Tender Value
₹15.8 Cr
EMD Value
₹25.8 L
Closing Date
20 Aug 2026, 6:30 pm
Director HBCHRC
HBCHRC, Aganampudi,Gajuwaka Mandal,Visakhapatnam.
Setting up of 3.0MW In-house Captive Solar PV Plant at HBCHRC, Visakhapatnam including Planning, Design, Supply, Installation, Testing, Commissioning with One Year DLP, followed by Ten Years of Comprehensive Annual Operation and Maintenance.
2026_TMC_916580_1
HBCHRC/Elec/3MW/2026-27/NIT/03 dated 09/07/2026
Open Tender
Electrical Works
EPC Contract
270 days
HBCHRC, Aganampudi, Gajuwaka Mandal, Visakhapatnam
As per NIT
2 documents required · 2 mandatory
₹0
₹25.8 L
HBCHRC, Aganampudi,Gajuwaka Mandal,Visakhapatnam
9 Jul 2026
9 Jul 2026
28 Aug 2026
9 Jul 2026
20 Aug 2026
7 Aug 2026
9 Jul 2026 - 27 Jul 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART-A (Electrical & Mechanical Works) :-
Planning, Design, Supply, Installation, Testing and Commissioning of In-house captive Solar Photovoltaic Power Plant conforming to MNRE/NREDCAP/APEPDCL/APTRANSCO specifications/Guidelines as amended, including obtaining/securing all statuatory approvals/clearances. SITC of Modules of Mono Crystalline silicon solar cells Topcon N-Type, necessary protections, earthing, mounted on GI structure of suitable strength with following components complete as required:- a) Solar Photovoltaic Module of capacity minimum 600 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730-Part-1, IS/IEC 61730-Part-2. Solar Photovoltaic Module conversion. PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b) Power Conditioning Unit (PCU) of 160-1000 V DC Input voltage range and 400-440 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC Power with efficiency not less than 97%, total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 degree C. The PCU shall adjust the voltage and frequency level to suit the Grid Voltage Frequency. c) Data Monitoring System complete with accessories(SCADA Based). d) Fixing of Array junction box & Main junction box with IP 65 protection and termination arrangement for incoming and outgoing cable along with glands, lugs and other accessories etc. as required. e) Lightning and surge voltage protection. f) Connections & Interconnections by supplying & fixing required size XLPE insulated copper conductor armoured power and control cables between solar modules, main power cable to grid supply PCU unit along with supplying & fixing of necessary channel/conduit lugs and other accessories etc. as required. Post commissing Defect Liability Period (DLP) for One Year which includes comprehensive Annual Operation and Maintenance of the plant with Manpower at its full capacity as per the specification, terms and conditions of the agreement. The capacity shown shall be considered as DC capacity. As specified in technical specifications and scope of work of Technical Document. | 3,000 | KWp | - | - |
| 2 | PART-B (Civil Works) :-
Civil Structures Planning, Surveying, Alignment, Structural Designing, Structural Stability Certification, Architectural & Shop Drawings etc., As specified in technical specification and scope of work of Technical Document. | 3,000 | KWp | - | - |
| 3PART-C (Comprehensive O&M) :- Comprehensive Annual Operation and Maintenance (O&M) of 3MW solar power plant for 10 years from the date of completion of DLP period with Manpower as per the specification, terms and conditions of the agreement. (Including all civil, Structural, Finishing, water supply system etc., complete in all aspects). As specified in technical specifications. Payment shall be made on Quaterly basis after submission of serivce reports and guaranteed generation reports as per technical specification and scope of work. Refer Section-15 of Technical Document. | |||||
| 3.01 | 1st year | 3,000 | KWp/Year | - | - |
| 3.02 | 2nd year | 3,000 | KWp/Year | - | - |
| 3.03 | 3rd year | 3,000 | KWp/Year | - | - |
| 3.04 | 4th year | 3,000 | KWp/Year | - | - |
| 3.05 | 5th year | 3,000 | KWp/Year | - | - |
| 3.06 | 6th year | 3,000 | KWp/Year | - | - |
| 3.07 | 7th year | 3,000 | KWp/Year | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
LT.pdf
Additional Documents • 0.62 MB
FA.pdf
Additional Documents • 0.47 MB
BOQ_963251.xls
BOQ • 0.29 MB
FORMSATOM.xls
Tender Documents • 0.07 MB
Conceptualplantentative.pdf
Additional Documents • 4.15 MB
Technicaldocument.pdf
Additional Documents • 2.63 MB
TD.pdf
Tender Documents • 2.91 MB
CORRIGENDUM.pdf
PDF • 22.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].