Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
12 Jan 2025, 9:05 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Engineer Officer
The Commanding Officer for Engineer Officer ICGS Sarthak
Routines on NOVEC system to be undertaken as per RFP
2025_ICG_692070_1
344/62/EN/STK/24-25
Single
Marine Works
Works
60 days
Porbandar
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
13 Jan 2025
7 Jan 2025
13 Jan 2025
7 Jan 2025
12 Jan 2025
7 Jan 2025
Yearly routine on NOVEC 1230
E-637 Yearly routines on NOVEC fire fighting system will be falling due tentatively in early Feb 25. Following jobs are to be undertaken as per maintenance schedule (a) Check protected enclosure for structural changes:- (i) Dimensions (ii) Use (iii) Fire loads (b) Check the protected enclosure for permeability:- (i) Devices that prevent unintentional opening (c) Check documentation and labels:- (i) Report book (ii) Operating manual (iii) System labeling (iv) Labeling of the protected enclosure, escape routes, etc. (d) Check activations and switch-offs ventilation fans, pumps, incinerator, purifier, AHU etc in the event of an alarm through manual release. (e) Check the relaying of alarms. (f) Check electrical release devices. (g) Check pneumatic release devices:- (i) Activation through pneumatic release device (PAE). (h) Check manual release devices. (j) Visual inspection of valves fitted on NOVEC cylinder along with electrical components. (k) Check component for damage and function as necessary :- (i) Valves (ii) Hoses (iii) Check valves. (l) Check the extinguishing agent containers:- (i) Status (ii) Fastening (iii) Function of the contact pressure gauge. (m) Check pipelines, discharge nozzles. (n) Check supplemental components (i) Fire alarm boxes (ii) pressure compensating devices- Function, Permeability of the flaps (c) Alarm equipment. (p) Check NOVEC discharge display boards. (q) Check all sections Remote release and local release operation with 30 Sec time delay. (r) Check Pneumatic release at 40 sec time delay.
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .