| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L Quoted ₹3.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.4 LRejected-AOC | ₹3.4 L | L2 | Rejected-AOC L2 |
| 3 | L3₹3.4 LRejected-AOC | ₹3.4 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | BINU.V.G L2 | Simnesh ms L3 | E.J.RAJU L1 |
|---|---|---|---|---|---|---|
| 1.00EDA BUND | ||||||
| 1.00 | OD384780/2025-2026:Hire and labour charges for Arecanut post and wailing piece in digging,conveyance etc.complete and removing the same after use | 560 | RM | 90.5 ₹50,680 | 90.51 ₹50,685.6 | 85.16 ₹47,689.6 |
| 1.00 | OD384779/2025-2026:Hire and labour charges for supplying at site full arecanut post of length specified by deptl, officers | 270 | RM | 43.02 ₹11,615.4 | 43.04 ₹11,620.8 | 37.1 ₹10,017 |
| 1.00 | OD384781/2025-2026:Engaging earth excavator including all charges | 14 | hour | 1,342.22 ₹18,791.08 | 1,342.23 ₹18,791.22 | 1,263 ₹17,682 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 19.12 | cum | 257.62 ₹4,924.66 | 257.63 ₹4,924.86 | 242.42 ₹4,634.1 |
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 110 | sqm | 18.18 ₹1,999.8 | 18.19 ₹2,000.9 | 17.1 ₹1,881 |
| 1.01 | OD384776/2025-2026:Screening with double 1/2 split arecanut reepers 50cm both ways and tying with coir etc. including removing after use | 197.6 | sqm | 95.85 ₹18,939.96 | 95.86 ₹18,941.94 | 90.2 ₹17,823.52 |
| 1.01 | OD384777/2025-2026:Thambakam wood wrought and put up for shutter planks cost | 3,924 | cud m | 31.08 ₹1,21,957.92 | 31.09 ₹1,21,997.16 | 29.25 ₹1,14,777 |
| 1.01 | 50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. | 158.12 | cum | 445.7 ₹70,474.08 | 445.71 ₹70,475.67 | 419.4 ₹66,315.53 |
| 1.01 | OD384778/2025-2026:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent,testing of Joints complete as per direction of engineer in charge.Using 250 mm dia 64Kgf/cm2 ISI quality PVC pipe excluding cost of trenching & filling | 14 | metre | 2,624.38 ₹36,741.32 | 2,624.39 ₹36,741.46 | 2,469.55 ₹34,573.7 |
Tender Value
₹3.4 L
EMD Value
₹8,404
Closing Date
3 Feb 2026, 2:00 pmClosed
AE LID EW
AE LID EW
Annual Plan-273PVK/25-26/ Idabund construction in various wards-Idabund construction in various wards-General Civil Work
2026_LSGD_830888_1
0826/AE/LSGD/PVK/25-26
Open Tender
Civil Works - Others
PUTHENVELIKKARA
Please refer Tender documents.
10 documents required · 10 mandatory
₹745
Yes
₹8,404
Yes
25 Jun 2026
27 Jan 2026
4 Feb 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
EDA BUND
OD384780/2025-2026:Hire and labour charges for Arecanut post and wailing piece in digging,conveyance etc.complete and removing the same after use
OD384779/2025-2026:Hire and labour charges for supplying at site full arecanut post of length specified by deptl, officers
OD384781/2025-2026:Engaging earth excavator including all charges
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD384776/2025-2026:Screening with double 1/2 split arecanut reepers 50cm both ways and tying with coir etc. including removing after use
OD384777/2025-2026:Thambakam wood wrought and put up for shutter planks cost
50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
OD384778/2025-2026:Providing and fixing PVC pipes includings jointing of pipes with one step PVC solvent,testing of Joints complete as per direction of engineer in charge.Using 250 mm dia 64Kgf/cm2 ISI quality PVC pipe excluding cost of trenching & filling
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1396005.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1396005.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.79 MB
Download all tender documents and submit your bid