavit or Certificate in firm's letter head that firm is not Debarred /Black listed from any Govt. deptt.,PSU,etc. and no litigation is pending against the firm. Date of Affidavit or certificate must be on or after the NIT Publication date. SELECT
8 Certificate regarding understanding terms & conditions Certificate in firms letter head that, thay have read and fully understood all terms & condition of the tender and procedure laid down in MES SSR 2009 Part-I, IAFW 2249, MES manual on contracts 2020 & its latest amended version and undertook, themselves to abide by them. SELECT
9 Company Deed Relevant documents showing company deed, if any. SELECT
Name of the Bidder
CHECKLIST ATTACHMENT
Sl.No. FIRM MUST ATTACH THE FOLLWING DOCUMENTS ALONGWITH THE BID COMPLIANCE
1 Scanned Copies of requisite EMD amount (as per amount published in NIT) to be up-loaded in the CPP Portal https://etenders.gov.in N.B.: (i) Original Fixed Deposit Receipt in sealed envelope. SELECT NOT COMPLIED
2 Self attested copies of valid Registration/license for execution of Civil works (For Civil tender) /Electrical Works (For Electrical tender) with Central Govt., State Govt./PSU/MSME/NSIC/MIL Units (SPECIFY THE NAME OF THE ORGANISATIONS WHERE PRESENTLY ENLISTED WITH) SELECT
3 Self-attested copies of completion certificate or work executed during last seven years work completion certificate issued by MES, CPWD, State PWD, Indian Railway, Indian Ordnance Factories, PSUs, Other Central/State Govt Organisations. SELECT
4 Self -attested copies of Average Annual Financial Turnover duly certified by C.A. during last 3 years, ending 31st March of the previous financial year. SELECT
5 Self-attested copies of PAN Card. Note - PAN No. should be submitted in the name of firm/Proprietor. SELECT SELECT
6 Self-attested copy of GSTIN (Goods & Service Tax Identification No.) SELECT COMPLIED
7 Affidavit or self-attested Certificate in firm's letter head that firm is not Debarred/Blacklisted from any Govt. deptt., PSU, etc. and no litigation is pending against the firm. Date of Affidavit or Certificate must be on or after the NIT Publication date. SELECT
8 Certificate in firms letter head that, thay have read and fully understood all terms & condition of the tender and procedure laid down in MES SSR 2009 Part-I, IAFW 2249, MES manual on contracts 2020 & its latest amended version and undertook, themselves to abide by them. SELECT
9 Scanned copy of postal/courier receipt along with the scanned copy of EMD incase it is forwarded through post/courier. SELECT
10 Self-attested copies of relevant documents showing company deed, if any. SELECT
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: Chief General Manager, Ordnance Factory Badmal, Balangir, Odisha (A unit of Munitions India Limited, Pune)
Name of Work: Periodical services to the buildings of Ordnance Factory Hospital, Badmal
Contract No: 3012/OFBL/TE-41(2025-26)RD2540/EO(C) ,Date. 10.03.2026
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Periodical services to the buildings of Ordnance Factory Hospital, Badmal
1.01 M & L for cutting chases, pinning in. making good to facings where required and pointing in cement mortar 1:3 to wall cracks.(Cutting not exc 10 cm girth). Item 1 RM Excess(+) Full Conversion INR
1.02 Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. and rendering 15mm thick cement plaster (1:4) on fair faces of brick work or concrete sur faces Item 2 Sqm Excess(+) Full Conversion INR
1.03 Preparation of old painted plastered surfaces by brushing with steel wire brush and scraping down all loose dirt, dust, paint etc. and applying two coats of plastic emulsion paint on wall & celing as per the direction of Engineer-In-Charge. Item 3 Sqm Excess(+) Full Conversion INR
1.04 Preparation of old painted plastered surfaces by brushing with steel wire brush and scraping down all loose dirt, dust, paint etc. and applying two coats of oil bound distemper on wall as per the direction of Engineer-In-Charge. Item 4 Sqm Excess(+) Full Conversion INR
1.05 Preparation of old painted plastered surfaces by brushing with steel wire brush and scraping down all loose dirt, dust, paint etc. and applying two coats of oil bound distemper on ceiling as per the direction of Engineer-In-Charge. Item 5 Sqm Excess(+) Full Conversion INR
1.06 Preparation of old wood and wood based surfaces and applying two coat of synthetic enamel paint over a coat of pink primer. Item 6 Sqm Excess(+) Full Conversion INR
1.07 Material & labour for preparation of old painted steel surfaces of any description, over 10cm in width or girth, not otherwise described and applying two coat of synthetic enamel paint over a coat of red oxide zinc chrome primer. Item 7 Sqm Excess(+) Full Conversion INR
1.08 M & L, for applying Two or more coats of 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm over new surfaces. Item 8 Sqm Excess(+) Full Conversion INR
1.09 Material & labour for preparation of old painted steel surfaces of any description, over 10cm in width or girth, not otherwise described and applying two coat of aluminium paint over a coat of aluminium red oxide primer. Item 9 Sqm Excess(+) Full Conversion INR
1.1 M&L for French polishing on surfaces of any description, width or girth including cleaning and preparing the surface including a coat of wood filler on new works with two or more coats (old work). Item 10 Sqm Excess(+) Full Conversion INR
1.11 Hacking out old broken glass (any thickness, size,quality or description) from metal frame exceeding 1.5sqm.including punching or drilling out old glazing pins/spring clips and providing and fixing new ones and Supply and fixing sheet glass ordinary quality of 3mm.thickness and glazing with oil putty in square not exceeding 0.5sqm.in each pane and also painting new putty to match existing painting. Item 11 Sqm Excess(+) Full Conversion INR
1.12 M & L securing old glass in metal in frames glazed with oil putty/ beads, including removing loose or decayed putty/beads, painting / oiling one coat on rebates, grooves, reputtying and painting/oiling puttied surface to match existing work. Item 12 RM Excess(+) Full Conversion INR
1.13 M&L for old size brick work with fly ash brick straight or curve on plan exceeding 6m mean radius built in 1:6 cement mortar. Item 13 Cum Excess(+) Full Conversion INR
1.14 M&L, for rendering 15mm thick cement plaster (1:6) cement mortar on fair faces of brick work or concrete surfaces. Item 14 Sqm Excess(+) Full Conversion INR
1.15 Writing letters or figures (Block.Roman, Italic or Indian) of 15 cm high Item 15 No. Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BiddersComplianceforTE-41-2025-26.xls
Tender Documents • 0.09 MB
BOQ_315120.xls
BOQ • 0.24 MB
Indemnity-Bond.pdf
Additional Documents • 0.01 MB
Remedial-Measure-of-Safety-During-Execution-of-Work.pdf
Additional Documents • 0.51 MB
Specification-of-PS.pdf
Additional Documents • 1.32 MB
IMPORTANT-NOTE-CIVIL-ELECTRICAL-WORKS.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid